HomeMy WebLinkAboutLA164644 8066 201st St W Permit PackRESIDENTIAL BUILDING
PERMIT APPLICATION
CITY OF LAKEVILLE
BUILDING INSPECTIONS DEPARTMENT
20195 HOLYOKE AVENUE
LAKEVILLE, MN 55044
952-985-4440
Office Use Only
__________________
Permit Number
___________________
Received By
___________________
Date Received
______ _______
Fee Total
SITE ADDRESS:
MAILING ADDRESS: CITY: STATE: ZIP:
JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________
LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________
ESTIMATED VALUATION: PROPOSED START DATE: END DATE:
(New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION:
APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL
NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED)
PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License)
RESIDENT OWNER
NAME:_______________________________________________________________________________
HOME PHONE #:_____________________________ CELL PHONE:___________________________
GENERAL CONTRACTOR
Homeowner
Contractor
CONTRACTOR:_______________________________________________________________________
LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE)
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
PLUMBING WORK
Homeowner
Contractor
CONTRACTOR:__________________________________________LICENSE #: PM______________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
MECHANICAL WORK
Homeowner
Contractor
CONTRACTOR:________________________________________ _______________________________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
BOND #:_______________________________________ EXPIRATION DATE____________________
SEWER/WATER CONTRACTOR
New Construction Only
NAME:________________________________________________ ______________________________
HOME PHONE _____________________________ CELL PHONE:______________________________
BOND #:_______________________________________ EXPIRATION DATE____________________
INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE
ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY
APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND
ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND
WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START
WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN.
NAME OF APPLICANT (Please Print)DATE
APPLICANT’S SIGNATURE:
www.lakevillemn.gov
8066 201st St
Lakeville MN 55044
New Single Family Dwelling
n/a
$305,000.00 10.1.2018 5.1.2018
3 4 Berres Ridge 3rd
■
■
invoices@stonecottage.com
Stone Cottage Construction, Inc.
636874
952.388.1301 651.261.1633
14787 Energy Way Apple Valley MN 55124
Scherer Plumbing
952.447.6734
15548 Red Oaks RD SE Prior Lake MN 55372
Lofgren Heating & Air Conditioning
952.431.5811
5708 Upper 147th ST W Apple Valley MN 55124
Bohn Well Drilling
952.445.4809
Troy Asleson - President - Stone Cottage Construction, Inc.09.13.2018
✘
✘
✘
RESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT DECK FOOTING
CONDO FIREPLACE
ACESSORY BUILDING FOOTING
REROOF FOUNDATION
RESIDE FRAMING
PORCH FRAMING
GARAGES
INSULATION
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES LATH
LOWER LEVEL FINISH LOWER LEVEL FINAL
ADDITION OTHER
FOUNDATION ONLY PORCH FOOTING
MISCELLANEOUS POURED WALL
DEMO SEPTIC TANK REMOVAL
MOVED SITE
MECHANICAL
CITY BUILDING VALUATION: $AIR TEST
FINAL
BUILDING PERMIT FEES ROUGH-IN
$PERMIT FEE PLUMBING
$PLAN CHECK FINAL
$SURCHARGE ROUGH-IN
$METRO SAC METER SIZE
$CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE
$CITY SEWER HOOKUP UNIT SEWER/WATER
$LANDSCAPE ESCROW SEWER/WATER
$TREE ESCROW FINAL
$MISC ESCROW STREET DRAINTILE
$PLUMBING BUILDING INFORMATION
$MECHANICAL TYPE OF CONSTRUCTION
$SEWER WATER ZONING
$OTHER CODE EDITION
$TOTAL FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
Concept Approval ONLYSubject to Field InspectionInspectorDate2015MN BldgCode09/25/2018dmathews
Smoke134.54.52.53.5UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.
266PFHPFHPFH4336263.52.53.753.7525.5144.334Strap
4.66StrapVerify loads with girdertruss spec, may requireremoval of top plates atbearing for crushing.2222222222222332324-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).
ProductsPlotID Length ProductPlies Net QtyTS2-2 40' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand® LSL 22TS1 40' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand® LSL 1 2TS3 36' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand® LSL 1 3TS4 26' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand® LSL 1 6TS5 18' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand® LSL 1 6TS6 12' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand® LSL 1 15TS7-2 26' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL2 2TS8 8' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL 1 1TS9-2 6' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL 2 2Rim 16' 0" 1 1/8" x 11 7/8" TJ® Rim Board 1 11Wall FramingPlotID Length ProductPlies Net QtyTSHd1-2 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL 2 2BBOHd1-2 7' 0" 2 x 10 SPF No.1/No.2 2 2BBOHd2-3 6' 0" 2 x 10 SPF No.1/No.2 3 3BBOHd3-2 3' 0" 2 x 10 SPF No.1/No.2 2 2Framing Connector SummaryPlotID Qty Manuf Product Face Nails Top Nails Member Nails Web StiffH1 1 Simpson HU9 18- 10d common - 6- 10d x 1-1/2 NoH2 4 Simpson LUS210 8- 10d common - 4- 10d common No Start Joist Layout Here. 19.2" o/cCSCSCSCSCSCSCSTS9-2TS7-2TS8BBOHd3-2TS2-2RimRimRimRimRimRimRimRimRimRimRimRimRimRimRimSquash BlockingSquash BlockingH13-2x10 Trtd.3-2x12 Trtd.3-2x8 Trtd.3-2x8 Trtd.TSHd1-2BBOHd2-3BBOHd1-2TS619.2" O.C.TS619.2" O.C.TS519.2" O.C.TS319.2" O.C.TS119.2" O.C.TS419.2" O.C.H23x5 PSL3 TrimmersCustomer:Job Name:Address/Lot:Stone CottageAlex & Brittany Schwartzwald8066 201st St WCity, State:Lakeville, MNPlan/Model #:#18-183Job Number:23095Lyman Lumber Company18900 West 78th StPO Box 130Chanhassen, MN(952) 470-4800Sheet:1of 3A complete Javelin™ framing plan requires the Framer's Pocket GuideSee the Framer's Pocket Guide for Product Trademark InformationDrawn By:Jeff D.Drawn Date:8/29/2018Revised By:Revision Date:Revision #:SALES PRESENTATION DRAWING:NO STRUCTURAL OR DIMENSIONAL CHECK HAS BEEN PERFORMED ON THIS DRAWING. LYMAN LUMBER COMPANY IS ONLY RESPONSIBLE FOR INDIVIDUAL MEMBER DESIGN,BASED UPON THE ASSUMED VERTICAL LOADS. BUILDER IS RESPONSIBLE FOROVERALL DESIGN OF THE STRUCTURE AND IT IS STRONGLY RECOMMENDEDTHAT ALL DRAWINGS AND CALCULATIONS BE REVIEWED BY THEENGINEER OF RECORD FOR THIS PARTICULAR PROJECT.Lack of proper bracing during construction can result in seriousaccidents. Observe the following guidelines:1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed.2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also beaccomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay.3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist.Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker orone layer of unnailed sheathing.5. Ends of cantilevers require safety bracing on both the top and bottom flanges.6. The flanges must remain straight within 1/2" from true alignment.4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system.WARNING NOTES:WARNINGJoists are unstable until braced laterallyBracing Includes:BlockingHangersSheathingRim BoardStrut LinesRim JoistDO NOT stack buildingmaterials on unsheathedjoists. Stack only overbeams or walls.DO NOT walk on joiststhat are lying flat.DO NOT walk on joistsuntil braced.INJURY MAY RESULT.Weyerhaeuser, iLevel®, Microllam®, Parallam®, Silent Floor®, TimberStrand®, TJI®, TJ® and Trus Joist® areregistered trademarks of Weyerhaeuser NR. © 2012 Weyerhaeuser NR Company. All rights reserved.Header Spans:Up to 4'-11" = 1 Trimmer5'-0" and Bigger = 2 Trimmers*** Unless Noted Otherwise ***
ProductsPlotID Length ProductPlies Net QtyTS1-2 20' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL2 2TS2-2 14' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL2 4TS3-2 8' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL 24TS4-2 12' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL 22TS5-2 8' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL 2 2TS6-2 20' 0" 1 3/4" x 7 1/4" 1.55E TimberStrand® LSL 22BBO1-2 12' 0" 2 x 12 SPF No.1/No.2 2 2Wall FramingPlotID Length ProductPlies Net QtyTSHd1-2 8' 0" 1 1/2" x 9 1/2" 1.5E TimberStrand® LSL 22TSHd2-3 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL 3 3BBOHd1-3 9' 0" 2 x 10 SPF No.1/No.2 3 3BBOHd2-3 7' 0" 2 x 10 SPF No.1/No.2 3 3BBOHd3-2 6' 0" 2 x 10 SPF No.1/No.2 2 2BBOHd4-2 4' 0" 2 x 10 SPF No.1/No.2 2 2BBOHd4-2 3' 0" 2 x 10 SPF No.1/No.2 2 2Framing Connector SummaryPlotID Qty Manuf Product Face Nails Top Nails Member Nails Web StiffH1 1 Simpson HHUS410 30- 16d common - 10- 16d double shear NoBBOHd3-2BBOHd2-3BBO1-2TS1-2TS6-2TS2-2TS3-2Girder TrussGirder TrussGirder TrussTS3-2TS5-2TS4-2H1BBOHd4-2TSHd1-2BBOHd1-3TSHd2-3BBOHd4-2TS2-25x7 PSLTapered End Cut Allowed if Needed← Floor Trusses →Customer:Job Name:Address/Lot:Stone CottageAlex & Brittany Schwartzwald8066 201st St WCity, State:Lakeville, MNPlan/Model #:#18-183Job Number:23095Lyman Lumber Company18900 West 78th StPO Box 130Chanhassen, MN(952) 470-4800Sheet:2of 3A complete Javelin™ framing plan requires the Framer's Pocket GuideSee the Framer's Pocket Guide for Product Trademark InformationDrawn By:Jeff D.Drawn Date:8/29/2018Revised By:Revision Date:Revision #:SALES PRESENTATION DRAWING:NO STRUCTURAL OR DIMENSIONAL CHECK HAS BEEN PERFORMED ON THIS DRAWING. LYMAN LUMBER COMPANY IS ONLY RESPONSIBLE FOR INDIVIDUAL MEMBER DESIGN,BASED UPON THE ASSUMED VERTICAL LOADS. BUILDER IS RESPONSIBLE FOROVERALL DESIGN OF THE STRUCTURE AND IT IS STRONGLY RECOMMENDEDTHAT ALL DRAWINGS AND CALCULATIONS BE REVIEWED BY THEENGINEER OF RECORD FOR THIS PARTICULAR PROJECT.Lack of proper bracing during construction can result in seriousaccidents. Observe the following guidelines:1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed.2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also beaccomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay.3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist.Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker orone layer of unnailed sheathing.5. Ends of cantilevers require safety bracing on both the top and bottom flanges.6. The flanges must remain straight within 1/2" from true alignment.4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system.WARNING NOTES:WARNINGJoists are unstable until braced laterallyBracing Includes:BlockingHangersSheathingRim BoardStrut LinesRim JoistDO NOT stack buildingmaterials on unsheathedjoists. Stack only overbeams or walls.DO NOT walk on joiststhat are lying flat.DO NOT walk on joistsuntil braced.INJURY MAY RESULT.Weyerhaeuser, iLevel®, Microllam®, Parallam®, Silent Floor®, TimberStrand®, TJI®, TJ® and Trus Joist® areregistered trademarks of Weyerhaeuser NR. © 2012 Weyerhaeuser NR Company. All rights reserved.Header Spans:Up to 4'-11" = 1 Trimmer5'-0" and Bigger = 2 Trimmers*** Unless Noted Otherwise ***
Wall FramingPlotID Length Product Plies Net QtyBBOHd1-2 9' 0" 2 x 10 SPF No.1/No.2 2 2BBOHd3-3 7' 0" 2 x 10 SPF No.1/No.2 3 3BBOHd2-2 7' 0" 2 x 10 SPF No.1/No.2 2 4BBOHd4-2 6' 0" 2 x 10 SPF No.1/No.2 2 4BBOHd5-2 3' 0" 2 x 10 SPF No.1/No.2 2 2Girder TrussGirder TrussBBOHd4-2Girder TrussGirder TrussBBOHd3-3BBOHd1-2BBOHd2-2BBOHd2-2BBOHd5-2BBOHd4-2Customer:Job Name:Address/Lot:Stone CottageAlex & Brittany Schwartzwald8066 201st St WCity, State:Lakeville, MNPlan/Model #:#18-183Job Number:23095Lyman Lumber Company18900 West 78th StPO Box 130Chanhassen, MN(952) 470-4800Sheet:3of 3A complete Javelin™ framing plan requires the Framer's Pocket GuideSee the Framer's Pocket Guide for Product Trademark InformationDrawn By:Jeff D.Drawn Date:8/29/2018Revised By:Revision Date:Revision #:SALES PRESENTATION DRAWING:NO STRUCTURAL OR DIMENSIONAL CHECK HAS BEEN PERFORMED ON THIS DRAWING. LYMAN LUMBER COMPANY IS ONLY RESPONSIBLE FOR INDIVIDUAL MEMBER DESIGN,BASED UPON THE ASSUMED VERTICAL LOADS. BUILDER IS RESPONSIBLE FOROVERALL DESIGN OF THE STRUCTURE AND IT IS STRONGLY RECOMMENDEDTHAT ALL DRAWINGS AND CALCULATIONS BE REVIEWED BY THEENGINEER OF RECORD FOR THIS PARTICULAR PROJECT.Lack of proper bracing during construction can result in seriousaccidents. Observe the following guidelines:1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed.2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also beaccomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay.3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist.Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker orone layer of unnailed sheathing.5. Ends of cantilevers require safety bracing on both the top and bottom flanges.6. The flanges must remain straight within 1/2" from true alignment.4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system.WARNING NOTES:WARNINGJoists are unstable until braced laterallyBracing Includes:BlockingHangersSheathingRim BoardStrut LinesRim JoistDO NOT stack buildingmaterials on unsheathedjoists. Stack only overbeams or walls.DO NOT walk on joiststhat are lying flat.DO NOT walk on joistsuntil braced.INJURY MAY RESULT.Weyerhaeuser, iLevel®, Microllam®, Parallam®, Silent Floor®, TimberStrand®, TJI®, TJ® and Trus Joist® areregistered trademarks of Weyerhaeuser NR. © 2012 Weyerhaeuser NR Company. All rights reserved.Header Spans:Up to 4'-11" = 1 Trimmer5'-0" and Bigger = 2 Trimmers*** Unless Noted Otherwise ***
Stone Cottage
HVAC Load Calculations
for
Schwartzwald
8066 201st St
Lakeville,mn
Prepared By:
Randy Andrews
Lofgren Heating
5708 Upper 147th Street West
Apple Vallley, MN 55124
Monday, August 27, 2018
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 2
Project Report
General Project Information
Project Title:Stone Cottage
Project Date:Monday, August 27, 2018
Client Name:Schwartzwald
Client Address:8066 201st St
Client City:Lakeville,mn
Company Name:Lofgren Heating
Company Representative:Randy Andrews
Company Address:5708 Upper 147th Street West
Company City:Apple Vallley, MN 55124
Company E-Mail Address:rrandrews@lofgrenheating-ac.com
Design Data
Reference City:Minneapolis, Minnesota
Building Orientation:Front door faces North
Daily Temperature Range:Medium
Latitude:44 Degrees
Elevation:834 ft.
Altitude Factor:0.970
Elevation Sensible Adj. Factor:1.000
Elevation Total Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter:-15 -15.33 80%n/a 72 n/a
Summer:88 72 47%50%75 29
Check Figures
Total Building Supply CFM:1,186 CFM Per Square ft.:0.329
Square ft. of Room Area:3,609 Square ft. Per Ton:1,267
Volume (ft³) of Cond. Space:30,036
Building Loads
Total Heating Required Including Ventilation Air:53,944 Btuh 53.944 MBH
Total Sensible Gain:25,646 Btuh 80 %
Total Latent Gain:6,222 Btuh 20 %
Total Cooling Required Including Ventilation Air:31,868 Btuh 2.66 Tons (Based On Sensible + Latent)
2.85 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\8066 201ST LAKEVILLE.rhv Monday, August 27, 2018, 12:22 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 3
Load Preview Report
Scope
Has
AED
Net
Ton
ft.²
/Ton Area
Sen
Gain
Lat
Gain
Net
Gain
Sen
Loss
Sys
Htg
CFM
Sys
Clg
CFM
Sys
Act
CFM
Duct
Size
Building 2.66 1,359 3,609 25,646 6,222 31,868 53,944 1,028 1,186 1,186
System 1 No 2.66 1,359 3,609 25,646 6,222 31,868 53,944 1,028 1,186 1,186 21x10
Ventilation 340 1,352 1,692 4,550
Zone 1 3,609 25,306 4,870 30,176 49,394 1,028 1,186 1,186 21x10
1-Main Level 1,164 10,961 1,831 12,792 18,443 384 514 514 6--6
2-Upper Level 1,281 10,645 2,426 13,071 18,673 389 499 499 6--6
3-Lower Level 1,164 3,700 613 4,313 12,278 256 173 173 2--6
C:\ ...\8066 201ST LAKEVILLE.rhv Monday, August 27, 2018, 12:22 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 4
Total Building Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
499 13,892 0 10,251 10,251
11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2840 16,061 0 2,456 2,456
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
1116 4,758 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1281 2,229 0 1,230 1,230
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
724 1,575 0 0 0
Subtotals for structure:40,433 0 14,466 14,466
People:7 1,400 1,610 3,010
Equipment:2,500 8,000 10,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 97, Summer CFM: 50 8,961 970 696 1,666
Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692
AED Excursion:0 0 534 534
Total Building Load Totals:53,944 6,222 25,646 31,868
Check Figures
Total Building Supply CFM:1,186 CFM Per Square ft.:0.329
Square ft. of Room Area:3,609 Square ft. Per Ton:1,267
Volume (ft³) of Cond. Space:30,036
Building Loads
Total Heating Required Including Ventilation Air:53,944 Btuh 53.944 MBH
Total Sensible Gain:25,646 Btuh 80 %
Total Latent Gain:6,222 Btuh 20 %
Total Cooling Required Including Ventilation Air:31,868 Btuh 2.66 Tons (Based On Sensible + Latent)
2.85 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\8066 201ST LAKEVILLE.rhv Monday, August 27, 2018, 12:22 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 5
Building Pie Chart
Building
Loss
53,944
Btuh
Floor 3%Roof 4%
Wall 39%
Glass 26%
Door 4%
Infiltration 17%
Ventilation 8%
Building
Gain
31,868
Btuh
Roof 4%
Wall 8%
Glass 32%
Door 2%People 9%
Equipment 33%
Infiltration 5%
Ventilation 5%AED Excursion 2%
C:\ ...\8066 201ST LAKEVILLE.rhv Monday, August 27, 2018, 12:22 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 6
System 1 Whole House Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
499 13,892 0 10,251 10,251
11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2840 16,061 0 2,456 2,456
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
1116 4,758 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1281 2,229 0 1,230 1,230
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
724 1,575 0 0 0
Subtotals for structure:40,433 0 14,466 14,466
People:7 1,400 1,610 3,010
Equipment:2,500 8,000 10,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 97, Summer CFM: 50 8,961 970 696 1,666
Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692
AED Excursion:0 0 534 534
System 1 Whole House Load Totals:53,944 6,222 25,646 31,868
Check Figures
Supply CFM:1,186 CFM Per Square ft.:0.329
Square ft. of Room Area:3,609 Square ft. Per Ton:1,267
Volume (ft³) of Cond. Space:30,036
System Loads
Total Heating Required Including Ventilation Air:53,944 Btuh 53.944 MBH
Total Sensible Gain:25,646 Btuh 80 %
Total Latent Gain:6,222 Btuh 20 %
Total Cooling Required Including Ventilation Air:31,868 Btuh 2.66 Tons (Based On Sensible + Latent)
2.85 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\8066 201ST LAKEVILLE.rhv Monday, August 27, 2018, 12:22 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 7
Detailed Room Loads - Room 1 - Main Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,164.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,164.0 sq.ft.Supply Air:514 CFM
Ceiling Height:9.0 ft.Supply Air Changes:2.9 AC/hr
Volume:10,476.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:6 Actual Winter Vent.:52 CFM
Runout Air:86 CFM Percent of Supply.:10 %
Runout Duct Size:6 in.Actual Summer Vent.:30 CFM
Runout Air Velocity:436 ft./min.Percent of Supply:6 %
Runout Air Velocity:436 ft./min.Actual Winter Infil.:43 CFM
Actual Loss:0.119 in.wg./100 ft.Actual Summer Infil.:22 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
W -Wall-12F-0sw 40 X 9 355 0.065 5.7 2,008 0.9 0 307
E -Wall-12F-0sw 40 X 9 304 0.065 5.7 1,719 0.9 0 263
N -Wall-12F-0sw 44 X 9 290 0.065 5.7 1,640 0.9 0 251
S -Wall-12F-0sw 44 X 9 304 0.065 5.7 1,719 0.9 0 263
N -Door-11N 6 X 7 42 0.350 30.5 1,279 8.4 0 353
N -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176
W -Gls-4A-1a-o shgc-0.33 0%S 5 0.320 27.8 139 35.0 0 175
E -Gls-4A-1a-o shgc-0.33 0%S 56 0.320 27.8 1,559 35.0 0 1,960
N -Gls-4A-1a-o shgc-0.33 100%S 43 0.320 27.8 1,197 10.4 0 448
S -Gls-4A-1a-o shgc-0.33 0%S 92 0.320 27.8 2,561 19.2 0 1,765
Subtotals for Structure:14,460 0 5,961
Infil.: Win.: 42.9, Sum.: 22.3 1,512 2.634 3,983 0.204 431 309
AED Excursion:231
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:1,000 4,000
Room Totals:18,443 1,831 10,961
C:\ ...\8066 201ST LAKEVILLE.rhv Monday, August 27, 2018, 12:22 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 8
Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,281.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,281.0 sq.ft.Supply Air:499 CFM
Ceiling Height:8.0 ft.Supply Air Changes:2.9 AC/hr
Volume:10,248.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:6 Actual Winter Vent.:53 CFM
Runout Air:83 CFM Percent of Supply.:11 %
Runout Duct Size:6 in.Actual Summer Vent.:29 CFM
Runout Air Velocity:423 ft./min.Percent of Supply:6 %
Runout Air Velocity:423 ft./min.Actual Winter Infil.:42 CFM
Actual Loss:0.112 in.wg./100 ft.Actual Summer Infil.:22 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
W -Wall-12F-0sw 43 X 9 354 0.065 5.7 2,002 0.9 0 306
E -Wall-12F-0sw 43 X 9 381 0.065 5.7 2,155 0.9 0 329
N -Wall-12F-0sw 40 X 9 300 0.065 5.7 1,696 0.9 0 259
S -Wall-12F-0sw 40 X 9 276 0.065 5.7 1,561 0.9 0 239
W -Gls-4A-1a-o shgc-0.33 0%S 33 0.320 27.8 919 35.0 0 1,155
E -Gls-4A-1a-o shgc-0.33 0%S 6 0.320 27.8 167 35.0 0 210
N -Gls-4A-1a-o shgc-0.33 100%S 60 0.320 27.8 1,670 10.4 0 625
S -Gls-4A-1a-o shgc-0.33 0%S 84 0.320 27.8 2,339 19.2 0 1,611
UP-Ceil-16B-50 1281 X 1 1281 0.020 1.7 2,229 1.0 0 1,230
Subtotals for Structure:14,738 0 5,964
Infil.: Win.: 42.4, Sum.: 22.0 1,494 2.634 3,935 0.205 426 306
AED Excursion:225
People: 200 lat/per, 230 sen/per:5 1,000 1,150
Equipment:1,000 3,000
Room Totals:18,673 2,426 10,645
C:\ ...\8066 201ST LAKEVILLE.rhv Monday, August 27, 2018, 12:22 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 9
Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,164.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,164.0 sq.ft.Supply Air:173 CFM
Ceiling Height:8.0 ft.Supply Air Changes:1.1 AC/hr
Volume:9,312.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:2 Actual Winter Vent.:35 CFM
Runout Air:87 CFM Percent of Supply.:20 %
Runout Duct Size:6 in.Actual Summer Vent.:10 CFM
Runout Air Velocity:441 ft./min.Percent of Supply:6 %
Runout Air Velocity:441 ft./min.Actual Winter Infil.:11 CFM
Actual Loss:0.122 in.wg./100 ft.Actual Summer Infil.:6 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
N -Wall-15B0-10sf-10 44 X 9 396 0.049 4.3 1,688 0.0 0 0
S -Wall-12F-0sw 44 X 9 276 0.065 5.7 1,561 0.9 0 239
E -Wall-15B0-10sf-10 40 X 9 360 0.049 4.3 1,535 0.0 0 0
W -Wall-15B0-10sf-10 40 X 9 360 0.049 4.3 1,535 0.0 0 0
S -Gls-4A-1a-o shgc-0.33 0%S 120 0.320 27.8 3,341 19.2 0 2,302
Floor-21A-24 1 X 724 724 0.025 2.2 1,575 0.0 0 0
Subtotals for Structure:11,235 0 2,541
Infil.: Win.: 11.2, Sum.: 5.8 396 2.634 1,043 0.205 113 81
AED Excursion:78
Equipment:500 1,000
Room Totals:12,278 613 3,700
C:\ ...\8066 201ST LAKEVILLE.rhv Monday, August 27, 2018, 12:22 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 10
System 1 Room Load Summary
No
Room
Name
Area
SF
Htg
Sens
Btuh
Min
Htg
CFM
Run
Duct
Size
Run
Duct
Vel
Clg
Sens
Btuh
Clg
Lat
Btuh
Min
Clg
CFM
Act
Sys
CFM
---Zone 1---
1 Main Level 1,164 18,443 384 6-6 436 10,961 1,831 514 514
2 Upper Level 1,281 18,673 389 6-6 423 10,645 2,426 499 499
3 Lower Level 1,164 12,278 256 2-6 441 3,700 613 173 173
Ventilation 4,550 340 1,352
System 1 total 3,609 53,944 1,028 25,646 6,222 1,186 1,186
System 1 Main Trunk Size:21x10 in.
Velocity:813 ft./min
Loss per 100 ft.:0.097 in.wg
Cooling System Summary
Cooling
Tons
Sensible/Latent
Split
Sensible
Btuh
Latent
Btuh
Total
Btuh
Net Required:2.66 80% / 20%25,646 6,222 31,868
Recommended:2.85 75% / 25%25,646 8,549 34,195
Actual:1.00 77% / 23%9,240 2,760 12,000
Equipment Data
Heating System Cooling System
Type:Natural Gas Furnace Standard Air Conditioner
Model:QC-F38-E78-G QC-C12
Indoor Model:S12
Brand:Quikcool FE Series Quikcool AS Series
Description:Hi Efficiency Furnace Standard Efficiency Air Condit
Efficiency:78.3 AFUE 12.4 SEER
Sound:8.1 bels
Capacity:38,000 Btuh 12,000 Btuh
Sensible Capacity:n/a 9,240 Btuh
Latent Capacity:n/a 2,760 Btuh
C:\ ...\8066 201ST LAKEVILLE.rhv Monday, August 27, 2018, 12:22 PM
Builders Associaton of Minnesota version 101014
Date Certificate Posted
x Passive (No Fan)
Active (With fan and monometer or
other system monitoring device)
Location (or future location) of Fan:
Other Please Describe Here
x
10/15 x x
x
20 x
20 x
21 x
49 x
x
x
x
x Not applicable, all ducts located in conditioned space
x Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:
Input in
BTUS:
70,000 Capacity in
Gallons:
Other, describe:
AFUE or
HSPF%
93%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
x Passive
Low: Other, describe:
x Low:
Location of fan(s), describe: Cfm's
4" " round duct OR Flex
" metal duct
City Mailing Address of the Dwelling or Dwelling Unit
Combustion Air Select a Type
Location of duct or system:
31,868
Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.
Place your
logo here
New Construction Energy Code Compliance Certificate
Name of Residential Contractor
Stone Cottage Construction Inc.
MN License Number
Lakeville8066 201st St
BC636874
Mech Room
Heat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
53,944
Heating Gain Cooling Load
Attic
Fuel Type
Solar Heat Gain Coefficient (SHGC):
Windows & Doors
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
Rim Joist (2nd Floor+)
0.30
Appliances
THERMAL ENVELOPE
Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade
RADON CONTROL SYSTEM
Non or Not Applicable Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply
Mineral Fiberboard Insulation Location
Foam, Closed Cell0.22
Describe other insulated areas Fiberglass, BlownFiberglass, Batts Foundation Wall
R-value
Average U-Factor (excludes skylights and one door) U:
Duct system air tightness: Building envelope air tightness:
Rim Joist (1st Floor)
GPVL-50 13ACXN042-230 Model
Heating System
Natrual Gas
Lennox
Location of duct or system:
Heating or Cooling Ducts Outside Conditioned Spaces
Electric
Make-up Air Select a Type
AO Smith
Domestic Water
Heater
MECHANICAL SYSTEMS
Rating or Size
Efficiency 13 Seer
200CFM
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
25,646Residential Load Calculation
SEER
/EER
Total ventilation (intermittent + continuous) rate in cfms:
Balanced Ventilation capacity in cfms:
High:
High:
MECHANICAL VENTILATION SYSTEM
Capacity continuous ventilation rate in cfms:
ML193UH070
Heating Loss
Manufacturer Lennox
Natural Gas
Output in
Tons:
3 Ton50
NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION
This form must be completed and submitted with all new residential permit applications.
New residential building permits WILL NOT be issued without this completed form.
Project Site Address: _____________________________________________________________________
Company Name: _________________________________________________________________________
Primary Contact: _________________________________________________________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Description of Land Disturbing Activity: _____________________________________________________
NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___
If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an
erosion and sediment control plan MUST be submitted with the residential building permit application.
“The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities
in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater
Permit.” (NPDES Construction Stormwater Permit, MPCA)
“The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least
once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.”
(NPDES Construction Stormwater Permit, MPCA)
Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control
inspections and corrective actions:
Name of Person: ________________________________Company: _______________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Entity that Provided Training: ________________________ Certification Expiration Date: ____________
NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots.
No land disturbing activity may begin until a residential building permit has been issued.
I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National
Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER;
withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater
Permit (MN R 100001) or erosion and sediment control plan.
Signature: ________________________________________________ Date:_________________________
Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500
8066 201st St W
Stone Cottage Construction, Inc.
Brian Christopherson
651.755.7199 brian@stonecottage.com
New Single Family Home
5 0 5 9 4
Brian Christopherson Stone Cottage Construction, Inc.
651.755.7199 brian@stonecottage.com
University of Minnesota 05.31.2021
Troy Asleson - President - Stone Cottage Construction, Inc.09.13.2018
09/20/18 X
KP