Loading...
HomeMy WebLinkAboutLot 3, Block 4, Berres Ridge 3rd Addition - CERT 083018ENGINEERING REVIEWED Date:__________________10/02/2018 corlowsky *Draintile connection required. The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements.