HomeMy WebLinkAbout8320 197th Street West-SURVEY*Maintain 6" between bottom of siding and sod.*No structures in easements.
*Draintile connection required.
The curb box, drain tile cleanout, and catch
basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
ENGINEERING REVIEWED
Date:__________________10/04/2018 corlowsky
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION