Loading...
HomeMy WebLinkAbout8459 197th Street West-SURVEY (1)ENGINEERING REVIEWED Date:__________________10/04/2018 corlowsky *Draintile connection required.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION