THE EDISON AT SPIRIT PRELIMINARY AND FINAL PLAT
Proposed Action
Staff recommends adoption of the following motion: Move to approve: 1) a resolution approving The
Edison at Spirit preliminary and final plat, 2) a resolution vacating public drainage and utility easements,
and 3) a resolution designating “No Parking” areas.
Overview
KJPL Lakeville, LLC representatives are requesting approval of The Edison at Spirit preliminary and final
plat and PUD development stage plans for the construction of 160 multiple family dwelling units in the
Spirit of Brandtjen Farm (SBF) planned unit development (PUD). The project is located south of 160th
Street (CSAH 46) and east of Elmhurst Lane. The Edison at Spirit development includes the
construction of a 150-unit, three-story market rate apartment building with underground parking and
five, two-unit carriage house buildings. The Edison at Spirit development complies with the SBF PUD
approved in 2005 and the RH-1 District standards of the Zoning Ordinance. In conjunction with the
preliminary and final plat, underlying drainage and utility easements will be vacated (re-established with
the final plat) and “No Parking” will be designated on the south side of 161st Street.
The Planning Commission held a public hearing on The Edison at Spirit preliminary and final plat and
development stage PUD and easement vacation at their August 16, 2018 meeting. There was public
comment from four Apple Valley residents, concerned mainly about traffic on CSAH 46, and one SBF
resident. The Planning Commission unanimously recommended approval. The Parks, Recreation and
Natural Resources Committee unanimously recommended approval of The Edison at Spirit preliminary
and final plat at their August 15, 2018 meeting.
Primary Issues to Consider
• Why is a parking deferment needed?
Supporting Information
• Staff response to Primary Issues to Consider
• Preliminary and final plat, easement vacation, and “No Parking” resolutions
• Signed development contract
• August 16, 2018 Planning Commission meeting minutes
• August 15, 2018 Parks, Recreation and Natural Resources Committee meeting minutes
• August 9, 2018 planning report and August 9 and September 19, 2018 engineering reports
Financial Impact: $ Budgeted: Y☐ N☐ Source:
Related Documents: (CIP, ERP, etc.):
Envision Lakeville Community Values: A Home for All Ages and Stages of Life
Report Completed by: Daryl Morey, Planning Director
October 15, 2018
Zoning and Subdivision Ordinances, SBF PUD
Primary Issues to Consider
• Why is a parking deferment needed?
The developer proposes to meet the 2.0 parking spaces/unit standard that was allowed with their
Avonlea apartment project by incorporating 27 tandem spaces in the underground parking garage and
proof of parking spaces, which requires administrative approval of a parking deferment. The 27
underground garage tandem parking spaces will function properly provided the apartment
management leases each set of tandem spaces to the same apartment unit. While the Planning
Commission was comfortable with this design, they agreed with the staff recommendation that proof of
parking spaces be shown on the site plan as a backup measure. The attached site plan shows 35 parallel
proof of parking spaces, six of which are located along the north side of 161st Street.
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. __________
RESOLUTION APPROVING THE PRELIMINARY AND FINAL PLAT OF
THE EDISON AT SPIRIT
WHEREAS, the owner of the plat described as The Edison at Spirit has
requested preliminary and final plat approval; and
WHEREAS, the preliminary and final plat were reviewed by the Planning
Commission and the Parks, Recreation and Natural Resources Committee; and
WHEREAS, the preliminary and final plat and development stage PUD plans
meet Subdivision Ordinance requirements and are consistent with the Spirit of
Brandtjen Farm Master Planned Unit Development Stage Plan Agreement dated
October 17, 2005; and
WHEREAS, the preliminary and final plat is acceptable to the City.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The preliminary and final plat of The Edison at Spirit is hereby approved
subject to the development contract and security requirements.
2. The Mayor and City Clerk are hereby directed to sign the final plat mylars and
development contract.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
ADOPTED by the Lakeville City Council this 15th day of October 2018
CITY OF LAKEVILLE
BY: _______________________
Douglas P. Anderson, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 15th day of October 2018, as shown by the
minutes of said meeting in my possession.
________________________
Charlene Friedges, City Clerk
(SEAL)
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO._________
RESOLUTION VACATING PUBLIC DRAINAGE AND UTILITY EASEMENTS
WHEREAS, the Planning Commission has conducted a public hearing, preceded by
two (2) weeks published notice, to consider the following described public drainage and
utility easement vacation, and
WHEREAS, the City Council has determined that it is in the public interest to approve
the public drainage and utility easement vacation.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The following public drainage and utility easements are hereby vacated:
(see attached Exhibit A)
2. The City Clerk is directed to file a certified copy of this resolution with the Dakota
County Recorder.
ADOPTED by the Lakeville City Council this 15th day of October 2018
CITY OF LAKEVILLE
________________________
Douglas P. Anderson, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of the
resolution presented to and adopted by the City Council of the City of Lakeville at a duly
authorized meeting thereof held on the 15th day of October 2018, as shown by the minutes of
said meeting in my possession.
___________________________
Charlene Friedges, City Clerk
(SEAL)
EXHIBIT A
Description of Drainage and Utility Easements to be Vacated
The drainage and utility easements as dedicated on Outlot L, SPIRIT OF BRANDTJEN
FARM COMMERCIAL 2ND ADDITION, according to the recorded plat thereof, Dakota
County, Minnesota.
Phone (952) 937-5150 12701 Whitewater Drive, Suite #300
Fax (952) 937-5822 Minnetonka, MN 55343
Toll Free (888) 937-5150
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO:
RESOLUTION DESIGNATING “NO PARKING” AREAS ON 161ST STREET
WHEREAS, the City Council for the City of Lakeville is authorized in accordance
with City Code to designate parking zones within the city, and
WHEREAS, 161st Street will be constructed in conjunction with The Edison at
Spirit development as a 32-foot-wide local street; and
WHEREAS, establishing “No Parking” areas on 161st Street will discourage
potential on-street parking by residents of The Edison at Spirit apartment complex,
maintain sufficient access to the traffic lanes, provide increased sight lines for drivers,
and reduce the interaction between vehicles and pedestrians.
NOW, THEREFORE, BE IT RESOLVED, that the south side of 161st Street shall
be designated “No Parking” anytime.
ADOPTED by the Lakeville City Council this 15th day of October 2018
CITY OF LAKEVILLE
By: ________________________________
Douglas P. Anderson, Mayor
ATTEST:
__________________________________
Charlene Friedges, City Clerk
3601 Thurston Avenue
Anoka, MN 55303
763.231.5840
TPC@PlanningCo.com
1
PLANNING REPORT
TO: Daryl Morey
FROM: D. Daniel Licht, AICP
DATE: 9 August 2018
RE: Lakeville – SBF; The Edison @ Spirit
TPC FILE: 135.01
BACKGROUND
JPL Development LLC has submitted plans for the development of 160 dwelling units within a
multiple family building and five secondary carriage house buildings on a lot to be subdivided
from Outlot L, Spirit of Brandtjen Farm Commercial 2nd Addition. The 5.269 acre subject site is
located at the southeast corner of 160th Street (CSAH 46) and Elmhurst Lane. The subject site is
zoned PUD, Planned Unit Development District as approved by the City Council on 20 June
2005. The proposed development requires consideration of applications for a PUD
Development Stage Plan, Preliminary Plat, and Final Plat.
Exhibits:
A. Location Map
B. SBF Land Use Pan
C. Vacation Sketch
D. Preliminary Plat
E. Final Plat
F. Site Plan
G. Grading & Erosion Control Plan
H. Utility Plan
I. Landscape Plan (3 pages)
J. Lighting Plan
K. Building Floor Plans (6 pages)
L. Building Elevation Plans (4 pages)
M. Dakota County Plat Commission Letter
2
ANALYSIS
SBF Land Use Plan. The SBF Land Use Plan guides the subject site for mixed use development
based on the uses allowed in the O-R District and C-3 District. Multiple family uses are an
allowed use within this area of the SBF PUD District.
Surrounding Land Uses. The subject site is surrounded by the existing and planned land uses
described in the table below. The proposed development will be compatible with surrounding
land uses and will provide appropriate density for development adjacent to CSAH 46 within the
planned mixed use area of SBF.
Direction Land Use Plan Zoning Map Existing Use
North NA NA 160th Street
East Mixed Use SBF PUD District Undeveloped
South High Density SBF PUD District Detached townhouse lots
Single family lots
West Mixed Use SBF PUD District Commercial
Taco Bell
PetSmart
Building Plans. The developer has submitted detailed elevation and floor plans for the
proposed multiple family building and carriage houses. The proposed buildings are subject to
the performance standards for multiple family buildings established by Section 17 of the Zoning
Ordinance and for uses within the RH-1 District:
Floor Area Per Dwelling Unit. Section 11-17-13.B of the Zoning Ordinance establishes
minimum floor area requirements for multiple family dwelling units. The floor plans
submitted by the developer indicate that the average number of bedrooms per dwelling
unit for the proposed development is 1.54. The information on the floor plan sheets as
to the floor area for each of the apartment floor plans within the proposed buildings
comply with the requirements of the Zoning Ordinance.
Unit Number
Of Units
% of
Total
Min. Area
Required
Proposed
Area
1 Bedroom 71 44% 700sf. 752-872sf.
2 Bedroom 72 45% 800sf. 1,010-1,133sf.
3 Bedroom 7 4% 880sf. 1,337sf.
Carriage (1 BR) 10 7% 700sf. 863sf.
Building Materials. The submitted plans include exterior elevations for the proposed
multiple family building and carriage house buildings, which have an exterior finish
consisting of brick veneer, stone trim, and forms of fiber cement lap siding. The building
plans must be revised to identify the percentage of each material used for all of the
exterior elevations and a cumulative total use of brick and stone greater than 60 percent
3
of the wall area for each building to comply with Section 11-61-19.B of the Zoning
Ordinance.
Building Height. The proposed multiple family building is four stories with a flat roof
measuring 48 feet in height. The proposed carriage house buildings are two stories with
dwelling units over garage stalls having a height of 24 feet as defined by the Zoning
Ordinance to the midpoint of the pitched roofs. The maximum height allowed for
multiple family uses within the SBF PUD District is 55 feet. The proposed height of the
buildings complies with the height allowances for this area of SBF and the flat roof
design of the principal building is appropriate for the mixed use area of SBF.
Lot Requirements. The SBF PUD District does not establish minimum lot area or lot width
requirements for high density residential uses, including those within the mixed land use
district. The SBF Master Land Plan describes high density residential uses as being 12 or more
dwelling units per acre. Section 3 of the SBF PUD Booklet also outlines a key flexibility of the
PUD District as being the transfer of unused development rights within the SBF. The proposed
160 dwelling units to be developed within the 5.269 acre subject site equals a density of 30
dwelling units per acre or 1,435 square feet of lot area per dwelling unit. The proposed density
is appropriate within the context of its location within the mixed land use district of SBF and the
total of 2,109 dwelling units approved to be developed within SBF.
Setbacks. The table below summarizes setbacks applicable to the subject site based on the
requirements established by Section 7 of the SBF PUD Booklet for multiple family development
within the mixed land use district. The site design and setbacks from property lines for the
apartment building and off-street parking areas are consistent with the requirements of the SBF
PUD Booklet and appropriate for the subject site, except for the spacing between the carriage
house buildings.
West South East North Between
Bldgs.
Off-Street
Parking
ROW North
Required 10ft. 10ft 10ft. 30ft. 25ft. 15ft. 5ft.
Proposed 70ft. 74ft. 33ft. 60ft. 15ft. 16ft. 16ft.
The proposed carriage house buildings are setback 15 feet apart between buildings whereas 25
feet is required within the mixed use area of SBF. However, only 20 feet is required between
medium density townhouse type buildings in other areas of SBF. The carriage houses are a
unique secondary use within the development and flexibility from the 25 foot setback
requirement between buildings is appropriate.
Access. The subject site abuts Elmhurst Lane along the west plat line. The preliminary plat
provides for dedication of right-of-way for 161st Street extending east of Elmhurst Lane at the
SBFC private drive along the south line of Lot 1, Block 1 to the east plat line. The proposed
street section is 32 feet wide based on standard City design plates, which widens to 36 feet at
4
Elmhurst Lane to allow for left and right lanes for west bound traffic on 161st Street. Sidewalk is
shown on both sides of 161st Street as required for all streets within SBF.
Lot 1, Block 1 has two proposed accesses to 161st Street. The westerly driveway is setback 140
feet from Elmhurst Lane with the east driveway setback 60 feet from the east lot line and 320
feet between driveways. The proposed access locations comply with Section 11-19-7.I.6 of the
Zoning Ordinance. The developer will need to provide for an easement and construction of
temporary cul-de-sac at the east terminus of 161st Street. All street sections and construction
plans are subject to review and approval of the City Engineer.
Off-Street Parking. Section 11-19-13 of the Zoning Ordinance requires multiple family uses to
provide 2.5 off-street parking stalls per dwelling unit. The City has indicated that a parking
requirement of 2.0 off-street parking stalls per dwelling unit would be allowed for multiple
family dwelling units meeting certain criteria, such as proximity to transit facilities or transit
corridors and maintaining a ratio of not more than 2.0 bedrooms per dwelling unit. The
proposed development meets these criteria.
The submitted site and building plans provide for 312 off-street parking stalls divided between
82 surface parking stalls, 200 underground parking stalls for the apartment building (of which
27 are in a tandem arrangement), and 30 garage stalls for the carriage house dwelling units.
The number of required parking stalls based on a 2.0 stall per dwelling unit ratio is 320 stalls.
The total of 285 surface and garage stalls for the proposed use (not including the apartment
garage tandem stalls) is 35 stalls less than required.
The developer has indicated that they will provide information from other existing apartment
developments regarding the use of the proposed tandem parking stalls to meet off-street
parking demand. The functionality of the proposed tandem stalls is based in part upon the
management parking stall assignment that can be controlled within an apartment complex.
The Planning Commission may consider allowing flexibility to allow use of the tandem parking
stalls for this development if it is demonstrated that their use is consistent with the intent of
the Zoning Ordinance.
The site plan provides for 29 parallel proof-of-parking stalls. Section 11-19-11.J of the Zoning
Ordinance makes allowance for deferment of required parking stalls for multiple family uses
provided that the developer demonstrates that the use will have peak off-street parking
demand less than that required by the Zoning Ordinance. Approval of the deferment requires
that the site has sufficient property under the same ownership to accommodate the expansion
of the parking facilities to meet the minimum requirements of the Zoning Ordinance if the
parking demand exceeds on site supply. The developer must also enter into a development
agreement, to be recorded against the subject property, that includes a clause requiring the
owner to install the additional parking stalls upon a finding of the Zoning Administrator that the
additional parking stalls are necessary to accommodate the use.
5
The proposed 29 proof-of-parking stalls would reduce the deficit in the number of off-street
parking stalls required by the Zoning Ordinance to six stalls, if the tandem garage parking
spaces are not considered. The site plan must be revised to identify six additional proof-of-
parking stalls that would be needed to meet the requirements of the Zoning Ordinance if the
peak demand for off-street parking exceeds that constructed with the tandem parking
arrangement. To preserve areas within the subject site for greenspace and landscaping, City
staff would suggest the additional six proof-of-parking added shown as bump-out parking stalls
along the north side of 161st Street.
The surface parking stalls are designed as nine feet wide and 20 feet deep accessed by drive
aisles at least 24 feet wide in compliance with Section 11-19-7.I.1 of the Zoning Ordinance. The
surface parking stalls and drive aisles shown on the site plan are to be surfaced with asphalt
and surrounded by perimeter concrete curb as required by Sections 11-19-7.I.12 and 15 of the
Zoning Ordinance.
The underground parking includes 167 stalls (plus 27 tandem stalls) designed as 9 feet wide and
18 feet deep with 24 foot wide drive aisles as allowed by Section 11-19-7.I.3.b of the Zoning
Ordinance. There are to be six parking stalls within the apartment garage are designated as
compact stalls that are eight feet wide by 16 feet deep. Section 11-19-7.I.19 of the Zoning
Ordinance makes provision for up to 20 percent of the required number of parking stalls to be
designated for compact vehicles with dimensions of eight feet wide by 16 feet deep accessed
by 24 foot wide drive aisles. The number of proposed compact car stalls is less than two
percent of the total number of required parking stalls and three percent of the underground
parking stalls.
The 30 garage stalls within the five carriage house buildings are single stall units with nine foot
wide garage doors that are 20 feet deep.
Pedestrian Access. There are six foot wide concrete sidewalks at the front of the parking stalls
on the south and east sides of the multiple family building and a five foot wide concrete
sidewalk between the building and outdoor swimming pool/kitchen area. There is a sidewalk
connection to the public sidewalk on the east side of Elmhurst Trail to the internal sidewalk on
the south side of the multiple family building. A pedestrian connection is also to be provided at
the south building entrance to the sidewalk along the north side of 161st Street.
Landscaping. The developer has submitted a landscape plan that provides for significant
numbers and an excellent variety of trees, shrubs, and perennials at the perimeter of the site,
in each yard, and at the foundation on each side of the multiple family building. Although a
buffer yard is not required for the multiple family use within the mixed land use district of SBF,
the landscape plan provides for dense evergreen tree plantings in the yard abutting CSAH 46.
The types and sizes of proposed plantings are appropriate for the subject site and comply with
the requirements of Section 11-21-9.C of the Zoning Ordinance.
6
Swimming Pool. There is an outdoor swimming pool and outdoor kitchen on the west side of
the proposed multiple family building. The site plan identifies that a fence encloses the pool
area. Details regarding construction of the fence are required to be submitted. The design of
the fence must comply with the design standards established by Section 11-21-5.G of the
Zoning Ordinance.
Exterior Lighting. A photometric lighting plan identifying the type, location, height, and
intensity of all proposed exterior light fixtures has been submitted. All of the proposed
exterior lighting complies with Section 11-16-17 of the Zoning Ordinance, which requires all
exterior fixtures to have a 90 degree horizontal cutoff and be mounted not higher than 35 feet.
Signs. Sign allowances for the subject site are to be as provided for in the O-R District in Section
11-23-19.C of the Zoning Ordinance. The site plan identifies an entry monument at the
northwest corner of the subject site facing the CSAH 46 and Elmhurst Lane intersection. The
sign is setback the 20 feet from both public rights-of-way as required by Section 11-23-21 of the
Zoning Ordinance. Details regarding the area and height of the proposed sign must be
submitted at the time a sign permit is applied for. There are no wall signs shown on the
submitted architectural plans.
Trash. No exterior trash storage is shown on the site plan with a trash storage room shown on
the garage floor plan of the multiple family building. It is assumed that the carriage houses will
provide for storage of waste and recycling containers within the tuck under attached garages
for each dwelling unit.
Homeowners Association. The proposed development is not to be included as part of the SBF
Master Homeowners Association. No access to private SBF HOA facilities will be available to
residents of the proposed multiple family development. The subject site does include an 8,441
square foot clubhouse and outdoor swimming pool/kitchen on the west side of the proposed
multiple family building for resident use.
Park Dedication. Requirements for park dedication the subject site within SBF was established
in the SBF Master development agreement. No land is to be dedicated to the City from the
subject site. As such, park dedication requirements are to be satisfied as a cash fee in lieu of
land calculated as follows:
160 dwelling units x $1,930.00/du = $308,800.00
Grading Plan. The developer has submitted a grading plan for the proposed development of
the subject site. All grading, drainage, and erosion control issues are subject to review and
approval of the City Engineer.
Utility Plan. The subject site is within the MUSA and utilities are available to provide sewer and
water service. The submitted plans include a utility plan for connection of the proposed
7
development to sanitary sewer and water. All utility issues are subject to review and approval
of the City Engineer.
Easements. The final plat provides for dedication of 10 foot wide drainage and utility
easements at the perimeter of the subject site as required by Section 10-4-4 of the Subdivision
Ordinance. The drainage and utility easement along the east line of Lot 1, Block 1 is only five
feet wide in anticipation of development of the outlot to the east. The final plat also proposes
permanent boundary drainage and utility easements within Outlot A. These easements should
be removed and replaced by temporary easements that expire when Outlot A is final platted
into lots. Existing drainage and utility easements dedicated with SBF Commercial 2nd Addition
are to be vacated upon recording of a final plat as they no longer serve a public purpose in lieu
of the easements dedicated with the final plat. All drainage and utility easements are subject
to review and approval of the City Engineer.
Outlot A. Outlot A is the remainder of the subject site less the area of Lot 1, Block 1 and right-
of-way for 161st Street. Outlot A will be retained by the SBF Development Corporation for a
future phase of development.
Development Agreement. The developer is required to enter into a development agreement
with the City in accordance with Section 10-5-1.A of the Subdivision Ordinance for the public
and private improvements, payment of applicable fees, and posting of required securities. The
development agreement will be drafted by the City Attorney and the developer is required to
execute the development agreement prior to City Council approval of the final plat.
CONCLUSION
Development of a multiple family use within Spirit of Brandtjen Farm is consistent with the land
uses and key flexibilities for SBF established with the PUD District. The location of the proposed
multiple family development within the mixed use district of SBF provides for variation in
housing choice within SBF (and the City overall) and will provide in-place market support for
existing and planned businesses in the area. City staff considers the proposed development to
be very positive and complimentary to the uses already developed within SBF. We recommend
approval of the PUD Development Stage Plan, Preliminary Plat, Final Plat, and vacation of
drainage and utility easements subject to the following conditions:
1. The submitted building elevation plans shall be revised to identify the percentage of
each material used for each of the exterior elevations and a cumulative total in
compliance with Section 11-61-19.B of the Zoning Ordinance.
2. The site plan shall be revised to identify six additional proof-of-parking stalls within the
subject site or as parallel stalls along the north side of 161st Street.
8
3. The fence enclosing the outdoor swimming pool shall comply with the specifications of
Section 11-21-5.G of the Zoning Ordinance.
4. All signs shall be subject to compliance with the provisions of Section 11-23-19.C of the
Zoning Ordinance and shall require issuance of a sign permit prior to display upon the
property.
5. Park dedication requirements shall be satisfied at the time of final plat approval by
payment of a cash fee in lieu of land of $308,800.00 based on the formula established
by the SBF Master PUD Development Agreement.
6. All grading, drainage, and erosion control issues are subject to review and approval of
the City Engineer.
7. All utility issues shall be subject to review and approval of the City Engineer.
8. The existing drainage and utility easements within the subject site shall be vacated
concurrent with approval and recording of the final plat.
9. All easements shall be subject to review and approval of the City Engineer.
10. The developer shall execute a development agreement with the City prior to City
Council approval of the final plat, which shall include a clause related to deferment of
required off-street parking stall construction.
c. Justin Miller, City Administrator
Alex Jordan, Assistant City Engineer
John Hennen, Parks and Recreation Director
Andrea McDowell-Poehler, City Attorney
Dakota County GIS
±
Site
Lo cation
162ND ST
160 TH ST (CS AH 46)ELMHURSTLNEAGLEVIEWDRIVEEQUESTRIANTRL ELKHORN T R L
CIT Y OF APP LE VA LLEY
City of LakevilleLocation MapEdison at Spiritof Brandtjen Farm
Dakota County Surveyor’s Office
Western Service Center 14955 Galaxie Avenue Apple Valley, MN 55124
952.891 -7087 Fax 952.891 -7127 www.co.dakota.mn.us
June 11, 2018
City of Lakeville
20195 Holyoke Ave.
Lakeville, MN 55044
Re: EDISON OF SPIRIT OF BRANDTJEN FARM
The Dakota County Plat Commission met on June 11, 2018, to consider the preliminary plat of the above
referenced plat. The plat is adjacent to CSAH 46 (160th St.), and is therefore subject to the Dakota County
Contiguous Plat Ordinance.
The proposed plat is a replat of Outlot L, SPIRIT OF BRANDTJEN FARM COMMERCIAL 2ND ADDITION. There is
no direct access along CSAH 46 to this site. Restricted access should be shown per the underlying plat. The
right-of-way needs and restricted access along CSAH 46 have been met.
The Plat Commission has approved the preliminary plat and reviewed the final plat and recommends
approval to the County Board of Commissioners.
Traffic volumes on CSAH 46 are 24,700 ADT and are anticipated to be 35,000 ADT by the year 2030. These
traffic volumes indicate that current Minnesota noise standards for residential units could be exceeded for
the proposed plat. Residential developments along County highways commonly result in noise complaints.
In order for noise levels from the highway to meet acceptable levels for adjacent residential units, substantial
building setbacks, buffer areas, and other noise mitigation elements should be incorporated into this
development.
No work shall commence in the County right of way until a permit is obtained from the County
Transportation Department and no permit will be issued until the plat has been filed with the County
Recorder’s Office. The Plat Commission does not review or approve the actual engineering design of
proposed accesses or other improvements to be made in the right of way. Nothing herein is intended to
restrict or limit Dakota County’s rights with regards to Dakota County rights of way or property. The Plat
Commission highly recommends early contact with the Transportation Department to discuss the permitting
process which reviews the design and may require construction of highway improvements, including, but not
limited to, turn lanes, drainage features, limitations on intersecting street widths, medians, etc. Please
contact Gordon McConnell regarding permitting questions at (952) 891-7115 or Todd Tollefson regarding Plat
Commission or Plat Ordinance questions at (952) 891-7070.
Sincerely,
Todd B. Tollefson
Secretary, Plat Commission
c: Patrick Wrase (Tradition Development)
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Daryl Morey, Planning Director
From: Joe Powers, Project Engineer
McKenzie L. Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Alex Jordan, Assistant City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Dave Olson, Community and Economic Development Director
Date: August 9, 2018
Subject: The Edison at Spirit
• Preliminary Plat Review
• Grading and Erosion Control Plan Review
• Utility Plan Review
• Site Plan Review
• Easement Vacation
BBAACCKKGGRROOUUNNDD
JPL Development LLC has submitted a preliminary and final plat named The Edison at Spirit
and plans for the development of 160 dwelling units within a multiple family building and
five secondary carriage house buildings. The parent parcel is a portion of Outlot L, Spirit of
Brandtjen Farm Commercial 2nd Addition. The subject site is located at the southeast corner
of 160th Street (CSAH 46) and Elmhurst Lane. The subject site is zoned PUD, Planned Unit
Development District.
The preliminary and final plats consist of one lot within one block and one Outlot on 12.09
acres.
TTHHEE EEDDIISSOONN AATT SSPPIIRRIITT–– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAUUGGUUSSTT 77,, 22001188
PPAAGGEE 22 OOFF 77
The outlot created with the preliminary and final plat shall have the following use:
Outlot A: Retained by SBF Development Corporation for a future phase of
development (5.96 acres).
The proposed development and site plan will be completed by:
Developer: JPL Development
Engineer/Surveyor: Westwood Professional Services, Inc.
SSIITTEE CCOONNDDIITTIIOONNSS
The Edison at Spirit site consists of undeveloped land. The property is generally flat, sloping to
low points at the north and southwest boundaries of the site.
EEAASSEEMMEENNTTSS
The parent parcel contains existing public Drainage and Utility Easements dedicated with the
Spirit of Brandtjen Farm Commercial 2nd Addition plat, which will be vacated with the final
plat. The Drainage and Utility Easements will be re-dedicated with the final plat.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
160th Street (CSAH 46)
The Edison at Spirit is located south of and adjacent to 160th Street, a minor arterial County
roadway. 160th Street is constructed as a four-lane divided roadway. A ten-foot bituminous trail
will be constructed on the south side of the roadway from Pilot Knob Road adjacent to The Edison
at Spirit. The trail will be extended to Eagleview Drive with the development of Outlot K, Spirit of
Brandtjen Farm Commercial 2nd Addition. The current Dakota County Plat Review Needs Map
dated April 16, 2013 designates 160th Street as a future six-lane divided roadway with a half right-
of-way requirement of 100-feet adjacent to the plat. The Dakota County Plat Commission
reviewed the plat at its June 11, 2018 meeting and recommended the development for approval.
Elmhurst Lane
The Edison at Spirit is located east of and adjacent to Elmhurst Lane, a local commercial street.
The street is designed as a 44-foot wide, two lane urban roadway with 8-foot wide concrete
sidewalks within 80-foot wide right-of-way. No additional right-of-way dedication is required with
the final plat.
161st Street
Development of The Edison at Spirit includes the construction of 161st Street, a local roadway.
161st Street is designed as a 32-foot wide two lane urban roadway, within a 60-foot right-of-
way. The road widens to a 36-foot wide roadway with a westbound left turn lane at Elmhurst
TTHHEE EEDDIISSOONN AATT SSPPIIRRIITT–– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAUUGGUUSSTT 77,, 22001188
PPAAGGEE 33 OOFF 77
Lane, within a 66-foot right-of-way. 5-foot wide concrete sidewalks shall be installed along
both sides of 161st Street.
161st Street will provide access from Elmhurst Lane to the Edison at Spirit, and to adjacent
future development to the east and south of The Edison at Spirit, and will be extended east in
the future to Eagleview Drive.
A temporary cul-de-sac within a temporary easement and future street extension signs and
barricades must be installed at the east end of 161st Street until it is extended in the future. A
$2,000 escrow will be required with the final plat for the future removal and restoration of the
temporary cul-de-sac.
SSIITTEE PPLLAANN RREEVVIIEEWW
The Edison at Spirit includes the construction of a 4-story, 150 unit apartment building and
five secondary carriage house buildings.
Access to the site will be provided by the construction of 161st Street along the southern
boundary of the site. Two driveway entrances along the north side of 161st Street will be
constructed to provide access to the apartment building and carriage houses. Parking will be
provided via 82 surface parking stalls, 30 garage spaces for the carriage house units, and a 200
space underground parking structure. The development does not meet the requirements of
the City Zoning Ordinance to provide 2.0 stalls per dwelling unit, however the developer has
provided proof of parking to show that the required number of stalls can be constructed in
the future if the need arises.
The site includes a landscaped courtyard in the center of the apartment building and a
swimming pool and outdoor kitchen located west of the apartment building.
The landscaping plan provides for several types of trees and shrubs in landscaped areas
around the building and parking lot. Landscaping areas around the building will be
predominantly sodded or hardwood mulched.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and site construction shall be from
Elmhurst Drive along the 161st Street alignment. A rock construction entrance will be
constructed to provide access and egress from Elmhurst Drive.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
Development of The Edison at Sprit includes the construction of five foot wide concrete
sidewalks along both sides of 161st Street.
TTHHEE EEDDIISSOONN AATT SSPPIIRRIITT–– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAUUGGUUSSTT 77,, 22001188
PPAAGGEE 44 OOFF 77
The Park Dedication fee has not been collected on the parent parcel and will be satisfied
through a cash contribution with the final plat. The Park Dedication fee for areas of attached
dwelling units in Spirit of Brandtjen Farm is $1,930.00 per unit, consistent with the Spirit of
Brandtjen Farm Master PUD Agreement.
160 units x $1,930/unit = $308,800.00
Total attached
Dwelling units
Park Dedication Charge Required Park Dedication
The Park Dedication fee for Outlot A will be collected at the time that it is final platted into
lots and blocks.
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR
The Edison at Spirit is located within subdistrict NC-20060 of the North Creek sanitary sewer
district, as identified in the City’s Comprehensive Sewer Plan. Wastewater will be conveyed to
the MCES Farmington Interceptor and continue to the Empire Wastewater Treatment Facility.
The downstream facilities have sufficient capacity to serve the proposed commercial
development.
The Developer shall extend an 8-inch public sanitary sewer main with the construction of
161st Street from an existing sanitary sewer stub on the east side of Elmhurst Lane. A private
sanitary sewer service will be extended from the public main to provide sanitary sewer service
to the development.
The Sanitary Sewer Availability Charge has not been collected on the parent parcel and shall
be collected with the Building Permit Application. The Sanitary Sewer Availability Charge will
be calculated at the rate in effect at the time of approval of the Building Permit Application, as
determined by the City’s Building Official.
WWAATTEERRMMAAIINN
Development of The Edison at Spirit includes the construction of 8-inch public watermain
with the construction of 161st Street. The 8-inch watermain will be extended from an existing
stub on the east side of Elmhurst Lane to an existing stub on the west side of Eagleview Drive
to provide adequate fire flows to the development. The watermain extension will be
constructed along the anticipated future alignment of 161st Street east of the development
site. Private 8-inch watermain will be extended from the public main to provide service to the
development.
Watermain stubs will be constructed to provide future service to the parcel south of 161st
Street.
TTHHEE EEDDIISSOONN AATT SSPPIIRRIITT–– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAUUGGUUSSTT 77,, 22001188
PPAAGGEE 55 OOFF 77
Final locations and sizes of all sanitary sewer and watermain facilities will be reviewed by City
staff with the final construction plans submitted with the building permit application.
OOVVEERRHHEEAADD LLIINNEESS
There are no overhead utilities located adjacent to or within the parent parcel.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
The Edison at Spirit is located within subdistricts NC-14A and NC-14B of the North Creek
Stormwater District as identified in the City’s Water Resources Management Plan.
Stormwater runoff generated from The Edison at Spirit development will be conveyed via a
proposed private storm sewer system onsite to existing storm sewer stubs along the west
boundary of the site and into existing storm sewer on Elmhurst Lane. The stormwater
management requirements for the parent parcel were satisfied through stormwater
management basins constructed with Spirit of Brandtjen Farm Commercial 2nd Addition.
The final grading plan must indicate any proposed borrow areas in which the building
footings will be placed on fill material. The grading specifications must indicate that all
embankments meet FHA/HUD 79G specifications. A final certificate of occupancy shall not be
issued until an as-built certified grading plan has been submitted and approved by the City
Engineer.
The Edison at Spirit contains more than one acre of disturbed area, therefore a National
Pollution Discharge Elimination System General Stormwater Permit for construction activity is
required from the Minnesota Pollution Control Agency.
SSTTOORRMM SSEEWWEERR
The development of The Edison at Spirit includes the construction of both private and public
storm sewer. The privately-owned and maintained storm sewer will be located within Lot 1,
Block 1 and will collect and convey stormwater runoff generated from within the
development to existing public storm sewer located in Elmhurst Lane and proposed public
storm sewer to be constructed with 161st Street.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and must be
paid with the final plat. The Trunk Storm Sewer Area Charge for Lot 1, Block 1 is calculated as
follows:
267,272.00 s.f. x $0.198/s.f. = $52,919.86
Area of Lot 1, Block 1 and 161st St ROW Multi-Family
Area Charge
Total Trunk
Storm Sewer Area Charge
TTHHEE EEDDIISSOONN AATT SSPPIIRRIITT–– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAUUGGUUSSTT 77,, 22001188
PPAAGGEE 66 OOFF 77
The Trunk Storm Sewer Area Charge for Outlot A will be collected at the time that it is final
platted into lots and blocks.
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FEMA FLOODPLAIN ANALYSIS
The Edison at Spirit is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal
Emergency Management Agency (FEMA). Based on this designation, there are no areas in the
plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA.
WWEETTLLAANNDDSS
There are no existing wetlands on the site.
TTRREEEE PPRREESSEERRVVAATTIIOONN
No significant trees are located on the property.
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing and maintaining the SWPPP throughout construction phase. The permit requires
that all erosion and sediment BMPS must be clearly outlined in a site’s SWPPP. Changes made
throughout construction should be documented in the SWPPP.
Additional erosion control measures may be required during construction as deemed
necessary by City staff or the Dakota County Soil and Water District. Any additional measures
required shall be installed and maintained by the Developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to The Edison at Spirit. The security amounts shall be based on cost
estimates provided by the developer’s Engineer and shall be determined with the final plat.
CCAASSHH FFEEEESS
A cash fee for traffic control signs is due with The Edison at Spirit. The cash fee will be
determined with the final plat.
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
TTHHEE EEDDIISSOONN AATT SSPPIIRRIITT–– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAUUGGUUSSTT 77,, 22001188
PPAAGGEE 77 OOFF 77
160 units x $8.85/unit/qtr. x 4 qtrs. = $5,664.00
Total Multi-Family Units Environmental Resources
Fee Total
A cash fee for one-year of the Environmental Resources Fee shall be paid at the time of final
plat approval and is calculated as follows:
160 units x 0.25 x $10.42/unit/qtr. x 4 qtrs. = $1,667.20
Total Multi-Family Units Apartements/Townhomes
Residential Equivalent Utility
Factor
Environmental Resources
Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
2 units x $90.00/unit = $180.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost.
CASH REQUIREMENTS
Sanitary Sewer Availability Charge to be paid with building permit
Park Dedication Fee $ 308,800.00
Trunk Storm Sewer Area Charge 52,919.86
Streetlight Operating Expenses 5,664.00
Environmental Resources Fee 1,667.20
Traffic Control Signs to be determined with final plat
City Base Map Updating Fee 180.00
City Engineering Administration (3.00%) to be determined with final plat
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of The Edison at Spirit preliminary and final plat, grading
and erosion control plan and utility plan subject to the requirements and stipulations within
this report.
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Daryl Morey, Planning Director
From: Joe Powers, Project Engineer
McKenzie L. Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Alex Jordan, Assistant City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Dave Olson, Community and Economic Development Director
Date: September 19, 2018
Subject: The Edison at Spirit
• Final Plat Review
• Grading and Erosion Control Plan Review
• Utility Plan Review
• Site Plan Review
• Easement Vacation
BBAACCKKGGRROOUUNNDD
JPL Development LLC has submitted a preliminary and final plat named The Edison at Spirit
and plans for the development of 160 dwelling units within a multiple family building and
five secondary carriage house buildings. The parent parcel is a portion of Outlot L, Spirit of
Brandtjen Farm Commercial 2nd Addition. The subject site is located at the southeast corner
of 160th Street (CSAH 46) and Elmhurst Lane. The subject site is zoned PUD, Planned Unit
Development District.
The preliminary and final plats consist of one lot within one block and one outlot on 12.09
acres.
TTHHEE EEDDIISSOONN AATT SSPPIIRRIITT––FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1199,, 22001188
PPAAGGEE 22 OOFF 88
The outlot created with the preliminary and final plat shall have the following use:
Outlot A: Retained by SBF Development Corporation for a future phase of
development (5.96 acres).
The proposed development and site plan will be completed by:
Developer: JPL Development
Engineer/Surveyor: Westwood Professional Services, Inc.
SSIITTEE CCOONNDDIITTIIOONNSS
The Edison at Spirit site consists of undeveloped land. The property is generally flat, sloping to
low points at the north and southwest boundaries of the site.
EEAASSEEMMEENNTTSS
The parent parcel contains existing public Drainage and Utility Easements dedicated with the
Spirit of Brandtjen Farm Commercial 2nd Addition plat, which will be vacated with the final
plat. The Drainage and Utility Easements will be re-dedicated with the final plat.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
160th Street (CSAH 46)
The Edison at Spirit is located south of and adjacent to 160th Street, a minor arterial County
roadway. 160th Street is constructed as a four-lane divided roadway. A ten-foot bituminous trail
will be constructed on the south side of the roadway from Pilot Knob Road adjacent to The Edison
at Spirit. The trail will be extended to Eagleview Drive with the development of Outlot K, Spirit of
Brandtjen Farm Commercial 2nd Addition. The current Dakota County Plat Review Needs Map
dated April 16, 2013 designates 160th Street as a future six-lane divided roadway with a half right-
of-way requirement of 100-feet adjacent to the plat. The Dakota County Plat Commission
reviewed the plat at its June 11, 2018 meeting and recommended the development for approval.
Elmhurst Lane
The Edison at Spirit is located east of and adjacent to Elmhurst Lane, a local commercial street.
The street is designed as a 44-foot wide, two lane urban roadway with 8-foot wide concrete
sidewalks within 80-foot wide right-of-way. No additional right-of-way dedication is required with
the final plat.
161st Street
Development of The Edison at Spirit includes the construction of 161st Street, a local roadway.
161st Street is designed as a 32-foot wide two lane urban roadway, within a 60-foot right-of-
way. The road widens to a 36-foot wide roadway with a westbound left turn lane at Elmhurst
TTHHEE EEDDIISSOONN AATT SSPPIIRRIITT––FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1199,, 22001188
PPAAGGEE 33 OOFF 88
Lane, within a 66-foot right-of-way. 5-foot wide concrete sidewalks shall be installed along
both sides of 161st Street.
161st Street will provide access from Elmhurst Lane to The Edison at Spirit, and to adjacent
future development to the east and south of The Edison at Spirit, and will be extended east in
the future to Eagleview Drive.
A temporary cul-de-sac within a temporary easement and future street extension signs and
barricades must be installed at the east end of 161st Street until it is extended in the future. A
$2,000 escrow will be required with the final plat for the future removal and restoration of the
temporary cul-de-sac.
SSIITTEE PPLLAANN RREEVVIIEEWW
The Edison at Spirit includes the construction of a 4-story, 150 unit apartment building and
five secondary carriage house buildings.
Access to the site will be provided by the construction of 161st Street along the southern
boundary of the site. Two driveway entrances along the north side of 161st Street will be
constructed to provide access to the apartment building and carriage houses. Parking will be
provided via 82 surface parking stalls, 30 garage spaces for the carriage house units, and a 200
space underground parking structure. The development does not meet the requirements of
the City Zoning Ordinance to provide 2.0 stalls per dwelling unit, however the developer has
provided proof of parking to show that the required number of stalls can be constructed in
the future if the need arises.
The site includes a landscaped courtyard in the center of the apartment building and a
swimming pool and outdoor kitchen located west of the apartment building.
The landscaping plan provides for several types of trees and shrubs in landscaped areas
around the building and parking lot. Landscaping areas around the building will be
predominantly sodded or hardwood mulched.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and site construction shall be from
Elmhurst Drive along the 161st Street alignment. A rock construction entrance will be
constructed to provide access and egress from Elmhurst Drive.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
Development of The Edison at Sprit includes the construction of five foot wide concrete
sidewalks along both sides of 161st Street.
TTHHEE EEDDIISSOONN AATT SSPPIIRRIITT––FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1199,, 22001188
PPAAGGEE 44 OOFF 88
The Park Dedication fee has not been collected on the parent parcel and will be satisfied
through a cash contribution with the final plat. The Park Dedication fee for areas of attached
dwelling units in Spirit of Brandtjen Farm is $1,930.00 per unit, consistent with the Spirit of
Brandtjen Farm Master PUD Agreement.
160 units x $1,930/unit = $308,800.00
Total attached
Dwelling units
Park Dedication Charge Required Park Dedication
The Park Dedication fee for Outlot A will be collected at the time that it is final platted into
lots and blocks.
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR
The Edison at Spirit is located within subdistrict NC-20060 of the North Creek sanitary sewer
district, as identified in the City’s Comprehensive Sewer Plan. Wastewater will be conveyed to
the MCES Farmington Interceptor and continue to the Empire Wastewater Treatment Facility.
The downstream facilities have sufficient capacity to serve the proposed commercial
development.
The Developer shall extend an 8-inch public sanitary sewer main with the construction of
161st Street from an existing sanitary sewer stub on the east side of Elmhurst Lane. A private
sanitary sewer service will be extended from the public main to provide sanitary sewer service
to the development.
The Sanitary Sewer Availability Charge has not been collected on the parent parcel and shall
be collected with the Building Permit Application. The Sanitary Sewer Availability Charge will
be calculated at the rate in effect at the time of approval of the Building Permit Application, as
determined by the City’s Building Official.
WWAATTEERRMMAAIINN
Development of The Edison at Spirit includes the construction of 8-inch public watermain
with the construction of 161st Street. The 8-inch watermain will be extended from an existing
stub on the east side of Elmhurst Lane to an existing stub on the west side of Eagleview Drive
to provide adequate fire flows to the development. The watermain extension will be
constructed along the anticipated future alignment of 161st Street east of the development
site. Private 8-inch watermain will be extended from the public main to provide service to the
development.
Watermain stubs will be constructed to provide future service to the parcel south of 161st
Street.
TTHHEE EEDDIISSOONN AATT SSPPIIRRIITT––FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1199,, 22001188
PPAAGGEE 55 OOFF 88
Final locations and sizes of all sanitary sewer and watermain facilities will be reviewed by City
staff with the final construction plans submitted with the building permit application.
OOVVEERRHHEEAADD LLIINNEESS
There are no overhead utilities located adjacent to or within the parent parcel.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
The Edison at Spirit is located within subdistricts NC-14A and NC-14B of the North Creek
Stormwater District as identified in the City’s Water Resources Management Plan.
Stormwater runoff generated from The Edison at Spirit development will be conveyed via a
proposed private storm sewer system onsite to existing storm sewer stubs along the west
boundary of the site and into existing storm sewer on Elmhurst Lane. The stormwater
management requirements for the parent parcel were satisfied through stormwater
management basins constructed with Spirit of Brandtjen Farm Commercial 2nd Addition.
The final grading plan must indicate any proposed borrow areas in which the building
footings will be placed on fill material. The grading specifications must indicate that all
embankments meet FHA/HUD 79G specifications. A final certificate of occupancy shall not be
issued until an as-built certified grading plan has been submitted and approved by the City
Engineer.
The Edison at Spirit contains more than one acre of disturbed area, therefore a National
Pollution Discharge Elimination System General Stormwater Permit for construction activity is
required from the Minnesota Pollution Control Agency.
SSTTOORRMM SSEEWWEERR
The development of The Edison at Spirit includes the construction of both private and public
storm sewer. The privately-owned and maintained storm sewer will be located within Lot 1,
Block 1 and will collect and convey stormwater runoff generated from within the
development to existing public storm sewer located in Elmhurst Lane and proposed public
storm sewer to be constructed with 161st Street.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and must be
paid with the final plat. The Trunk Storm Sewer Area Charge for Lot 1, Block 1 is calculated as
follows:
267,272.00 s.f. x $0.198/s.f. = $52,919.86
Area of Lot 1, Block 1 and 161st St ROW Multi-Family
Area Charge
Total Trunk
Storm Sewer Area Charge
TTHHEE EEDDIISSOONN AATT SSPPIIRRIITT––FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1199,, 22001188
PPAAGGEE 66 OOFF 88
The Trunk Storm Sewer Area Charge for Outlot A will be collected at the time that it is final
platted into lots and blocks.
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FEMA FLOODPLAIN ANALYSIS
The Edison at Spirit is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal
Emergency Management Agency (FEMA). Based on this designation, there are no areas in the
plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA.
WWEETTLLAANNDDSS
There are no existing wetlands on the site.
TTRREEEE PPRREESSEERRVVAATTIIOONN
No significant trees are located on the property.
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing and maintaining the SWPPP throughout construction phase. The permit requires
that all erosion and sediment BMPS must be clearly outlined in a site’s SWPPP. Changes made
throughout construction should be documented in the SWPPP.
Additional erosion control measures may be required during construction as deemed
necessary by City staff or the Dakota County Soil and Water District. Any additional measures
required shall be installed and maintained by the Developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to The Edison at Spirit.
CONSTRUCTION COSTS
Sanitary Sewer Installation
Water Main Installation
Storm Sewer Installation
Street Construction
Grading, Erosion Control, and Restoration
$23,231.58
41,881.95
67,757.00
203,859.70
18,319.75
SUBTOTAL - CONSTRUCTION COSTS $355,049.98
TTHHEE EEDDIISSOONN AATT SSPPIIRRIITT––FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1199,, 22001188
PPAAGGEE 77 OOFF 88
OTHER COSTS
Developer’s Design (3.0%) $ 10,651.50
Developer’s Construction Survey (2.5%) 8,876.25
City’s Legal Expense (0.5%) 1,775.25
City Construction Observation (5.0%) 17,752.50
Developer’s Record Drawing (0.5%) 1,775.25
Landscaping 30,000.00
Street Lights 5,400.00
Lot Corners/Iron Monuments 200.00
SUBTOTAL - OTHER COSTS $76,430,75
TOTAL PROJECT SECURITY $ 431,480.73
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$200.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction.
The street light security totals $5,400 which consists of one (1) post-top street light at $1,200
each and three (3) mast arm street lights at $1,400 each.
CCAASSHH FFEEEESS
A cash fee for traffic control signs is due with The Edison at Spirit. Street signing consists of:
one stop and street blade combination at $450 each, one turn lane sign at $450 each, three
nine button delineators at $125 each, one future thru street sign at $75 each and a
mobilization fee of $150 for a total of $1,500. If the street signs are installed during frost
conditions, the developer shall pay an additional $150 for each street sign location.
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
160 units x $8.85/unit/qtr. x 4 qtrs. = $5,664.00
Total Multi-Family Units Streetlight Operating Fee Total
A cash fee for one-year of the Environmental Resources Fee shall be paid at the time of final
plat approval and is calculated as follows:
160 units x 0.25 x $10.42/unit/qtr. x 4 qtrs. = $1,667.20
Total Multi-Family Units Apartments/Townhomes
Residential Equivalent Utility
Factor
Environmental Resources
Fee Total
TTHHEE EEDDIISSOONN AATT SSPPIIRRIITT––FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1199,, 22001188
PPAAGGEE 88 OOFF 88
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
2 x $90.00/unit = $180.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $10,651.50.
CASH REQUIREMENTS
Removal of Temporary Cul-de-Sac $2,000
Sanitary Sewer Availability Charge to be paid with building permit
Park Dedication Fee 308,800.00
Trunk Storm Sewer Area Charge 52,919.86
Streetlight Operating Expenses 5,664.00
Environmental Resources Fee 1,667.20
Traffic Control Signs 1,500.00
City Base Map Updating Fee 180.00
City Engineering Administration (3.00%) 10,651.50
TOTAL CASH REQUIREMENT WITH FINAL PLAT = $381,382.56
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of The Edison at Spirit final plat, grading and erosion
control plan, and utility plan subject to the requirements and stipulations within this report.