HomeMy WebLinkAbout18301 Gleed Rd SurveyPlanning DepartmentApprovedDate:__________________09/26/2018dmoreyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.ENGINEERING REVIEWEDDate:__________________10/01/2018corlowskyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.