HomeMy WebLinkAboutItem 06.c
Date: Item No.
FIBER NETWORK QUOTE ACCEPTANCE FOR HERITAGE LIQUOR
AND ARTS CENTER
Proposed Action
Staff recommends adoption of the following motion: Move to accept quote and award contract to
MPNexlevel for the construction of fiber optic network segments from City Hall to the Heritage Liquor
Store and Lakeville Arts Center.
Overview
City IT Staff continues to work with Dakota County to build-out the Cities fiber optic data network that
began in 2017. Phase III (2018 Build) includes two fiber segments that will need to be constructed from
City Hall to Heritage Liquor Store and Lakeville Arts Center.
The remodeling of the Dakota County Library adjacent to City Hall creates an opportunity for the City
and County to replace an existing fiber segment that runs from Lake Marion Elementary thru the library
and then to City Hall. A lateral fiber connection to this segment from Heritage Liquor will be constructed
by the City. Lakeville Arts Center will be connected to dark fiber provided by ISD 194 near the Arts
Center and traverse the districts network to Lake Marion Elementary and then to City Hall. This
opportunity allows the City to connect these two sites at a lower cost than originally estimated and is
under budget.
City Cost: $46,545.31
Dakota County Cost: $22,006.99
Total Project Cost: $68,552.30
Primary Issues to Consider
Issues with existing leased fiber network include:
• Inadequate bandwidth and no ability to manage network for current and future needs
• Cost prohibitive to upgrade bandwidth from current provider
Supporting Information
• MPN Proposal Heritage Liq & Arts Ctr
Financial Impact: $46,545.31 Budgeted: Y☒ N☐
Source: General Fund, Water Operating Fund, Sanitary Sewer Fund, Liquor Fund, and Communications
Fund
Related Documents: (CIP, ERP, etc.):
Envision Lakeville Community Values: Good Value for Public Services
Report Completed by: Ralph Vetter, I.S. Manager
November 5, 2018
CIP and 2018 Budget
Estimator:500 County Road 37 East Maple Lake MN 55358
Cell: 612-919-5516 Office: 320-963-2400
Fax: 320-963-2439
We Propose hereby to supply -- complete in accordance with above specifications, for the sum of:
()
SCHOOL SPLICE THROUGH TO SCHOOL
~ SPLICE AND TEST UP TO 12 FIBERS LINK
~ NEW ABOVE GROUND BUILDING ENTRANCE
~ INSTALL PROVIDED RACK MOUNT PANEL & SPLICE CASE
LAKEVILLE LIQUOR
HERITAGE LIBRARY
~ REMOVE EXISTING 12F & PROVIDE & PLACE 4500' OF 144F FROM LIBRARY
TO HH OUTSIDE MARION SCHOOL
~ PROVIDE & INSTALL 144F TERM PANEL AT LIBRARY & CITY HALL - TERM
& TEST FIBER CABLES
~ INSTALL CUSTOMER PROVIDED TYCO CASE OUTSIDE IN HH AT MARION
Signature
Signature
Date of Acceptance
days.
Payment to be made as follows:
We hereby submit specifications and estimates for:
Authorized
Signature:
Note:This proposal may be
withdrawn if not accepted within
CITY OF LAKEVILLE 10/1618
201985 HOLYOKE AVENUE 3 PROJECTS
LAKEVILLE, MN 55044 LAKEVILLE
RALPH VETTER rvetter@lakevillemn.gov
Project Manager
bborell@mpnexlevel.com
Todd Wolff - Regional Vice President
PHONEPROPOSAL SUBMITTED TO DATE
ADDRESS JOB NAME
CITY, STATE AND ZIP CODE JOB LOCATION
Proposal
$68,552.30
Acceptance of Proposal - The above prices,
specifications and conditions are satisfactory and are hereby
accepted. You are authorized to do the work as specified.
Payment will be made as outlined above.
30
All material is guaranteed to be as specified. All work to be done in a workmanlike
manner according to standard practices. Any alteration or deviation from above
specifications involving extra costs will be executed only upon written orders, and will
become an extra charge over and above the estimate. All agreements contingent upon
strikes, accidents or delays beyond our control. Owners carry fire, tornado and other
necessary insurance. Our workers are fully covered by Worker's Compensation
Insurance.
Sixty eight thousand five hundred fifty two dollars and thirty two cents
Terms: 30 Days, 1.5 percent per month ( 18 percent annual will be charged on past due balances )
Bill Borell
$10,876.66
CONTACT EMAIL ADDRESS FAX NUMBER
$44,013.98
~ REMOVE EXISTING PULL HH & REPLACE WITH PROVIDED SPLICNG HH $13,661.66
LAKEVILLE ARTS CENTER
~ REMOVE EXISTING PULL HH AND REPLACE WITH CUSTOMER PROVIDED
SPLICING HH
~ INSTALL PROVIDED 1.5" DUCT 170' PULLING IN PROVIDED 12F
~ SPLICE AND TEST UP TO 12 FIBERS LINK
~ INSTALL PROVIDED 1.5" DUCT 500' PULLING IN PROVIDED 12F
~ NEW ABOVE GROUND BUILDING ENTRANCE
~ INSTALL PROVIDED RACK MOUNT PANEL & SPLICE CASE