Date: November 19, 2018 Item No.
ACCEPTANCE OF IMPROVEMENTS AND FINAL PAYMENT TO PEMBER COMPANIES,
INC. FOR THE HOLYOKE AVENUE IMPROVEMENT PROJECT, CITY PROJECT 17-04
Proposed Action
Staff recommends adoption of the following motion: Move to accept improvements and approve
final payment to Pember Companies, Inc. for the Holyoke Avenue Improvement Project, City
Project 17-04.
Overview
Pember Companies, Inc. is requesting final acceptance of work and payment of Final Pay
Application No. 10 in the amount of $56,134.78. for the completion of the Holyoke Avenue
Improvement Project, City Project 17-04.
Attached is a summary of costs and change orders associated with the project. The original
contract amount was $1,946,766.70. There were four change orders totaling 14,609.26. The final
contract amount is $1,963,893.04. The added cost resulted from soil stabilization in the Arts
Center parking lot, winter work for the City Hall sign, and changes to the electrical service for
downtown festivals, and increases in quantities of materials.
The overall project cost, including engineering and professional fees, was approximately
$107,000.00 under budget. Staff will review any residual bond proceeds to determine the proper
use (either another street reconstruction project or to offset future debt service payments for the
2017A bonds).
All necessary paperwork, including lien waivers, the IC-134’s and Consent of Surety to Final
Payment have been submitted. Staff recommends acceptance and approval of the final pay
application.
Primary Issues to Consider
• Was all work satisfactorily completed? All work was satisfactorily completed and the
contractor has met the administrative requirements for final payment.
Supporting Information
• A copy of the contract close-out letter of recommendation from WSB & Associates, Inc. and
the final pay application and cost summary are attached.
Financial Impact: $56,134.78 Budgeted: Yes Source: 429 and Utility Bonds
Related Documents (CIP, ERP, etc.): CIP 2017-21 CIP
Community Values: Good Value for Public Services
Completed By: Neil Normandin, Interim Public Works Director
540 Gateway Boulevard | Suite 100 | Burnsville, MN 55337 | (952) 737-4660
Building a legacy – your legacy.
Equal Opportunity Employer | wsbeng.com
K:\03199-310\Admin\Construction Admin\Pay Vouchers\2018113 CST LTR VO 10 FINAL CTY-n normandin-3199-310.docx
November 13, 2018
Mr. Neil Normandin
Interim Public Works Director
City of Lakeville
18400 Ipava Avenue
Lakeville, MN 55044
Re: Construction Pay Voucher No. 10
Holyoke Avenue Improvement Project
City of Lakeville Project No. 17-04
WSB Project No. 3199-310
Dear Mr. Normandin:
Please find enclosed Construction Pay Voucher No. 10 & Final for the above referenced project in the
amount of $56,134.78. The quantities completed to date have been reviewed and agreed upon by the
contractor, and we hereby recommend that the City of Lakeville approve the Final Construction Pay
Voucher for Pember Companies, Inc.
Also, enclosed please find the final pay voucher, along with:
1. Satisfactory showing that the contractor has complied with the provisions of Minnesota
Statutes 290.92 requiring withholding state income tax (IC134 forms).
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the
contract have been fully paid or satisfactorily secured (lien waivers).
3. Consent of Surety to Final Payment certification from the contractor’s surety.
4. Two-year maintenance bond commencing upon final acceptance of the
improvements by the City Council.
Please include one executed copy with the payment to Pember Companies, Inc. and return one executed
copy to our office for our file. If you have any questions or comments regarding this voucher, please
contact me at (763) 762-2803. Thank you.
Sincerely,
WSB & Associates, Inc.
Adam Gadbois, PE
Project Engineer
Enclosures
cc: Haley Pember, Pember Companies, Inc.
Matt Barnard, City of Lakeville
Monica Heil, WSB & Associates, Inc.
ag
Contract Amounts
Original Contract $1,946,766.70
Contract Changes $14,609.26
Revised Contract $1,961,375.96
Funds Encumbered
Original $1,946,766.70
Additional N/A
Total $1,946,766.70
Work Certified To Date
Base Bid Items $1,949,283.78
Backsheet $0.00
Change Order $14,609.26
Supplemental Agreement $0.00
Work Order $0.00
Material On Hand $0.00
Total $1,963,893.04
Amount Paid This Final Pay Voucher $56,134.78
03199-31 $17,200.94 $1,963,893.04 $0.00 $1,907,758.26 $56,134.78 $1,963,893.04
Percent Retained: 0.0000%
Work Certified
This Pay Voucher
Work Certified
To Date
Less Amount
Retained
Less Previous
Payments
Amount Paid
This Pay Voucher
Total Amount
Paid To Date
I hereby certify that a Final Examination has been made of the noted Contract, that the Contract has been completed,
that the entire amount of Work Shown in this Final Voucher has been performed and the Total Value of the Work Performed
in accordance with, and pursuant to, the terms of the Contract is as shown in this Final Voucher.
Approved By Approved By Pember Companies, Inc.
Contractor
Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project 03199-31 - LKVL - Holyoke Avenue Improvement Project
Final Pay Voucher No. 10
Contractor: Pember Companies, Inc.
N4449 469th Street
Menomonie, WI 54751
Contract No.
Vendor No.
For Period: 7/4/2018 - 11/13/2018
Warrant # __________ Date ___________
Page 1
Interim Public Works Director
Finance Director
Date
1 07/01/2017 07/31/2017 $78,808.40 $3,940.42 $74,867.98
2 08/01/2017 08/31/2017 $544,075.05 $27,203.75 $516,871.30
3 09/01/2017 09/30/2017 $392,247.00 $19,612.35 $372,634.65
4 10/01/2017 10/31/2017 $499,102.57 $24,955.13 $474,147.44
5 11/01/2017 11/30/2017 $148,621.25 $7,431.06 $141,190.19
6 12/01/2017 12/31/2017 $81,848.15 $4,092.41 $77,755.74
7 04/01/2018 04/30/2018 $80,126.03 $4,006.30 $76,119.73
8 05/01/2018 05/31/2018 $116,047.90 $5,802.40 $110,245.50
9 06/01/2018 07/03/2018 $5,815.75 ($58,109.98) $63,925.73
10 07/04/2018 11/13/2018 $17,200.94 ($38,933.84) $56,134.78
Totals: $1,963,893.04 $0.00 $1,963,893.04
03199-31 Payment Summary
No. From Date To Date
Work Certified
Per Pay Voucher
Amount Retained
Per Pay Voucher
Amount Paid
Per Pay Voucher
UNF 1,963,893.02 0.00 1,907,758.24 56,134.78 1,963,893.02
Totals: $1,963,893.02 $0.00 $1,907,758.24 $56,134.78 $1,963,893.02
03199-31 Funding Category Report
Funding
Category
No.
Work
Certified
To Date
Less
Amount
Retained
Less
Previous
Payments
Amount Paid
This
Pay Voucher
Total
Amount Paid
To Date
UNF Unfunded 56,134.78 1,961,375.96 1,946,766.70 1,963,893.02
Totals: $56,134.78 $1,961,375.96 $1,946,766.70 $1,963,893.02
03199-31 Funding Source Report
Accounting
No.
Funding
Source
Amount Paid
This
Pay Voucher
Revised
Contract
Amount
Funds
Encumbered
To Date
Paid To
Contractor
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 2
SCHEDULE A. 202ND ST W./CSAH 50 TO 207TH ST W.
1 2021.501 MOBILIZATION LS $25,000.00 1 0 $0.00 1 $25,000.00
2 2101.502 CLEARING TREE $135.00 5 0 $0.00 5 $675.00
3 2101.507 GRUBBING TREE $135.00 5 0 $0.00 5 $675.00
4 2104.501
REMOVE
CONCRETE CURB L F $10.00 1090 0 $0.00 1030 $10,300.00
5 2104.501
REMOVE SEWER
PIPE (STORM)L F $16.00 82 0 $0.00 90 $1,440.00
6 2104.503
REMOVE
CONCRETE WALK S F $1.40 1750 0 $0.00 2728.6 $3,820.04
7 2104.509 REMOVE SIGN EACH $30.00 12 0 $0.00 0 $0.00
8 2104.509
REMOVE
CASTING EACH $80.00 1 0 $0.00 0 $0.00
9 2104.509
REMOVE
DRAINAGE
STRUCTURE
EACH $600.00 5 0 $0.00 5 $3,000.00
10 2104.511
SAWING
CONCRETE
PAVEMENT (FULL
DEPTH)
L F $5.50 50 0 $0.00 0 $0.00
11 2104.513
SAWING
BITUMINOUS
PAVEMENT (FULL
DEPTH)
L F $3.30 180 0 $0.00 0 $0.00
12 2104.601
REMOVE AND
REPLACE
BITUMINOUS
DRIVEWAY
PAVEMENT
SQ
YD $68.00 45 0 $0.00 0 $0.00
13 2104.601
REMOVE AND
REPLACE
CONCRETE
DRIVEWAY
PAVEMENT
SQ
YD $105.00 40 0 $0.00 15.1 $1,585.50
14 2105.507
SUBGRADE
EXCAVATION C Y $35.00 20 0 $0.00 0 $0.00
15 2105.522
SELECT
GRANULAR
BORROW (LV)
C Y $15.00 10 0 $0.00 0 $0.00
16 2123.610
STREET
SWEEPER (WITH
PICKUP BROOM)
HOUR $115.00 10 5 $575.00 5 $575.00
17 2211.501
AGGREGATE
BASE CLASS 5 TON $24.00 10 0 $0.00 0 $0.00
18 2232.501
MILL BITUMINOUS
SURFACE (2.0")S Y $1.60 11470 0 $0.00 11470 $18,352.00
19 2357.502
BITUMINOUS
MATERIAL FOR
TACK COAT
GAL $1.55 1270 0 $0.00 900 $1,395.00
TYPE SP 9.5
03199-31 Project Material Status
Line Item Description Units Unit Price
Contract
Quantity
Quantity
This
Pay
Voucher
Amount
This
Pay
Voucher
Quantity
To Date
Amount
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 3
20 2360.501
WEARING
COURSE MIX (3,B)TON $47.50 1430 0 $0.00 1476.56 $70,136.60
21 2360.502
BITUMINOUS
PAVEMENT
PATCHING
S Y $56.00 90 0 $0.00 60.1 $3,365.60
22 2501.515
54" RC PIPE
APRON EACH $3,550.00 1 0 $0.00 1 $3,550.00
23 2503.541
12" RC PIPE
SEWER DES 3006
CL III
L F $58.50 66 0 $0.00 61 $3,568.50
24 2503.541
15" RC PIPE
SEWER DES 3006
CL III
L F $72.40 8 0 $0.00 16 $1,158.40
25 2503.541
21" RC PIPE
SEWER DES 3006
CL III
L F $81.60 8 0 $0.00 8 $652.80
26 2504.602
IRRIGATION
SYSTEM REPAIR EACH $1,000.00 2 0 $0.00 2 $2,000.00
27 2504.602
ADJUST VALVE
BOX EACH $200.00 3 0 $0.00 5 $1,000.00
28 2504.602
VALVE BOX
(SECTION)EACH $105.00 2 0 $0.00 2 $210.00
29 2506.502
CONSTRUCT
DRAINAGE
STRUCTURE
DESIGN SPECIAL
(2'X3')
LIN
FT $960.00 2 0 $0.00 2 $1,920.00
30 2506.501
CONSTRUCT
DRAINAGE
STRUCTURE
DESIGN 48-4020
L F $625.00 4 0 $0.00 4 $2,500.00
31 2506.501
CONSTRUCT
DRAINAGE
STRUCTURE
DESIGN 72-4020
L F $1,350.00 4 0 $0.00 4 $5,400.00
32 2506.516
CASTING
ASSEMBLY EACH $625.00 1 0 $0.00 1 $625.00
33 2506.516
CASTING
ASSEMBLY
(MANHOLE)
EACH $600.00 1 0 $0.00 0 $0.00
34 2506.602
CONNECT TO
EXISTING
STRUCTURE
EACH $450.00 2 0 $0.00 3 $1,350.00
35 2506.602
ADJUST FRAME &
RING CASTING EACH $650.00 21 0 $0.00 13 $8,450.00
36 2506.602 CHIMNEY SEAL EACH $250.00 8 0 $0.00 8 $2,000.00
37 2506.603
STRUCTURE
INTERIOR
CONCRETE WORK
- RE-GROUT
DOGHOUSES
EACH $250.00 14 0 $0.00 14 $3,500.00
03199-31 Project Material Status
Line Item Description Units Unit Price
Contract
Quantity
Quantity
This
Pay
Voucher
Amount
This
Pay
Voucher
Quantity
To Date
Amount
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 4
38 2506.603
STRUCTURE
INTERIOR
CONCRETE WORK
- RE-POUR
INVERT
EACH $430.00 2 0 $0.00 2 $860.00
39 2506.603
6" TOP SLAB FOR
48-4020
STRUCTURE
EACH $1,680.00 4 0 $0.00 4 $6,720.00
40 2231.603
CRACK REPAIR,
SPECIAL L F $20.00 12 0 $0.00 12 $240.00
41 2521.501
4" CONCRETE
WALK S F $5.60 470 91 $509.60 586 $3,281.60
42 2521.501
6" CONCRETE
WALK S F $11.10 1080 0 $0.00 1279 $14,196.90
43 2531.501
CONCRETE CURB
& GUTTER
DESIGN B624
L F $27.80 1090 0 $0.00 1030 $28,634.00
44 2531.618
TRUNCATED
DOMES S F $45.00 168 0 $0.00 108 $4,860.00
45 2531.618
ADA COMPLIANCE
SUPERVISOR LS $1,150.00 1 0 $0.00 1 $1,150.00
46 2563.601
TRAFFIC
CONTROL LS $12,000.00 1 0 $0.00 1 $12,000.00
47 2573.530
STORM DRAIN
INLET
PROTECTION
EACH $100.00 24 0 $0.00 7 $700.00
48 2573.533
SEDIMENT
CONTROL LOG
TYPE WOOD
FIBER
L F $5.00 100 0 $0.00 54 $270.00
49 2575.560 HYDROMULCH S Y $15.00 370 0 $0.00 449 $6,735.00
50 2582.501
PAVEMENT
MESSAGE (LEFT
ARROW) PAINT
EACH $75.00 3 0 $0.00 3 $225.00
51 2582.501
PAVEMENT
MESSAGE (THRU
ARROW) PAINT
EACH $75.00 2 0 $0.00 0 $0.00
52 2582.502
4" SOLID LINE
WHITE-PAINT L F $0.15 3890 0 $0.00 3890 $583.50
53 2582.502
4" DOUBLE SOLID
LINE YELLOW-
PAINT
L F $0.25 2800 0 $0.00 2682 $670.50
54 2582.502
12" SOLID LINE
YELLOW-PAINT L F $2.10 180 0 $0.00 180 $378.00
55 2582.503
CROSSWALK
PAINT S F $2.45 126 0 $0.00 126 $308.70
Totals For Section SCHEDULE A. 202ND ST W./CSAH 50 TO
207TH ST W.:$1,084.60 $260,017.64
SCHEDULE B. 207TH ST W. TO 210TH ST W.
56 2021.501 MOBILIZATION LS $42,000.00 1 0 $0.00 1 $42,000.00
03199-31 Project Material Status
Line Item Description Units Unit Price
Contract
Quantity
Quantity
This
Pay
Voucher
Amount
This
Pay
Voucher
Quantity
To Date
Amount
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 5
57 2101.502 CLEARING TREE $135.00 35 0 $0.00 35 $4,725.00
58 2101.507 GRUBBING TREE $135.00 35 0 $0.00 35 $4,725.00
59 2104.501
REMOVE
CONCRETE CURB L F $10.00 1840 0 $0.00 2065 $20,650.00
60 2104.501
REMOVE SEWER
PIPE (STORM)L F $16.00 110 0 $0.00 97 $1,552.00
61 2104.503
REMOVE
CONCRETE WALK S F $1.40 28560 0 $0.00 31530.3 $44,142.42
62 2104.505
REMOVE
BITUMINOUS
PAVEMENT
S Y $2.00 5195 0 $0.00 5916 $11,832.00
63 2104.509 REMOVE SIGN EACH $30.00 11 0 $0.00 4 $120.00
64 2104.509
REMOVE
CASTING EACH $80.00 1 0 $0.00 1 $80.00
65 2104.509
REMOVE
CONCRETE
APRON
SQ
YD $16.00 470 0 $0.00 478.8 $7,660.80
66 2104.509
REMOVE
DRAINAGE
STRUCTURE
EACH $500.00 2 0 $0.00 2 $1,000.00
67 2104.511
SAWING
CONCRETE
PAVEMENT (FULL
DEPTH)
L F $5.50 50 0 $0.00 151 $830.50
68 2104.513
SAWING
BITUMINOUS
PAVEMENT (FULL
DEPTH)
L F $3.30 920 0 $0.00 1227.25 $4,049.93
69 2104.523
SALVAGE &
REINSTALL SIGN EACH $160.00 1 0 $0.00 3 $480.00
70 2104.601
REMOVE AND
REPLACE
BITUMINOUS
DRIVEWAY
PAVEMENT
SQ
YD $67.00 110 0 $0.00 39.5 $2,646.50
71 2104.699
REMOVE CURB
PAINT L F $3.00 700 0 $0.00 700 $2,100.00
72 2105.501
COMMON
EXCAVATION (P)C Y $35.00 100 0 $0.00 123.4 $4,319.00
73 2105.507
SUBGRADE
EXCAVATION C Y $35.00 50 0 $0.00 0 $0.00
74 2105.522
SELECT
GRANULAR
BORROW (LV)
C Y $15.00 50 0 $0.00 53.1 $796.50
75 2123.610
STREET
SWEEPER (WITH
PICKUP BROOM)
HOUR $115.00 10 0 $0.00 7 $805.00
76 2211.501
AGGREGATE
BASE CLASS 5 TON $24.00 100 0 $0.00 46.7 $1,120.80
77 2232.501 MILL BITUMINOUS S Y $1.90 9520 0 $0.00 9520 $18,088.00
03199-31 Project Material Status
Line Item Description Units Unit Price
Contract
Quantity
Quantity
This
Pay
Voucher
Amount
This
Pay
Voucher
Quantity
To Date
Amount
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 6
SURFACE (2.0")
78 2357.502
BITUMINOUS
MATERIAL FOR
TACK COAT
GAL $1.55 1050 0 $0.00 645 $999.75
79 2360.501
TYPE SP 9.5
WEARING
COURSE MIX (3,B)
TON $52.80 1120 0 $0.00 1106.5 $58,423.20
80 2360.502
BITUMINOUS
PAVEMENT
PATCHING
S Y $53.80 220 0 $0.00 432.9 $23,290.02
81 2411.601
CONCRETE
STEPS
LUMP
SUM $570.00 1 0 $0.00 1 $570.00
82 2503.541
12" RC PIPE
SEWER DES 3006
CL III
L F $54.50 191 0 $0.00 186 $10,137.00
83 2503.541
15" RC PIPE
SEWER DES 3006
CL III
L F $56.55 151 0 $0.00 145 $8,199.75
84 2503.541
24" RC PIPE
SEWER DES 3006
CL III
L F $74.10 29 0 $0.00 29 $2,148.90
85 2504.602
ADJUST VALVE
BOX EACH $200.00 11 0 $0.00 11 $2,200.00
86 2504.602
VALVE BOX
(SECTION)EACH $105.00 2 0 $0.00 2 $210.00
87 2504.602
CURB BOX
CASTING EACH $270.00 16 0 $0.00 11 $2,970.00
88 2504.602
RELOCATE
HYDRANT &
VALVE
EACH $3,200.00 1 0 $0.00 1 $3,200.00
89 2505.601
UTILITY
COORDINATION LS $1,500.00 1 0 $0.00 1 $1,500.00
90 2506.502
CONSTRUCT
DRAINAGE
STRUCTURE
DESIGN SPECIAL
(2'X3')
EACH $1,900.00 5 0 $0.00 5 $9,500.00
91 2506.501
CONSTRUCT
DRAINAGE
STRUCTURE
DESIGN 48-4020
L F $540.00 5 0 $0.00 5 $2,700.00
92 2506.603
STRUCTURE
INTERIOR
CONCRETE WORK
- RE-GROUT
DOGHOUSES
EACH $250.00 6 0 $0.00 6 $1,500.00
93 2506.603
8" TOP SLAB FOR
60-4020
STRUCTURE
EACH $1,700.00 1 0 $0.00 1 $1,700.00
94 2506.516
CASTING
ASSEMBLY EACH $625.00 1 0 $0.00 3 $1,875.00
03199-31 Project Material Status
Line Item Description Units Unit Price
Contract
Quantity
Quantity
This
Pay
Voucher
Amount
This
Pay
Voucher
Quantity
To Date
Amount
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 7
95 2506.602
CASTING
ASSEMBLY
(MANHOLE)
EACH $600.00 1 0 $0.00 1 $600.00
96 2506.602
CONNECT INTO
EXISTING STORM
SEWER
EACH $485.00 1 0 $0.00 2 $970.00
97 2506.602
CONNECT TO
EXISTING
STRUCTURE
EACH $450.00 6 0 $0.00 7 $3,150.00
98 2506.522
ADJUST FRAME &
RING CASTING EACH $650.00 30 0 $0.00 28 $18,200.00
99 2506.602 CHIMNEY SEAL EACH $250.00 11 0 $0.00 1 $250.00
100 2521.501
6" CONCRETE
WALK S F $11.00 3000 0 $0.00 2466.75 $27,134.25
101 2521.699
CLOCK TOWER
CONCRETE BASE EACH $2,850.00 1 0 $0.00 1 $2,850.00
102 2531.501
CONCRETE CURB
& GUTTER
DESIGN B624
L F $27.65 2040 0 $0.00 2416.5 $66,816.23
103 2531.602
INSTALL
CONCRETE
APRON
SQ
YD $96.50 470 0 $0.00 461.1 $44,496.15
104 2531.618
TRUNCATED
DOMES S F $43.00 296 0 $0.00 408 $17,544.00
105 2531.618
ADA COMPLIANCE
SUPERVISOR LS $2,000.00 1 0 $0.00 1 $2,000.00
106 2531.699
MEMBRANE
CURING
COMPOUND
L F $1.00 1650 0 $0.00 0 $0.00
107 2563.601
TRAFFIC
CONTROL LS $14,000.00 1 0 $0.00 1 $14,000.00
108 2565.602
REMOVE LOOP
DETECTOR EACH $185.00 16 0 $0.00 16 $2,960.00
109 2565.602
LOOP DETECTOR
6'X6'EACH $1,000.00 12 0 $0.00 12 $12,000.00
110 2573.530
STORM DRAIN
INLET
PROTECTION
EACH $100.00 17 0 $0.00 23 $2,300.00
111 2573.533
SEDIMENT
CONTROL LOG
TYPE WOOD
FIBER
L F $5.00 100 0 $0.00 65.84 $329.20
112 2575.505
SODDING, TYPE
LAWN (INCL.
TOPSOIL & FERT.)
S Y $25.00 220 0 $0.00 152.7 $3,817.50
113 2582.501
PAVEMENT
MESSAGE (LEFT
ARROW) PAINT
EACH $75.00 8 0 $0.00 7 $525.00
114 2582.501
PAVEMENT
MESSAGE (RIGHT
EACH $75.00 1 0 $0.00 7 $525.00
03199-31 Project Material Status
Line Item Description Units Unit Price
Contract
Quantity
Quantity
This
Pay
Voucher
Amount
This
Pay
Voucher
Quantity
To Date
Amount
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 8
ARROW) PAINT
115 2582.502
4" SOLID LINE
WHITE-PAINT L F $0.50 1010 0 $0.00 978 $489.00
116 2582.502
4" SOLID LINE
YELLOW-PAINT L F $0.15 2355 0 $0.00 2533 $379.95
117 2582.502
4" DOUBLE SOLID
LINE YELLOW-
PAINT
L F $0.20 170 0 $0.00 194.5 $38.90
118 2582.502
4" BROKEN LINE
YELLOW-PAINT L F $0.10 2355 0 $0.00 690 $69.00
119 2582.502
24" SOLID LINE
WHITE-PAINT L F $2.95 36 0 $0.00 34.5 $101.78
120 2582.503
CROSSWALK
MARKING-PAINT S F $2.45 740 0 $0.00 740 $1,813.00
Totals For Section SCHEDULE B. 207TH ST W. TO 210TH ST W.: $0.00 $528,206.03
SCHEDULE C. STREETSCAPE IMPROVEMENTS 207TH ST W. TO 210TH ST W.
121 2105.607
STRUCTURAL
SOIL BORROW
(CV)
C Y $185.00 615 0 $0.00 594.5 $109,982.50
122 2521.501
4" CONCRETE
WALK SPECIAL S F $4.70 33990 -363.8 ($1,709.86) 33639.7 $158,106.59
123 2540.602 BENCH EACH $2,100.00 9 0 $0.00 9 $18,900.00
124 2540.602
WASTE
RECEPTACLE EACH $2,250.00 9 0 $0.00 9 $20,250.00
125 2540.602 BICYCLE RACK EACH $1,950.00 4 0 $0.00 4 $7,800.00
126 2540.602 PLANTER EACH $195.00 41 0 $0.00 41 $7,995.00
127 2540.602 PLANTER - LARGE EACH $320.00 7 0 $0.00 7 $2,240.00
128 2540.602 BRICK COLUMN EACH $2,900.00 3 0 $0.00 3 $8,700.00
129 2540.602
PRECAST
SEATWALL
PLANTER
EACH $16,400.00 7 0 $0.00 7 $114,800.00
130 2540.602
PRECAST
SEATWALL
PLANTER - LARGE
EACH $28,000.00 1 0 $0.00 1 $28,000.00
131 2540.603
CONCRETE
EDGER L F $44.15 184 0 $0.00 170.3 $7,518.75
132 2540.603 METAL RAILING L F $145.00 18 0 $0.00 18 $2,610.00
133 2571.502
DECIDUOUS TREE
2.5" CAL B&B TREE $675.00 43 0 $0.00 44 $29,700.00
134 2571.502
DECIDUOUS TREE
2" CAL B&B TREE $630.00 14 0 $0.00 14 $8,820.00
135 2571.505
DECIDUOUS
SHRUB NO 5
CONT
SHRB $88.00 73 0 $0.00 73 $6,424.00
136 2571.507
PERENNIAL 1 GAL
CONT PLT $26.50 266 0 $0.00 339 $8,983.50
137 2571.602 TREE GRATE EACH $1,630.00 41 0 $0.00 40.5 $66,015.00
BOULEVARD
03199-31 Project Material Status
Line Item Description Units Unit Price
Contract
Quantity
Quantity
This
Pay
Voucher
Amount
This
Pay
Voucher
Quantity
To Date
Amount
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 9
138 2574.525
TOPSOIL
BORROW C Y $45.00 100 0 $0.00 122 $5,490.00
Totals For Section SCHEDULE C. STREETSCAPE
IMPROVEMENTS 207TH ST W. TO 210TH ST W.:($1,709.86) $612,335.34
SCHEDULE D. 210TH ST W. TO 215TH ST W./CSAH 70
139 2021.501 MOBILIZATION LS $15,000.00 1 0 $0.00 1 $15,000.00
140 2104.501
REMOVE
CONCRETE CURB L F $10.00 110 0 $0.00 66 $660.00
141 2104.503
REMOVE
CONCRETE WALK S F $1.40 100 0 $0.00 164 $229.60
142 2104.509 REMOVE SIGN EACH $30.00 14 0 $0.00 0 $0.00
143 2104.509
REMOVE
CASTING EACH $80.00 1 0 $0.00 0 $0.00
144 2104.511
SAWING
CONCRETE
PAVEMENT (FULL
DEPTH)
L F $5.50 20 0 $0.00 0 $0.00
145 2104.513
SAWING
BITUMINOUS
PAVEMENT (FULL
DEPTH)
L F $3.30 20 0 $0.00 91 $300.30
146 2105.507
SUBGRADE
EXCAVATION C Y $35.00 10 0 $0.00 0 $0.00
147 2105.522
SELECT
GRANULAR
BORROW (LV)
C Y $15.00 10 0 $0.00 0 $0.00
148 2123.610
STREET
SWEEPER (WITH
PICKUP BROOM)
HOUR $115.00 10 0 $0.00 0 $0.00
149 2211.501
AGGREGATE
BASE CLASS 2 TON $45.50 200 0 $0.00 200 $9,100.00
150 2211.501
AGGREGATE
BASE CLASS 5 TON $24.00 10 0 $0.00 0 $0.00
151 2232.501
MILL BITUMINOUS
SURFACE (2.0")S Y $1.65 7900 0 $0.00 7900 $13,035.00
152 2357.502
BITUMINOUS
MATERIAL FOR
TACK COAT
GAL $1.55 870 0 $0.00 525 $813.75
153 2360.501
TYPE SP 9.5
WEARING
COURSE MIX (3,B)
TON $48.60 990 0 $0.00 990 $48,114.00
154 2504.602
ADJUST VALVE
BOX EACH $200.00 1 0 $0.00 0 $0.00
155 2504.602
VALVE BOX
(SECTION)EACH $105.00 1 0 $0.00 0 $0.00
156 2505.601
UTILITY
COORDINATION LS $600.00 1 0 $0.00 1 $600.00
157 2506.516
CASTING
ASSEMBLY EACH $625.00 1 0 $0.00 0 $0.00
03199-31 Project Material Status
Line Item Description Units Unit Price
Contract
Quantity
Quantity
This
Pay
Voucher
Amount
This
Pay
Voucher
Quantity
To Date
Amount
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 10
158 2506.602
ADJUST FRAME &
RING CASTING EACH $652.00 4 0 $0.00 4 $2,608.00
159 2506.602 CHIMNEY SEAL EACH $250.00 1 0 $0.00 0 $0.00
160 2521.501
4" CONCRETE
WALK S F $6.00 100 0 $0.00 81.25 $487.50
161 2531.501
CONCRETE CURB
& GUTTER
DESIGN B618
L F $27.50 110 0 $0.00 15 $412.50
162 2563.601
TRAFFIC
CONTROL LS $14,000.00 1 0 $0.00 1 $14,000.00
163 2573.530
STORM DRAIN
INLET
PROTECTION
EACH $100.00 4 0 $0.00 0 $0.00
164 2573.533
SEDIMENT
CONTROL LOG
TYPE WOOD
FIBER
L F $5.00 100 0 $0.00 0 $0.00
165 2575.560 HYDROMULCH S Y $15.00 25 0 $0.00 56 $840.00
166 2582.501
PAVEMENT
MESSAGE (RIGHT
ARROW) PAINT
EACH $75.00 1 0 $0.00 1 $75.00
167 2582.501
PAVEMENT
MESSAGE (LEFT-
THRU ARROW)
PAINT
EACH $75.00 1 0 $0.00 1 $75.00
168 2582.501
PAVEMENT
MESSAGE (RR
XING) PAINT
EACH $165.00 2 0 $0.00 2 $330.00
169 2582.502
4" SOLID LINE
WHITE-PAINT L F $0.15 4050 0 $0.00 5081 $762.15
170 2582.502
4" DOUBLE SOLID
LINE YELLOW-
PAINT
L F $0.25 2575 0 $0.00 2555 $638.75
171 2582.502
24" SOLID LINE
WHITE-PAINT L F $2.10 46 0 $0.00 46 $96.60
172 2582.503
CROSSWALK
PAINT S F $2.45 432 0 $0.00 430 $1,053.50
Totals For Section SCHEDULE D. 210TH ST W. TO 215TH ST
W./CSAH 70:$0.00 $109,231.65
SCHEDULE E. 210TH ST & HOLYOKE AVE TURN LANE
173 2021.501 MOBILIZATION LS $5,500.00 1 0 $0.00 1 $5,500.00
174 2104.501
REMOVE
CONCRETE CURB L F $10.00 100 0 $0.00 62 $620.00
175 2104.503
REMOVE
CONCRETE WALK S F $1.40 1640 0 $0.00 1521 $2,129.40
176 2104.503
REMOVE
BITUMINOUS
PAVEMENT
S F $0.90 1200 0 $0.00 1782 $1,603.80
SAWING
BITUMINOUS
03199-31 Project Material Status
Line Item Description Units Unit Price
Contract
Quantity
Quantity
This
Pay
Voucher
Amount
This
Pay
Voucher
Quantity
To Date
Amount
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 11
177 2104.513
PAVEMENT (FULL
DEPTH)L F $3.30 275 0 $0.00 239 $788.70
178 2105.501
COMMON
EXCAVATION (P)C Y $35.00 90 0 $0.00 90 $3,150.00
179 2105.507
SUBGRADE
EXCAVATION C Y $35.00 10 0 $0.00 0 $0.00
180 2105.522
SELECT
GRANULAR
BORROW (LV)
C Y $15.00 10 0 $0.00 0 $0.00
181 2211.501
AGGREGATE
BASE CLASS 5 TON $24.00 90 0 $0.00 35 $840.00
182 2357.502
BITUMINOUS
MATERIAL FOR
TACK COAT
GAL $3.30 50 0 $0.00 25 $82.50
183 2360.501
TYPE SP 9.5
WEARING
COURSE MIX (3,B)
TON $110.00 30 0 $0.00 30 $3,300.00
184 2360.502
TYPE SP 12.5 NON
WEAR COURSE
MIX (3,B)
TON $102.00 50 0 $0.00 51.7 $5,273.40
185 2506.602
ADJUST FRAME &
RING CASTING EACH $650.00 1 0 $0.00 0 $0.00
186 2521.501
4" CONCRETE
WALK S F $5.60 1690 0 $0.00 1380.25 $7,729.40
187 2521.501
6" CONCRETE
WALK S F $11.00 150 0 $0.00 150 $1,650.00
188 2531.618
TRUNCATED
DOMES S F $45.00 16 0 $0.00 16 $720.00
189 2531.618
ADA COMPLIANCE
SUPERVISOR LS $120.00 1 0 $0.00 1 $120.00
190 2531.501
CONCRETE CURB
& GUTTER
DESIGN D412
L F $21.00 200 0 $0.00 200 $4,200.00
191 2531.501
CONCRETE CURB
& GUTTER
DESIGN B624
L F $24.00 230 0 $0.00 224 $5,376.00
192 2563.601
TRAFFIC
CONTROL LS $10,000.00 1 0 $0.00 1 $10,000.00
193 2575.523
EROSION
CONTROL
BLANKETS
CATEGORY 3
S Y $4.00 10 0 $0.00 0 $0.00
194 2575.525
TURF
REINFORCEMENT
MAT CATEGORY 2
S Y $25.00 10 0 $0.00 0 $0.00
195 2575.560 HYDROMULCH S Y $15.00 80 0 $0.00 147 $2,205.00
196 2582.501
PAVEMENT
MESSAGE (LEFT
ARROW) PAINT
EACH $75.00 1 0 $0.00 1 $75.00
PAVEMENT
03199-31 Project Material Status
Line Item Description Units Unit Price
Contract
Quantity
Quantity
This
Pay
Voucher
Amount
This
Pay
Voucher
Quantity
To Date
Amount
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 12
197 2582.501
MESSAGE (THRU
ARROW) PAINT EACH $75.00 1 0 $0.00 0 $0.00
198 2582.501
PAVEMENT
MESSAGE (RIGHT-
THRU ARROW)
PAINT
EACH $100.00 1 0 $0.00 1 $100.00
Totals For Section SCHEDULE E. 210TH ST & HOLYOKE AVE
TURN LANE:$0.00 $55,463.20
SCHEDULE F. GATEWAY SIGNAGE IMPROVEMENTS
199 2540.602
CITY HALL
MONUMENT SIGN L S $83,000.00 1 0 $0.00 1 $83,000.00
200 2540.602
DOWNTOWN
WAYFINDING
MONUMENT SIGN
L S $44,000.00 1 0 $0.00 1 $44,000.00
201 2571.602
EVERGREEN
SHRUB NO. 5
CONT
EACH $95.00 22 0 $0.00 22 $2,090.00
202 2571.507
PERENNIAL 1 GAL
CONT PLT $27.00 36 0 $0.00 36 $972.00
203 2574.525
BOULEVARD
TOPSOIL
BORROW
C Y $45.00 20 0 $0.00 20 $900.00
204 2540.603
LANDSCAPE
EDGER STEEL L F $14.00 160 0 $0.00 160 $2,240.00
205 2540.602 DOWNTOWN SIGN EACH $4,300.00 2 0 $0.00 2 $8,600.00
206 2540.602 BRICK COLUMN EACH $2,900.00 10 0 $0.00 10 $29,000.00
207 2540.603 METAL RAILING L F $142.00 72 0 $0.00 72 $10,224.00
Totals For Section SCHEDULE F. GATEWAY SIGNAGE
IMPROVEMENTS:$0.00 $181,026.00
SCHEDULE G. MARKET PLAZA SIDEWALK IMPROVEMENTS
208 2021.501 MOBILIZATION LS $5,800.00 1 0 $0.00 1 $5,800.00
209 2101.502 CLEARING TREE $135.00 5 0 $0.00 5 $675.00
210 2101.507 GRUBBING TREE $135.00 5 0 $0.00 5 $675.00
211 2104.503
REMOVE
CONCRETE WALK S F $1.40 2340 0 $0.00 2270.3 $3,178.42
212 2521.501
7" CONCRETE
WALK S F $9.00 2340 0 $0.00 2270.3 $20,432.70
213 2531.618
TRUNCATED
DOMES S F $45.00 8 0 $0.00 8 $360.00
214 2531.618
ADA COMPLIANCE
SUPERVISOR LS $100.00 1 0 $0.00 1 $100.00
Totals For Section SCHEDULE G. MARKET PLAZA SIDEWALK
IMPROVEMENTS:$0.00 $31,221.12
SCHEDULE H. LAKEVILLE AREA ARTS CENTER
215 2021.501 MOBILIZATION LS $8,000.00 1 0 $0.00 1 $8,000.00
216 2101.511
CLEARING AND
GRUBBING -
SHRUB
EACH $110.00 5 0 $0.00 0 $0.00
03199-31 Project Material Status
Line Item Description Units Unit Price
Contract
Quantity
Quantity
This
Pay
Voucher
Amount
This
Pay
Voucher
Quantity
To Date
Amount
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 13
217 2104.501
REMOVE
CONCRETE CURB L F $10.00 150 0 $0.00 237.5 $2,375.00
218 2104.503
REMOVE
CONCRETE WALK S F $1.40 1250 0 $0.00 1250 $1,750.00
219 2104.503
REMOVE
BITUMINOUS
PAVEMENT
S F $1.00 500 0 $0.00 525 $525.00
220 2104.513
SAWING
BITUMINOUS
PAVEMENT (FULL
DEPTH)
L F $3.30 160 0 $0.00 160 $528.00
221 2215.501
FULL DEPTH
RECLAMATION S Y $11.00 800 0 $0.00 800 $8,800.00
222 2357.502
BITUMINOUS
MATERIAL FOR
TACK COAT
GAL $3.30 50 0 $0.00 0 $0.00
223 2360.501
TYPE SP 9.5
WEARING
COURSE MIX (2,C)
TON $82.50 80 0 $0.00 117.24 $9,672.30
224 2360.502
TYPE SP 12.5 NON
WEAR COURSE
MIX (2,C)
TON $121.00 80 0 $0.00 105 $12,705.00
225 2521.501
5" CONCRETE
WALK S F $5.50 1250 0 $0.00 1190 $6,545.00
226 2531.618
TRUNCATED
DOMES S F $45.00 8 0 $0.00 0 $0.00
227 2503.541
12" RC PIPE
SEWER DES 3006
CL III
L F $51.50 214 0 $0.00 214 $11,021.00
228 2503.541
15" RC PIPE
SEWER DES 3006
CL III
L F $53.50 98 0 $0.00 98 $5,243.00
229 2506.602
CONNECT TO
EXISTING
STRUCTURE
EACH $585.00 1 0 $0.00 1 $585.00
230 2506.501
CONSTRUCT
DRAINAGE
STRUCTURE
DESIGN 48-4020
L F $625.00 8 0 $0.00 8 $5,000.00
231 2506.502
CONSTRUCT
DRAINAGE
STRUCTURE
DESIGN H
EACH $1,175.00 2 0 $0.00 2 $2,350.00
232 2531.501
CONCRETE CURB
& GUTTER
DESIGN B612
L F $23.10 90 0 $0.00 83.5 $1,928.85
233 2531.501
CONCRETE CURB
& GUTTER
DESIGN B618
L F $25.00 150 0 $0.00 150 $3,750.00
234 2531.602
INSTALL
CONCRETE
SQ
YD $98.00 20 0 $0.00 17.5 $1,715.00
03199-31 Project Material Status
Line Item Description Units Unit Price
Contract
Quantity
Quantity
This
Pay
Voucher
Amount
This
Pay
Voucher
Quantity
To Date
Amount
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 14
APRON
235 2573.530
STORM DRAIN
INLET
PROTECTION
EACH $100.00 6 0 $0.00 0 $0.00
236 2575.505
SODDING, TYPE
LAWN (INCL.
TOPSOIL & FERT.)
S Y $25.00 80 0 $0.00 206.6 $5,165.00
237 2582.501
PAVEMENT
MESSAGE
(HANDICAPPED
SYMBOL) PAINT
EACH $55.00 4 0 $0.00 4 $220.00
238 2582.502
4" SOLID LINE
WHITE-PAINT L F $0.20 1150 0 $0.00 1150 $230.00
Totals For Section SCHEDULE H. LAKEVILLE AREA ARTS
CENTER:$0.00 $88,108.15
SCHEDULE I. ELECTRICAL IMPROVEMENTS
239 2545.523
1" NON-METALLIC
CONDUIT L F $4.30 150 300 $1,290.00 450 $1,935.00
240 2545.523
1" NON-METALLIC
COND
(DIRECTIONAL
BORE)
L F $14.20 210 85 $1,207.00 295 $4,189.00
241 2545.523
2" NON-METALLIC
CONDUIT L F $5.40 1020 165 $891.00 1185 $6,399.00
242 2545.523
2" NON-METALLIC
COND
(DIRECTIONAL
BORE)
L F $15.50 360 220 $3,410.00 580 $8,990.00
243 2545.531 #10 AWG CU L F $0.90 1100 0 $0.00 1100 $990.00
244 2545.531 #6 AWG CU L F $1.35 1475 0 $0.00 1475 $1,991.25
245 2545.531 #3/0 AWG CU L F $5.40 225 21 $113.40 246 $1,328.40
246 2545.553 HANDHOLE EACH $808.00 10 2 $1,616.00 14 $11,312.00
247 2545.601
FEEDPOINT TYPE
T1 EACH $6,225.00 2 0 $0.00 2 $12,450.00
248 2545.601
FEEDPOINT TYPE
T2 EACH $6,060.00 1 0 $0.00 1 $6,060.00
249 2545.601
FEEDPOINT TYPE
T3 EACH $15,750.00 1 0 $0.00 1 $15,750.00
250 2545.602
GRADE-MOUNT
RECEPTACLE EACH $1,535.00 8 0 $0.00 8 $12,280.00
Totals For Section SCHEDULE I. ELECTRICAL IMPROVEMENTS: $8,527.40 $83,674.65
Change Order 1
251 99945
WORK REQUEST
CHANGES LS $1,861.96 1 0 $0.00 1 $1,861.96
Totals For Change Order 1: $0.00 $1,861.96
Change Order 2
252 99945
WORK REQUEST
CHANGES LS $2,662.00 1 0 $0.00 1 $2,662.00
03199-31 Project Material Status
Line Item Description Units Unit Price
Contract
Quantity
Quantity
This
Pay
Voucher
Amount
This
Pay
Voucher
Quantity
To Date
Amount
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 15
Totals For Change Order 2: $0.00 $2,662.00
Change Order 3
253 99945
WORK REQUEST
CHANGES LS $786.50 1 0 $0.00 1 $786.50
Totals For Change Order 3: $0.00 $786.50
Change Order 4
254 99945
WORK REQUEST
CHANGES LS $9,298.80 1 1 $9,298.80 1 $9,298.80
Totals For Change Order 4: $9,298.80 $9,298.80
Project Totals: $17,200.94 $1,963,893.04
03199-31 Project Material Status
Line Item Description Units Unit Price
Contract
Quantity
Quantity
This
Pay
Voucher
Amount
This
Pay
Voucher
Quantity
To Date
Amount
To Date
CO1 Change
Order 10/31/2017
Work Request No. 1 - 200 SY geo fabric at Art Center parking lot
Work Request No. 2 - Additional pipe storm sewer Dakota County
building across from the Dairy Delite Work Request No. 3 -
Design adjustment for planter on private property in front of
Toppers Pizza. 6 hrs. laborer and .5 hrs. foreman time
$1,861.96 $1,861.96
CO2 Change
Order 12/31/2017 Work Request No. 4 - Winter service from Simon Brick and Stone
Co.$2,662.00 $2,662.00
CO3 Change
Order 12/31/2017 Work Request No. 5 - Additional double yellow striping at 207th
Street West $786.50 $786.50
CO4 Change
Order 10/25/2018
Work Request No. 6 - 3" PVC/KCMIL wire Work Request No. 7 -
Added service and disconnect for signage at Holyoke and 202nd
St N
$9,298.80 $9,298.80
Contract Change Totals: $14,609.26 $14,609.26
03199-31 Contract Changes
No. Type Date Explanation
Estimated
Amount
Amount
Paid
To Date
CITY OF LAKEVILLE
20195 Holyoke Avenue
Lakeville, MN 55044-8339
Project No. 03199-31
Final Pay Voucher No. 10
Page 16