HomeMy WebLinkAboutItem 06.f
Date: Item No.
KENWOOD HILLS 3RD ADDITION FINAL PLAT
Proposed Action
Staff recommends adoption of the following motion: Move to approve a resolution approving the
Kenwood Hills 3rd Addition final plat.
Overview
Homestead Partners representatives are requesting approval of the Kenwood Hills 3rd Addition final plat
of 15 detached townhome lots, two common area HOA lots, and three outlots on property located west of
Kenwood Trail (CSAH 50) at Jaguar Path. Kenwood Hills 3rd Addition is south and east of the initial
Kenwood Hills development of 45 detached townhome lots and includes the extension of Jurel Way to
intersect with Kenwood Trail at Jaguar Avenue. The Kenwood Hills 3rd Addition preliminary plat,
easement vacation, Comp. Plan amendment and PUD rezoning was approved by the City Council at their
September 4, 2018 meeting. The final plat is consistent with the approved preliminary plat.
The developer will deed Outlots A and B, which contain wetlands and a stormwater basin, to the City.
The City will convey a portion of Outlot B, Lakeway Park East Campus to the developer primarily for the
extension of Jurel Way; however, portions of the conveyance will be included in detached townhome unit
lots. This conveyance by the City to the developer will be at no cost to the developer; however, the City
will not reimburse the developer for conveying Outlots A and B to the City. In addition, the City will
grant a right of entry for the developer to access the portion of Outlot B, Lakeway Park East Campus not
being conveyed to the developer for grading and utility construction associated with the development of
the plat.
Primary Issues to Consider
None
Supporting Information
• Final plat resolution
• Signed development contract
• November 28, 2018 planning report and November 16, 2018 engineering report
Financial Impact: $ Budgeted: Y☐ N☐ Source:
Related Documents: (CIP, ERP, etc.):
Envision Lakeville Community Values: A Home for All Ages and Stages of Life
Report Completed by: Daryl Morey, Planning Director
December 3, 2018
Zoning and Subdivision Ordinances, Kenwood Hills PUD
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. __________
RESOLUTION APPROVING THE FINAL PLAT OF KENWOOD HILLS 3RD ADDITION
WHEREAS, the owner of the plat described as Kenwood Hills 3rd Addition has
requested final plat approval; and
WHEREAS, the preliminary plat was reviewed by the Planning Commission and
the Parks, Recreation and Natural Resources Committee and recommended for
approval; and
WHEREAS, the final plat is consistent with the approved preliminary plat; and
WHEREAS, the final plat is acceptable to the City.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The final plat of Kenwood Hills 3rd Addition is hereby approved subject to the
development contract, security requirements, and the Kenwood Hills PUD
ordinance as may be amended.
2. The Mayor and City Clerk are hereby directed to sign the final plat mylars,
development contract, quit claim deed, and right of entry agreement.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
ADOPTED by the Lakeville City Council this 3rd day of December 2018
CITY OF LAKEVILLE
BY: _______________________
Douglas P. Anderson, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 3rd day of December 2018, as shown by the
minutes of said meeting in my possession.
________________________
Charlene Friedges, City Clerk
(SEAL)
3601 Thurston Avenue
Anoka, MN 55303
763.231.5840
TPC@PlanningCo.com
1
PLANNING REPORT
TO: Daryl Morey
FROM: D. Daniel Licht, AICP
DATE: 28 November 2018
RE: Lakeville – Kenwood Hills; 3rd Addition Final Plat
TPC FILE: 135.01
BACKGROUND
Homestead Partners (a/k/a HP Holdings, LLC) has submitted a final plat for development of
Kenwood Hills 3rd Addition. The proposed development is located south of the Kenwood Hills
preliminary plat of 45 detached townhouse units approved by the City Council on 1 December
2014 and west of Kenwood Trail (CSAH 50) at Jaguar Path. The proposed 3rd Addition extends
Jurel Way south to intersect Kenwood Trail (CSAH 50) and will plat 15 detached townhouse
dwelling units. The City Council previously approved a Comprehensive Plan amendment to
change the land use designation on the 2030 Land Use Plan to low/medium density residential,
a Zoning Map amendment to rezone the subject site to PUD, Planned Unit Development
District, and a PUD Development Stage Plan and preliminary plat on 4 September 2018.
Exhibits:
A. Location Map
B. Final Plat (2 pages)
C. Final Street & Utility Construction Plan Cover Sheet
D. Landscape Plan (2 pages)
ANALYSIS
Subject Site. The subject site consists of an undeveloped 10.08 acre parcel abutting Kenwood
Trail (CSAH 50) as well as land the developer will acquire from the City at the existing terminus
of Jurel Way. There are severe physical constraints in the form of steep slopes, wetlands, and a
pipeline easement that limit the buildable area of the subject site. The need to extend Jurel
Way from its current terminus within the initial Kenwood Hills development to Kenwood Trail
(CSAH 50) further restricts the area of the subject site available for development. The transfer
2
of property from the City owned parcel to the subject site will occur by administrative
subdivision prior to recording of the proposed final plat.
Surrounding Land Uses. The subject site is surrounded by the following existing and planned
land uses shown in the table below. The proposed land use will be compatible with existing
and planned land uses surrounding the subject site.
Direction Land Use Plan Zoning Map Existing Use
North L/MD Residential
Restricted Development
PUD District
POS District
Detached Townhomes
City stormwater basin
East -- -- Kenwood Trail (CSAH 50)
South Public/Quasi Public RM-1 District LDS Church
West Restricted Development
Commercial
POS District
PUD District
Wetland
CP Rail ROW
TimberCrest
Comprehensive Plan. The 2030 Land Use Plan guides the subject site for low-to-medium
density residential land uses. The low-to-medium density residential land use designation
allows for development of detached townhouses as a reasonable use of the property within the
constraints of the existing natural conditions of the site and extension of Jurel Way. The
proposed development is consistent with the policies of the Comprehensive Plan.
Density. The gross area of the subject site is 10.81 acres. With 15 single family dwelling units
proposed as detached townhouses, the gross density of the development is 1.4 dwelling units
per acre. The area of Outlots A and B and the right-of-way for Kenwood Trail (CSAH 50) is to be
excluded from the area of the subject site for the purposes of calculating net density. The net
area of the subject site less these Outlots and ROW is 4.37 acres and resulting net density is
3.43 dwelling units per acre. The proposed density is consistent with the intensity of
development allowed within areas guided for Low-to-Medium Density Residential land uses.
Zoning. The subject site is zoned PUD, Planned Unit Development District with the same uses
allowed within the RST-2 District, consistent with the initial Kenwood Hills development. The
development of the subject site under a PUD District allows for certain flexibility in the
application of lot requirements and subdivision design standards. The proposed detached
townhouse final plat is a permitted use within the PUD District and is consistent with the
approved PUD Development Stage Plan.
Lot Requirements. Section 11-57-13.B.2 of the Zoning Ordinance establishes the maximum
development density for detached townhouses by requiring a minimum of 7,500 square feet of
lot area per dwelling unit. The lot area per unit within the two base lots included in the final
plat each exceed the minimum lot area requirement of 7,500 square feet per dwelling unit.
Setbacks. The PUD District for Kenwood Hills 3rd Addition establishes the setbacks applicable to
the final plat as shown in the table below. The setbacks within the PUD District are based on
3
the requirements of the RST-2 District and modified due to the physical constraints of the
subject site that limit building locations or would require extensive grading and tree removal to
overcome. The proposed final plat provides for development of the 15 detached townhouses
in compliance with these setbacks and consistent with the PUD Development Stage Plan and
preliminary plat.
Yard Minimum
Setback
PUD District Perimeter 10ft.
Kenwood Tr. (CSAH 50) 30ft.
Jurel Way 25ft.
Between Bldgs. 10ft.
Wetland Buffer 10ft.
Landscaping. The application for PUD Development Stage Plan includes a landscape plan
illustrating buffer yard landscaping adjacent to Kenwood Trail (CSAH 50) as required by Section
11-21-9.E of the Zoning Ordinance. The landscape plan proposes berming and buffer yard
plantings to screen the detached townhomes from Kenwood Trail (CSAH 50). The quantities
and types of plantings are appropriate for the required buffer yard. The landscaping along Jurel
Way and at the foundation of the detached townhouse dwellings is subject to the minimum
value requirements of Section 11-57-19.I of the Zoning Ordinance.
Streets. The final plat includes construction of a public street extending Jurel Way from its
current terminus within Kenwood Hills 2nd Addition to Kenwood Trail (CSAH 50). The
Transportation Plan designates Jurel Way as a minor collector roadway. The proposed right-of-
way shown on the preliminary plat is 60 feet in width. The roadway is 32 feet wide and there is
a sidewalk on the north side of the street extending from Kenwood Hills 2nd Addition to the
existing trail on Kenwood Trail (CSAH 50). The proposed street is consistent with the section
design for Jurel Way within Kenwood Hills 2nd Addition. All street construction plans are subject
to review and approval by the City Engineer and the Dakota County Plat Commission.
Park Dedication. The 2015 Parks, Trails, and Open Space Plan does not identify acquisition of
land from the subject site for public park facilities. Park dedication requirements as established
by Section 10-4-8 of the Subdivision Ordinance are to be satisfied as a cash fee in lieu of land.
The cash fee is to be paid on a per lot basis in accordance with the current fee schedule as
shown below:
15 lots x $4,090 (low density) = $61,350 cash fee in lieu of land dedication.
Easements. The final plat indicates that drainage and utility easements are to be dedicated
over all of Lot 10, Block 1 and Lot 7, Block 2 that encompass common open space outside of the
detached townhouse unit lots. Drainage and utility easements are also to be dedicated over all
of Outlots A, B, and C that include stormwater basins, wetlands, and wetland buffers. The
4
proposed drainage and utility easements comply with Section 10-4-4 of the Subdivision
Ordinance.
Grading Plan. The developer submitted a grading plan with the application for PUD
Development Stage Plan and preliminary plat approval. Existing wetlands, required wetland
buffers, and proposed stormwater basins are to be platted within Outlots A and B. Outlots A
and B will be deeded to the City for long-term management. All grading, drainage, and erosion
control issues are subject to review and approval by the City Engineer.
Utility Plan. The developer has submitted final construction plans for streets and utilities with
the application for final plat approval. The developer has also submitted cost estimates for the
proposed public improvements. All utility issues are subject to review and approval by the City
Engineer.
Homeowners Association. The development of the proposed detached townhomes with
commonly owned base lots will require establishment of a homeowners association to own and
maintain Lot 10, Block 1 and Lot 7, Block 2. Documents establishing a homeowners association
(or expanding the existing Kenwood Hills homeowners addition to include Kenwood Hills 3rd
Addition) must be submitted with application for final plat approval. The homeowners
association documents are subject to review and approval of the City Attorney.
Development Contract. The developer is must enter into a development contract with the City
for the public and required private improvements, payment of applicable fees and posting of
required securities. The development agreement will be drafted by the City Attorney and the
developer is required to execute the development agreement prior to City Council approval of
the final plat.
CONCLUSION
The Kenwood Hills 3rd Addition Final Plat complies with the requirements of the Comprehensive
Plan, Zoning Ordinance (including the PUD District), and Subdivision Ordinance. The proposed
final plat is also consistent with the approved PUD Development Stage Plan and preliminary
plat. Our office and City staff recommends approval of the final plat subject to the following
conditions:
1. The final plat shall be developed in accordance with the following setbacks:
Yard Minimum
Setback
PUD District Perimeter 10ft.
Kenwood Tr. (CSAH 50) 30ft.
Jurel Way 25ft.
Between Bldgs. 10ft.
Wetland Buffer 10ft.
5
2. The landscaping along Jurel Way and at the foundation of the detached townhouse
dwellings shall comply with the minimum value requirements of Section 11-57-19.I of
the Zoning Ordinance.
3. All street design and construction plans shall be subject to review and approval by the
City Engineer.
4. Park dedication requirements as established by Section 10-4-8 of the Subdivision
Ordinance shall be satisfied as a cash fee in lieu of land in accordance with the fee
schedule as set forth by the development agreement.
5. All drainage and utility easements shall comply with Section 10-4-4 of the Subdivision
Ordinance and are subject to review and approval of the City Engineer.
6. Outlots A and B shall be deeded to the City for wetland and stormwater management
purposes.
7. All grading, drainage, and erosion control issues shall be subject to review and approval
by the City Engineer.
8. All utility issues shall be subject to review and approval of the City Engineer.
9. Documents establishing a homeowners association for ownership and maintenance of
Lot 10, Block 1 and Lot 7, Block 2 shall be subject to review and approval by the City
Attorney.
10. The developer shall execute a development agreement with the City prior to City
Council approval of the final plat, subject to review and approval of the City Attorney.
c. Justin Miller, City Administrator
Alex Jordan, Assistant City Engineer
John Hennen, Parks and Recreation Director
Andrea McDowell-Poelher, City Attorney
Dakota County GIS
±KENWOODTRL(CSAH50)JURELWAYJARL CT
J A G U A RPATH185T H ST (CSAH 60)
City of L akeville
Kenwood Hills
3rd Addition
Site Location
City of Lakeville
Public Works– Engineering Division
Memorandum
To: Daryl Morey, Planning Director
From: Christina Orlowsky, Civil Engineer
McKenzie Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Date: November 16, 2018
Subject: Kenwood Hills 3rd Addition
• Final Plat Review
• Final Grading Plan Review
• Final Utility Plan Review
• Final Erosion Control Plan Review
BBAACCKKGGRROOUUNNDD
Homestead Partners (AKA HP Holdings, LLC) has submitted a final plat named Kenwood Hills
3rd Addition. The proposed development is located west of and adjacent to Kenwood Trail
(CSAH 50), north of 185th Street (CSAH 60), and south of and adjacent to Jurel Way. The parent
parcels consist of a portion of Outlot B, Lakeway Park East Campus and a metes and bounds
parcel (PID No. 220130002020). The property was re-zoned from RH-1, High Density
Residential to PUD, Planned Unit Development with the preliminary plat. The Developer is
dedicating 2.16 acres as County right-of-way (CSAH 50).
The final plat consists of 15 detached townhome lots, two (2) common open space lots, within
two (2) blocks and three (3) outlots. The outlots created with the final plat will have the
following uses:
Outlot A: Wetland and buffers; to be deeded to the City (1.60 acres)
Outlot B: Stormwater management basin, wetlands and buffers; to be deeded to the City
(2.69 acres)
Outlot C: Retained by Developer. To be owned and maintained by the HOA (0.53 acres)
KKEENNWWOOOODD HHIILLLLSS 33RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
NNOOVVEEMMBBEERR 1166,, 22001188
PPAAGGEE 22
The proposed development will be completed by:
Developer: Homestead Partners
Engineer/Surveyor: Pioneer Engineering
SSIITTEE CCOONNDDIITTIIOONNSS
The parent parcels consist of undeveloped land. There are delineated wetlands primarily
located in the northern and southern areas of the site. The land generally slopes downward
in all directions away from the high points located near the center of the parcel with
moderate to steep slopes. Large clusters of trees are scattered throughout the site.
EEAASSEEMMEENNTTSS
The parent parcels contain existing public and private easements. The following easements
will remain with the development and will not be impacted:
• Public drainage and utility easement per Dakota County Right of Way Map No. 153.
• Highway Easement per Doc. No. 1268800
• Highway Right of Way per Dakota County Road Right of Way Map No. 385
• Pipeline Easement per Doc. No. 786184
The following easement will expire with the final plat:
• Temporary turnaround easement per Doc. No. 746109
The following easement will be vacated (and be re-dedicated as necessary) with the final plat:
• Drainage and utility easement per Kenwood Hills 2nd Addition plat.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
Jurel Way
Development of Kenwood Hills 3rd Addition includes the construction and extension of Jurel
Way, a minor collector roadway as identified in the City’s Transportation Plan. As a result of
the proposed reduction in the land use density of the site and in consideration of the
surrounding environmentally sensitive areas, Jurel Way is being designed as a 32-foot wide,
two-lane urban street. A 5-foot wide concrete sidewalk will extend from the termini of the
existing sidewalk along the north side of existing Jurel Way through the Kenwood Hills 3rd
Addition subdivision connecting to CSAH 50. The Developer is dedicating the necessary
right-of-way.
The Developer shall remove the existing temporary cul-de-sac along Jurel Way and restore
the easement area with the final plat improvements. The Developer will receive a credit of
KKEENNWWOOOODD HHIILLLLSS 33RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
NNOOVVEEMMBBEERR 1166,, 22001188
PPAAGGEE 33
$2,000.00 to remove the existing temporary cul-de-sac along Jurel Way and restore the
easement area, to be applied to the final plat cash fees.
Kenwood Trail (CSAH 50)
Kenwood Hills 3rd Addition is located west of and adjacent to Kenwood Trail. Jurel Way will be
constructed providing a full access to Kenwood Trail. Kenwood Trail adjacent to the site is a
four-lane divided urban roadway, with a continuous concrete center median island. Dakota
County controls the right-of-way requirements and access locations along Kenwood Trail. The
current Dakota County Plat Review Needs Map indicates a half right-of-way requirement of 75-
feet and designates this roadway as a four-lane divided urban roadway over its entire length
adjacent to the plat. The final plat was reviewed and recommended for approval by the Dakota
County Plat Commission at their October 30, 2018 meeting. The Developer must complete all
improvements as stipulated by Dakota County along Kenwood Trail.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and street construction for Kenwood
Hills 3rd Addition shall be from a single rock construction entrance on Kenwood Trail at Jurel
Way.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
Development of Kenwood Hills 3rd Addition includes the construction of a public sidewalk. A
5-foot wide concrete sidewalk will be constructed along the north side of Jurel Way.
The Park Dedication Fee has not been collected on the parent parcels and will be satisfied
through a cash contribution that shall be paid with the final plat, calculated as follows.
15 lots x $4,090.00/unit = $61,350.00
Total Lots in Kenwood Hills 3rd Addition Low Density
Park Dedication Rate Total
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR::
Kenwood Hills 3rd Addition is located within subdistrict OL-56110 of the Orchard Lake sanitary
sewer district. Wastewater will be conveyed via existing public sanitary sewer to the MCES
Lakeville/Farmington Interceptor and continue to the Empire Wastewater Treatment Facility.
The existing City-owned downstream facilities have sufficient capacity to serve the residential
development.
Development of Kenwood Hills 3rd Addition includes public sanitary sewer construction. 8- inch
sanitary sewer will be extended within the subdivision from existing sanitary sewer within Jurel
KKEENNWWOOOODD HHIILLLLSS 33RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
NNOOVVEEMMBBEERR 1166,, 22001188
PPAAGGEE 44
Way and existing sanitary sewer within Kenwood Trail. The Sanitary Sewer Availability Charge
was previously assessed to the parent parcel and has been paid.
In 1999, an assessment was paid for the sanitary sewer service and 100-feet of the sanitary
sewer within the Kenwood Trail right-of-way adjacent to Kenwood Hills 3rd Addition. The
Lateral Sanitary Sewer Access Charge is due for the portion of 8-inch sanitary sewer within
Kenwood Trail right-of-way adjacent to the development less 100-feet that was previously
assessed and shall be paid with the final plat. The Lateral Sanitary Sewer Access Charge will be
calculated as follows:
616.00 x $41.50/Front Foot = $25,564
Front Footage along
Kenwood Trail
Lateral Sanitary Sewer Access Charge
Total
WWAATTEERRMMAAIINN::
Development of Kenwood Hills 3rd Addition includes public watermain construction. 12-inch
watermain will be extended within the subdivision from an existing stub within Jurel Way,
consistent with the City’s Water Plan. The Developer shall extend the watermain to the
existing distribution within Kenwood Trail to provide a looped system.
In 1999, an assessment was paid for the watermain service and 100-feet of the watermain
within the Kenwood Trail right-of-way adjacent to Kenwood Hills 3rd Addition. The Lateral
Watermain Access Charge is due for the portion of 20-inch watermain within Kenwood Trail
right-of-way adjacent to the development less 100-feet that was previously assessed and shall
be paid with the final plat. Lateral Watermain Access Charge will be calculated as follows:
882.19 x $41.00/Front Foot = $36,169.79
Front Footage along
Kenwood Trail
Lateral Watermain Access Charge
Total
Final locations and sizes of all public sanitary sewer and watermain facilities will be reviewed
by City staff with the final construction plans.
OOVVEERRHHEEAADD LLIINNEESS
There are no existing overhead utility lines and/or poles within the parent parcels.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
Kenwood Hills 3rd Addition lies within the ML-42 of the Lake Marion Stormwater District, as
identified in the City’s Water Resources Management Plan.
Development of Kenwood Hills 3rd Addition includes the construction of a City owned and
maintained stormwater management basin to collect and treat the stormwater runoff generated
KKEENNWWOOOODD HHIILLLLSS 33RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
NNOOVVEEMMBBEERR 1166,, 22001188
PPAAGGEE 55
from the site. The stormwater management basin will provide water quality treatment and rate
control of the stormwater runoff generated within the subdivision.
The final grading plan must identify all fill lots in which the building footings will be placed on
fill material. The grading specifications must indicate that all embankments meet FHA/HUD
79G specifications. The Developer shall certify to the City that all lots with building footings
placed on fill material are appropriately constructed. Building permits will not be issued until
a soils report and an as-built certified grading plan have been submitted and approved by
City staff.
A National Pollution Discharge Elimination System General Stormwater Permit for
construction activity is required by the Minnesota Pollution Control Agency for areas
exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit
Coverage must be submitted to the City upon receipt from the MPCA.
SSTTOORRMM SSEEWWEERR
Development of Kenwood Hills 3rd Addition includes the construction of a public storm sewer
system. Storm sewer will be installed to collect and convey stormwater runoff generated from
the streets and open space within the development to the stormwater basin on Outlot B.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcels and shall be
paid with the final plat, calculated as follows.
Gross Area of Kenwood Hills 3rd Addition 471,004 s.f.
Less Area of Outlot A (Wetland and Buffers) (-) 69,548 s.f.
Less Area of Outlot B (Stormwater Management Basin) (-) 117,033 s.f.
Less Area of Outlot C (Retained by Developer) (-) 23,042 s.f.
Less Area of Kenwood Trail (CSAH 50) Right-of-Way (-) 94,283 s.f.
Total = 167,098 s.f.
167,098 s.f. x $0.178/s.f. = $29,743.44
Net Area of Kenwood Hills 3rd Addition Single Family
Area Charge
Total Trunk
Storm Sewer Area Charge
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
RREETTAAIINNIINNGG WWAALLLLSS
Development of Kenwood Hills 3rd Addition includes the construction of retaining walls to
facilitate the proposed grading. The retaining walls shall be privately owned and maintained
and must be located outside of City property and right-of-way.
KKEENNWWOOOODD HHIILLLLSS 33RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
NNOOVVEEMMBBEERR 1166,, 22001188
PPAAGGEE 66
FFEEMMAA FFLLOOOODDPPLLAAIINN AANNAALLYYSSIISS
Kenwood Hills 3rd Addition is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the
Federal Emergency Management Agency (FEMA). Based on this designation, there are no
areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA.
WWEETTLLAANNDDSS
The wetland delineation for this site was completed by Midwest Natural Resources. The site
was reviewed in the field by City staff. The delineated boundaries as presented in the wetland
delineation report dated October 10, 2017 and May 11, 2018 are accurate and acceptable for
use in implementing the Wetland Conservation Act. The current plan does not propose any
impacts to wetlands. All wetlands and buffers will be placed in City owned outlots.
Natural Area signs will be used to delineate the City owned wetlands and wetland buffer
areas from the lots and shall be installed by the Developer. Final locations of the Natural Area
signs will be determined in the field prior to installation (13 sign locations).
TTRREEEE PPRREESSEERRVVAATTIIOONN
A tree preservation plan was submitted for the site identifying the trees that will be removed
for the construction of the project. Any trees that are removed outside of the construction
limits will require a 2:1 replacement.
Development of Kenwood Hills 3rd Addition includes removal of significant trees on City
property outside of the plat boundary. The tree removal is necessary for stormwater
conveyance and lot grading for the subdivision. The Developer shall replace the trees
removed on the City property at a 2:1 ratio. The tree species and locations will be determined
by City staff prior to City Council consideration of the final plat. The developer is responsible
for the restoration and establishment of the trees and native vegetation within Outlot A and
B. The Developer will provide a security of $27,200 for tree mitigation.
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing and maintaining the SWPPP throughout construction phase. The permit requires
that all erosion and sediment BMPS be clearly outlined in a site’s SWPPP. Changes made
throughout construction should be documented in the SWPPP.
KKEENNWWOOOODD HHIILLLLSS 33RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
NNOOVVEEMMBBEERR 1166,, 22001188
PPAAGGEE 77
Additional erosion control measures may be required during construction as deemed
necessary by City staff or the Dakota County Soil and Water District. Any additional measures
required shall be installed and maintained by the developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Kenwood Hills 3rd Addition. Construction costs are based upon
estimates submitted by the Developer’s engineer on September 14, 2018.
CONSTRUCTION COSTS
Sanitary Sewer $ 65,251.00
Watermain 72,885.00
Storm Sewer 67,495.00
Street Construction 197,192.25
Erosion Control and Restoration 50,000.00
SUBTOTAL - CONSTRUCTION COSTS $ 452,823.25
SUBTOTAL - CONSTRUCTION COSTS REQUIRED $ 452,823.25
OTHER COSTS
Developer’s Design (3.0%) $ 13,584.70
Developer’s Construction Survey (2.5%) 11,320.58
City’s Legal Expense (0.5%) 2,264.12
City Construction Observation (5.0%) 22,641.16
Developer’s Record Drawing (0.5%) 2,264.12
Landscaping 38,400.00
Natural Area signs 1,950.00
Street Lights 3,800.00
Lot Corners/Iron Monuments 2,000.00
SUBTOTAL - OTHER COSTS $98,224.68
TOTAL PROJECT SECURITY $ 551,047.93
The street light security totals $3,800 which consists of one (1) mast-arm street light at $1,400
each and two (2) post-top street lights at $1,200 each.
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$2,000.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction.
KKEENNWWOOOODD HHIILLLLSS 33RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
NNOOVVEEMMBBEERR 1166,, 22001188
PPAAGGEE 88
CASH FEES
A cash fee for traffic control signs is due with Kenwood Hills 3rd Addition. Street signing
consists of: one speed limit sign with ordinance at $300 each, for a total of $300.00. If the
street signs are installed during frost conditions, the developer shall pay an additional
$150.00 for each street sign location.
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
15 units x $8.85/unit/qtr. x 4 qtrs. = $531.00
Dwelling Units Streetlight Operating Fee Total
A cash fee for one-year of the Environmental Resources Fee shall be paid at the time of final
plat approval and is calculated as follows:
15 units x $10.42/unit/qtr. x 4 qtrs. = $625.20
Dwelling Units Environmental Resources Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
20 units x $90.00/unit = $1,800.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $13,584.70.
CASH REQUIREMENTS
Park Dedication Fee 61,350.00
Lateral Sanitary Sewer Access Charge 25,564.00
Lateral Watermain Access Charge 36,169.79
Trunk Storm Sewer Area Charge 29,743.44
Traffic Control Signs 300.00
Streetlight Operating Fee 531.00
Environmental Resources Fee 625.20
KKEENNWWOOOODD HHIILLLLSS 33RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
NNOOVVEEMMBBEERR 1166,, 22001188
PPAAGGEE 99
City Base Map Updating Fee 1,800.00
City Engineering Administration (3.00%) 13,584.70
SUBTOTAL - CASH REQUIREMENTS $169,668.13
CREDITS TO THE CASH REQUIREMENTS
Removal of Temporary Cul-de-sac 2,000.00
SUBTOTAL - CREDITS TO THE CASH REQUIREMENTS = $ 2,000.00
TOTAL CASH REQUIREMENTS WITH THE FINAL PLAT $167,668.13
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the Kenwood Hills 3rd Addition final plat, grading plan,
utility plan, and erosion control plan subject to the requirements and stipulations of this
report.