Loading...
HomeMy WebLinkAboutSurveyPlanning DepartmentApprovedDate:__________________11/14/2018dmoreyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before AsBuilt escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________11/27/2018corlowsky