HomeMy WebLinkAbout19719 Henning Avenue-SURVEY*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________11/27/2018 corlowsky
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.