Loading...
HomeMy WebLinkAbout19753 Holdingford Way-SURVEYZ o n i n g = R S - 3 The curb box, drain tile cleano u t , a n d c a t c h basin(if applicable) must be in s p e c t e d a n d accepted before As-Built escro w m o n i e s w i l l be released. All structures mu s t b e f l u s h with the sod. This will be sche d u l e d w i t h t h e landscape inspection.*Draintile connection required. E N G I N E E R I N G R E V I E W E D D a t e : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1 1 / 2 7 / 2 0 1 8 c o r l o w s k y E R O S I O N C O N T R O L M U S T B E I N S T A L L E D B E F O R E E X C A V A T I O N *Maintain 6" between bottom of siding and sod.*No structures in easements.