HomeMy WebLinkAboutItem 06.q Date: December 17, 2018 Item No. DODD BOULEVARD AND GLACIER WAY INTERSECTION IMPROVEMENTS AWARD CONTRACT TO GRANITE LEDGE ELECTRICAL CONTRACTORS, INC. AUTHORIZE FUNDING AND AMEND 2019 BUDGETS Proposed Action Staff recommends adoption of the following motion: Move to award contract to Granite Ledge Electrical Contractors Inc. for Dodd Boulevard and Glacier Way Intersection Improvements, City Project 18-08; authorize funding and amend 2019 budgets. Overview On November 5, 2018 the Lakeville City Council approved plans and specifications for City Project 18-08. On November 29, 2018, at 11:00 a.m., the City received seven bids for City Project 18-08 ranging from a low bid of $399,763.85 submitted by Granite Ledge Electrical Contractors to a high bid of $496,150. The engineer’s estimate of the construction cost was $395,196. Primary Issues to Consider • The traffic signal is anticipated to be operational by June 30, 2019. • The City’s Capital Improvement Plan programs an estimated total project cost of $450,000 (includes 2018 encumbrances). Anticipated funding sources are shown below. Funding Sources Amount Municipal State Aid $217,760 Escrow Fund $232,240 Total $450,000 Supporting Information • Bid Tabulation, Agreement, SEH Letter of Recommendation (December 3, 2018) Financial Impact: $450,000 Budgeted: Y☒ N☐ Source: Multiple Sources Related Documents: 2019-2023 City of Lakeville Capital Improvement Plan Envision Lakeville Community Values: Design that Connects the Community Report Completed by: Zach Johnson, City Engineer CITY OF LAKEVILLE RESOLUTION NO. 18-__ RESOLUTION AWARDING CONTRACT FOR DODD BOULEVARD AND GLACIER WAY INTERSECTION IMPROVEMENTS CITY PROJECT 18-08 WHEREAS, the City of Lakeville received sealed bids on Thursday, November 29th, 2018, at 11:00 a.m. for Dodd Boulevard and Glacier Way Intersection Improvements, City Project 18- 08; and WHEREAS, the lowest responsible bid was from Granite Ledge Electrical Contractors, Inc. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Lakeville, Minnesota: Hereby awards the contract to the lowest responsible bidder that meets all the bid requirements, Granite Ledge Electrical Contractors, Inc., with a bid in the amount of $399,763.85. The construction is proposed to be completed as specified in the contract documents. ADOPTED by the Lakeville City Council this 17th day of December 2018. Douglas P. Anderson, Mayor Charlene Friedges, City Clerk CITY OF LAKEVILLE RESOLUTION NO. 18- RESOLUTION AUTHORIZING FUNDING FOR DODD BOULEVARD AND GLACIER WAY INTERSECTION IMPROVEMENTS CITY PROJECT 18-08 WHEREAS, the Dodd Boulevard and Glacier Way Intersection Improvements, City Project 18-08, is programmed in the adopted 2019-2023 Capital Improvement Plan. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Lakeville, Minnesota: The estimated project cost is $450,000 and anticipated funding sources are listed below. City staff is hereby authorized to amend the 2019 budgets and make the appropriate transfers between funds with respect to the project funding sources up to 10% above the estimated costs. Funding transfers may include loans between funds to cover engineering and other costs incurred on the project in advance of receiving other funding. Funding Sources Amount Municipal State Aid $217,760 Escrow Fund $232,240 Total $450,000 ADOPTED by the Lakeville City Council this 17th day of December 2018. ______________________________ Douglas P. Anderson, Mayor _________________________________ Charlene Friedges, City Clerk Estimated Estimated EstimatedItem No. Item Unit Quantity Unit CostTotal Cost Unit CostTotal Cost Unit CostTotal Cost Unit CostTotal Cost Unit CostTotal Cost Unit CostTotal Cost Unit CostTotal Cost Unit CostTotal Cost2011.601 As Built Lump Sum 1 $4,500.00 $4,500.00 $2,320.98 $2,320.98 $2,200.00 $2,200.00 $2,000.00 $2,000.00 $4,725.00 $4,725.00 $5,000.00 $5,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.002021.501 Mobilization Lump Sum 1 $16,000.00 $16,000.00 $5,610.00 $5,610.00 $17,500.00 $17,500.00 $30,655.00 $30,655.00 $21,816.00 $21,816.00$57,000.00 $57,000.00 $22,800.00 $22,800.00 $18,000.00 $18,000.002102.502 Pavement Marking Removal Lin. Ft. 240 $10.00 $2,400.00 $5.61 $1,346.40 $5.51 $1,322.40 $5.30 $1,272.00 $5.00 $1,200.00 $6.00 $1,440.00 $5.25 $1,260.00 $6.00 $1,440.002104.502 Salvage Sign Each 13 $50.00 $650.00 $39.27 $510.51 $38.59 $501.67 $38.00 $494.00 $25.00 $325.00 $35.00 $455.00 $36.75 $477.75 $40.00 $520.002104.503 Remove Curb and Gutter Lin. Ft. 215 $15.00 $3,225.00 $11.22 $2,412.30 $10.00 $2,150.00 $10.00 $2,150.00 $17.00 $3,655.00 $23.00 $4,945.00 $9.20 $1,978.00 $10.00 $2,150.002104.518 Remove Bituminous Walk Sq. Ft. 720 $5.00 $3,600.00 $3.37 $2,426.40 $5.00 $3,600.00 $1.00 $720.00 $3.10 $2,232.00 $5.00 $3,600.00 $3.70$2,664.00 $2.00 $1,440.002104.518 Remove Concrete Walk Sq. Ft. 657 $8.00 $5,256.00 $3.37 $2,214.09 $3.00 $1,971.00 $1.55 $1,018.35 $4.50 $2,956.50 $5.00 $3,285.00 $3.70$2,430.90 $2.00 $1,314.002104.603 Remove & Replace Bituminous Pavement Lin. Ft. 223 $50.00 $11,150.00 $39.27 $8,757.21 $43.43 $9,684.89 $45.50 $10,146.50 $65.25 $14,550.75 $30.00 $6,690.00 $30.85 $6,879.55 $77.00 $17,171.002521.518 6" Concrete Walk Sq. Ft. 3485 $15.00 $52,275.00 $14.59 $50,846.15 $12.48 $43,492.80 $13.75 $47,918.75 $7.70 $26,834.50 $14.00 $48,790.00 $11.60 $40,426.00 $16.00 $55,760.002531.503 Concrete Curb Design V6 Lin. Ft. 100 $50.00 $5,000.00 $56.10 $5,610.00 $55.12 $5,512.00 $30.00 $3,000.00 $26.25 $2,625.00 $28.00 $2,800.00 $52.50 $5,250.00 $100.00 $10,000.002531.603 Concrete Curb & Gutter Lin. Ft. 215 $45.00 $9,675.00 $50.49 $10,855.35 $49.61 $10,666.15 $44.00 $9,460.00 $23.75 $5,106.25 $35.00 $7,525.00 $47.25 $10,158.75 $60.00 $12,900.002531.618Truncated Domes Sq. Ft. 128 $60.00 $7,680.00 $50.49 $6,462.72 $49.61 $6,350.08 $70.00 $8,960.00 $40.50 $5,184.00 $50.00 $6,400.00 $47.25 $6,048.00 $80.00 $10,240.002563.601Traffic Control Lump Sum 1 $15,000.00 $15,000.00 $21,010.98 $21,010.98 $18,612.73 $18,612.73 $22,000.00 $22,000.00 $30,000.00 $30,000.00 $5,000.00 $5,000.00 $17,500.00 $17,500.00 $10,000.00 $10,000.002564.518 Sign Panels Type C Sq. Ft. 44 $50.00 $2,200.00 $67.32 $2,962.08 $66.15 $2,910.60 $64.00 $2,816.00 $39.50 $1,738.00 $65.00 $2,860.00 $63.00 $2,772.00 $70.00 $3,080.002564.518 Sign Panels Type D (Signals) Sq. Ft. 68 $50.00 $3,400.00 $48.25 $3,281.00 $47.41 $3,223.88 $46.00 $3,128.00 $39.50 $2,686.00 $45.00 $3,060.00 $45.20 $3,073.60 $50.00 $3,400.002565.501 Emergency Vehicle Preemption System Lump Sum 1 $21,500.00 $21,500.00 $13,000.00 $13,000.00 $14,329.00 $14,329.00 $14,400.00 $14,400.00 $14,933.00 $14,933.00 $15,000.00 $15,000.00 $17,700.00 $17,700.00 $14,000.00 $14,000.002565.501Traffic Control Interconnect Lump Sum 1 $35,800.00 $35,800.00 $37,312.00 $37,312.00 $24,445.00 $24,445.00 $36,500.00 $36,500.00 $37,708.00 $37,708.00 $36,000.00 $36,000.00 $65,850.00 $65,850.00 $52,000.00 $52,000.002565.516Traffic Control Signal System System 1 $181,000.00 $181,000.00 $208,132.00 $208,132.00 $248,032.00 $248,032.00 $228,000.00 $228,000.00 $256,740.00 $256,740.00 $225,000.00 $225,000.00 $226,750.00 $226,750.00 $260,000.00 $260,000.002565.602 Adjust Handhole Each 8 $500.00 $4,000.00 $725.16 $5,801.28 $369.00 $2,952.00 $230.00 $1,840.00 $236.50 $1,892.00 $250.00 $2,000.00 $250.00 $2,000.00 $450.00 $3,600.002575.602 Site Restoration Each 4 $2,000.00 $8,000.00 $1,009.80 $4,039.20 $3,335.00 $13,340.00 $3,200.00 $12,800.00 $999.00 $3,996.00 $2,000.00 $8,000.00 $1,575.00 $6,300.00 $1,500.00 $6,000.002582.503 4" Solid Line Paint (Epoxy) Lin. Ft. 260 $1.00 $260.00 $1.57 $408.20 $1.54 $400.40 $1.50 $390.00 $1.40 $364.00 $1.50 $390.00 $2.90 $754.00 $5.00 $1,300.002582.503 12" Solid Line Paint (Epoxy) Lin. Ft. 700 $2.00 $1,400.00 $4.26 $2,982.00 $4.19 $2,933.00 $4.00 $2,800.00 $3.80 $2,660.00 $4.00 $2,800.00 $11.75 $8,225.00 $7.50 $5,250.002582.503 24" Solid Line Paint (Epoxy) Lin. Ft. 185 $5.00 $925.00 $7.18 $1,328.30 $7.06 $1,306.10 $6.80 $1,258.00 $6.40 $1,184.00 $7.00 $1,295.00 $15.75 $2,913.75 $11.00 $2,035.002582.518 Pvmt Mssg-Paint (Epoxy) Sq. Ft. 15 $20.00 $300.00 $8.98 $134.70 $8.82 $132.30 $8.50 $127.50 $8.00 $120.00 $9.00 $135.00 $23.15 $347.25 $170.00 $2,550.00Total Bid Cost $395,196.00 $399,763.85 $437,568.00 $443,854.10 $445,231.00 $449,470.00 $456,558.55 $496,150.00 Meyer Contracting McNamara Contracting Egan Company Urban Companies, Inc.Official Bid TabulationCSAH 9 (Dodd Blvd) at Glacier WayCity of Lakeville (Dakota County)November 29,2018 at 11:00amEngineer's Estimate Granite Ledge Electrical Collins Electrical Pember Companies