HomeMy WebLinkAbout19715 Henning Avenue-SURVEYZoning = RS-3 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the
landscape inspection.
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________12/12/2018 corlowsky
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.