Loading...
HomeMy WebLinkAbout19711 Henning Avenue-SURVEYZoning = RS-3 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________11/29/2018 ibradshaw