Loading...
HomeMy WebLinkAbout18309 Gleed Rd SurveyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted before As-built escrow monies will be released. All structures must be flush with the sod. This will be scheduled with the landscape inspection. *Maintain 6" between siding & sod *No structures in easements ENGINEERING REVIEWED Date:__________________12/13/2018 rmcdonald *Draintile connection required. Planning DepartmentApprovedDate:__________________12/17/2018 dmorey