HomeMy WebLinkAbout18309 Gleed Rd SurveyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted
before As-built escrow monies will be released. All structures must be flush with the sod. This
will be scheduled with the landscape inspection.
*Maintain 6" between siding & sod
*No structures in easements
ENGINEERING REVIEWED
Date:__________________12/13/2018 rmcdonald
*Draintile connection required.
Planning DepartmentApprovedDate:__________________12/17/2018 dmorey