Loading...
HomeMy WebLinkAbout8352 197th Street West-SURVEYZoning = RS-3 EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. *Maintain 6" between siding & sod *No structures in easements ENGINEERING REVIEWED Date: 12/18/2018___rmcdonald