Loading...
HomeMy WebLinkAbout18373 Gleed RdPlanning DepartmentApprovedDate:__________________12/17/2018 dmorey Draintile connection required. The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. ENGINEERING REVIEWED Date:__________________12/21/2018 corlowsky EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements.