HomeMy WebLinkAbout18373 Gleed RdPlanning DepartmentApprovedDate:__________________12/17/2018 dmorey
Draintile connection
required.
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
ENGINEERING REVIEWED
Date:__________________12/21/2018 corlowsky
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.