Loading...
HomeMy WebLinkAbout18065 Green Gables Tr SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Draintile connection required. ENGINEERING REVIEWED Date:__________________11/29/2018 ibradshaw *Maintain 6" between bottom of siding and sod. *No structures in easements. Planning DepartmentApprovedDate:__________________12/07/2018 dmorey