Loading...
HomeMy WebLinkAboutSurveyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONThe curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.*Maintain 6" between siding & sod*No structures in easementsENGINEERING REVIEWEDDate: 12/19/2018___rmcdonaldPlanning DepartmentApprovedDate:__________________12/20/2018dmorey