HomeMy WebLinkAbout19898 Hexham Way SurveyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION
ENGINEERING REVIEWED
DATE: 12/27/2018 smurphy
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.
* DRAIN TILE CONNECTION IS REQUIRED
* STRUCTURES MAY NOT BE PLACED WITHIN
EASEMENTS