PROPOSED AMENITY REDUCTIONS
TOTAL $26,972,648 PARK BOND REFERENDUM PROPOSED PARK AMENITY REDUCTIONS $7,500,000 $11,900,000 $2,000,000 TOTAL $33,675,000 $6,702,352 SUBTOTAL $2,000,000 Ames Arena Bonding Costs $5,000,000 $375,000 SUBTOTAL $700,000 Hasse Dome $6,900,000Replace Dehumidifier Systems $700,000 54% SUBTOTAL $2,884,350 East Community Park $2,000,000 Reduction - Design/Eng/Const. Adm (8%)$187,600 Reduction - Contingency and Mobilization (15%)$351,750 Multi-Purpose Field Lighting (3 @ $150,00)$450,000 Artificial Turf (1 Field)$970,000 Outdoor Fitness $90,000 51% Hockey and Pleasure Rinks $195,000 B.B. Field Restroom/Concessions/Warminghouse Building/Grandstand replaced with a Prefabricated Building and Bleachers/Site Furnishings $600,000 40% B.B. Field - Entry Plaza Reduced $40,000 SUBTOTAL $1,118,002 Avonlea Park Reduction - Design/Eng/Const. Adm (15%)$129,000 Reduction - Contingency and Mobilization (15%)$129,000 Shelter By 2 VB Courts (Incl Elect./Amenities) $53,000 52% Adventure Challenge Area $227,000 PROJECT ESTIMATED COST PROPOSED REDUCTION COSTS MORE LIKELY % Shade Umbrellas (Picnic Areas) (4 @ $7,500)$30,000 49% Beach Shade Umbrellas (5 @ $10,000)$50,000 49% Antlers Park Reduce from 2 to 1 Bldg - Rest/Concessions $500,000 43%