Loading...
HomeMy WebLinkAbout20607 Gunnison Drive SurveyDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes found scribed "x"Denotes set hubDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationDenotes existing contoursDenotes proposed contours1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. Building dimensions shown are outside of buildingdimensions (First Floor). See architectural plans for building andfoundation dimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by PARAMOUNT Engineering & Design.6.Grading plan date/revision date: August 8, 2016.7.Sanitary service invert elevation = 965.88.Plan No. 1918-CR2G 'NEWBERRY'016'5Lot= 8,600 sq. ft.House/Garage= 1,683 sq. ft.Front Porch= 154 sq. ft.Driveway= 689 sq. ft.Total Impervious= 2,526 sq. ft. or 29.37% of lot*#4&%18'4%#.%7.#6+105ProposedGarage Floor @ Front= 977.9Top of Foundation Garage= 978.4Top of Foundation House= 979.1Lowest Floor= 970.4Lot 14, Block 3, LINDEN RIDGE, Dakota County, Minnesota2412'46;&'5%4+26+1020607 Gunnison Drive, Lakeville, Minnesota2412'46;#&&4'55I hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 7th day of January, 2019Marcus F. Hampton, MN L.S. No. 474815748';14ž5%'46+(+%#6'(.114'.'8#6+105Top nut of hydrant located at Lots 16 and 17, Block 3 = 981.02$'0%*/#4-Front House= 20 ft.Front Garage= 25 ft.Side= 7 ft.Rear= 30 ft.Side Street = 20 ft.$7+.&+0)5'6$#%-5*DROP GARAGE TOP OF BLOCK 0.7'**9.0' BASEMENT*Zoning = RST-2ENGINEERING REVIEWEDDATE: 01/24/2019 smurphyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.* DRAIN TILE CONNECTION IS REQUIRED* STRUCTURES MAY NOT BE PLACED WITHINEASEMENTS