Loading...
HomeMy WebLinkAbout19730 Henning Avenue-SURVEYZoning = RS-3 DRAIN TILE CONNECTION REQUIRED EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. ENGINEERING REVIEWED Date: 01/24/2019___rmcdonald *Maintain 6" between siding & sod *No structures in easements