HomeMy WebLinkAbout19730 Henning Avenue-SURVEYZoning = RS-3
DRAIN TILE CONNECTION REQUIRED
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.
ENGINEERING REVIEWED
Date: 01/24/2019___rmcdonald
*Maintain 6" between siding & sod
*No structures in easements