HomeMy WebLinkAbout18921 Huntley Trail161017
By Christina Orlowsky at 3:29 pm, Sep 18, 2018
1. Bearings are based on the recorded plat.
2. Building dimensions shown are for horizontal and vertical placement of
structure only. See architectural plans for building and foundation
dimensions.
3. No specific soils investigation has been completed on this lot by James
R. Hill, Inc. the suitability of soils to support the specific house proposed
is not the responsibility of James R. Hill, Inc. or the surveyor.
4. No specific title search for existence or non-existence of recorded or
un-recorded easements has been conducted by the surveyor as a part
of this survey. Only easements per the recorded plat are shown.
5. Proposed grades shown were taken from the grading &/or
development plan prepared by PIONEER engineering.
6. Grading plan date/revision date: July 26, 2016
7. Plan No. 5486-B 'ADAMS'
Lot = 14,177 sq. ft.
House/Garage = 1,828 sq. ft.
Porch = 127 sq. ft.
Driveway = 889 sq. ft.
Sidewalk = 36 sq. ft.
Total Impervious = 2,880 sq. ft. or 20.31% of lot
Proposed As-built
Garage Floor @ Front = 1088.9 = 1089.0
Garage Top of Block = 1089.3 = 1089.3
House Top of Block = 1089.3 = 1089.3
Lowest Floor = 1081.3 = 1081.3
Top of Block
at Egress Window = 1084.5 = 1084.5
Lot 6, Block 7, CHOKECHERRY HILL 4TH ADDITION, Dakota County, Minnesota
18921 Huntley Trail, Lakeville, Minnesota
I hereby certify that this survey, plan or report was prepared by me or under
my direct supervision and that I am a duly Licensed Land Surveyor under the
laws of the State of Minnesota. That this survey does not purport to show all
improvements, easements or encroachments, to the property except as
shown thereon.
Signed this 11th day of April, 2018
Marcus F. Hampton, MN L.S. No. 47481
Top nut of hydrant located at Lots 7 and 8, Block 7 = 1092.04
Denotes set spike
Denotes set iron monument
Denotes found iron monument
Denotes proposed drainage
Denotes top of curb
Denotes as-built elevation
Denotes proposed elevation