HomeMy WebLinkAbout18390 Glenbridge Ave SurveyPlanning DepartmentApprovedDate:__________________02/08/2019 dmorey
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATIONENGINEERING REVIEWED
DATE: 02/11/2019 smurphy The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted
before As-built escrow monies will be released. All structures must be flush with the sod. This
will be scheduled with the landscape inspection.
* Structures may not be placed
within easements