HomeMy WebLinkAbout19560 Hibbing Way-SurveyENGINEERING REVIEWED
DATE: 02/12/2019 smurphy
EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.
* Structures may not be placed
within easements
* Connection to drain tile is
required