Loading...
HomeMy WebLinkAbout19560 Hibbing Way-SurveyENGINEERING REVIEWED DATE: 02/12/2019 smurphy EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. * Structures may not be placed within easements * Connection to drain tile is required