HomeMy WebLinkAbout16295 Durango Tr Survey1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 7/28/17.7.Plan No. SBF18.19.04-THE STIRLING-ELEVATION ANOTESLot= 4,163 sq. ft.House/Garage= 2,067 sq. ft.Porch= 136 sq. ft.Driveway= 80 sq. ft.Total Impervious= 2,283 sq. ft. or 54.8 % of lotHARD COVER CALCULATIONSProposedGarage Floor @ Front= 935.1Garage Top of Block= 935.8House Top of Block= 935.8Lowest Floor= 927.8Top of Block at Lookout Window= 931.0*Front wall is 9 ft.Lot 19, Block 4, SPIRIT OF BRANDTJEN FARM 18TH ADDITION, Dakota County,MinnesotaPROPERTY DESCRIPTION16295 Durango Trail, Lakeville, MinnesotaPROPERTY ADDRESSI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 29th day of January, 2019Marcus F. Hampton, MN L.S. No. 47481SURVEYOR'S CERTIFICATEFLOOR ELEVATIONSTop nut of hydrant located at Lots 3 and 4, Block 6 = 933.03BENCHMARKDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationJames R. Hill, Inc.
2500 WEST C.R. 42, SUITE 120, BURNSVILLE, MN 55337
PHONE: 952.890.6044 www.jrhinc.com
PLANNERS / ENGINEERS / SURVEYORS
CERTIFICATE OF SURVEY
FOR
ROBERT THOMAS HOMESDRAWN BYDATEREVISIONS1/29/2019CAD FILEPROJECT NO.SHEET 1 OF 1390072.dwg390072Lot 19, Block 4, SPIRIT OF BRANDTJEN FARM
18TH ADDITION, Dakota County, MinnesotaJCB ENGINEERING REVIEWEDDATE: 02/11/2019 smurphyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONThe curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.* Structures may not be placed withineasementsPlanning DepartmentApprovedDate:__________________02/20/2019dmorey