HomeMy WebLinkAbout18190 Goldfinch Way SurveyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONThe curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.*Maintain 6" between siding & sod*No structures in easementsENGINEERING REVIEWEDDate: 01/03/2019___rmcdonaldPlanning DepartmentApprovedDate:__________________01/11/2019dmorey