HomeMy WebLinkAbout18137 Green Gables Tr Survey* DRAIN TILE CONNECTION IS REQUIRED* STRUCTURES MAY NOT BE PLACED WITHINEASEMENTSENGINEERING REVIEWEDDate: 01/24/2019___smurphyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.Planning DepartmentApprovedDate:__________________02/05/2019dmorey