HomeMy WebLinkAboutItem 06.eMarch 12, 2010
Item No. t�_
MARCH 15, 2010 CITY COUNCIL AGENDA ITEM
APPROVE PLANS AND SPECIFICATIONS AND SET BID DATE
2010 MISCELLANEOUS ROADWA Y REPAIRS AND OVERLA YS
CITY IMPRO VEMENT PROJECT 10-01
Proposed Action
Staff recommends adoption of the following motion: Motion to approve the final Plans and
Specifications and the Notice to Bidders with a bid date set for Tuesday, April 13, 2010 at 2:00
p.m. for 2010 Miscellaneous Roadway Repairs and Overlays, City Improvement Project 10-01.
Overview
In accordance with the City's Pavement Management Program and the approved 2008-2012 Capital
Improvement Plan, the Engineering Department has completed Plans and Specifications for the
above -referenced improvements. The project consists of miscellaneous roadway repairs (patching)
and the mill and overlay of 165th St. (Ipava Avenue to Highview Avenue), Griffon Trail (Highview
Avenue to Grinnell Avenue), Kenrick Avenue (210th Street to 205th Street) and Ipava Avenue (175th
Street to 165th Street). The addition of Ipava Avenue is a result of severe winter conditions. 165th
Street and Griffon Trail are included as a bid alternate; if a Jobs Bill (similar to last year's ARRA
funding) that includes funding for local infrastructure is approved in the next few weeks, staff will
submit this roadway for federal stimulus funding and recommend deletion from the contract.
The miscellaneous roadway repairs and overlays are estimated at $1,036,693.50; the 2010 Public
Works Reserve Fund budgeted $986,391. A copy of the Plans are on file and available for review in
the Engineering Department. If bids are above the estimate, 165th Street and Griffon Trail can be
deleted from the contract to keep the project within budget.
Attached is a resolution approving the final Plans and Specifications and the Notice to Bidders.
Advertisement will occur in the Construction 8011etin on March 22 and April 5, 2010 and in the
Dakota County Tribune on March 19, 2010.
Primary Issues to Consider
None.
Supporting Information
• Notice to Bidders
• Engineer's Estimate
Keith H. Nelson, City Engineer
Financial Impact: $1,036,693.50 Budgeted: Y/N Y Source: Public Works Reserve Fund
Related Documents (CIP, ERP, etc.):
Notes:
CITY OF LAKEVILLE
RESOLUTION NO.
RESOLUTION APPROVING PLANS AND SPECIFICATIONS
AND SET BID DATE FOR
2010 MISCELLANEOUS ROADWA Y REPAIRS AND OVERLA YS
CITY IMPRO VEMENT PROJECT 10-01
WHEREAS, the Engineering Department prepared Plans and Specifications for 2010 Miscellaneous
Roadway Repairs and Overlays (City Improvement Project 10-01) in accordance with the City's
Pavement Management Program and 2008-2012 Capital Improvement Plan;
NOW, THEREFORE, LET IT BE RESOLVED by the City Council of the City of Lakeville,
Minnesota:
That the Plans and Specifications for Improvement Project No. 10-01 are hereby approved by the
City Council of the City of Lakeville, Minnesota.
BE IT FURTHER RESOLVED, that bids will be advertised as required and opened at 2:00 p.m. on
Tuesday, April 13, 2010 at City Hall, 20195 Holyoke Avenue, Lakeville, Minnesota.
APPROVED AND ADOPTED this 15th day of March, 2010.
CITY OF LAKEVILLE
Holly Dahl, Mayor
ATTEST:
Charlene Friedges, City Clerk
NOTICE TO BIDDERS
2010 MISCELLANEOUS ROADWAY REPAIRS AND OVERLAYS
CITY OF LAKEVILLE IMPROVEMENT PROJECT NO. 10-01
OWNER ... The City of Lakeville, Minnesota hereby gives notice that sealed bids will be received for the
construction of Improvement Project No. 10-01.
TIME ... Sealed bids will be received until 2:00 p.m., Local Time, on Tuesday, April 13, 2010, in the
office of the City Clerk, 20195 Holyoke Avenue, Lakeville, Minnesota 55044.
PROJECT DESCRIPTION... The work involves pavement repair. The work includes the following
approximate quantities of principal construction items:
QUANTITY
UNIT
ITEM
357
CY
Sub rade Excavation
76,513
SY
Bituminous Surface Mill
13,946
TON
Bituminous Base and Wearing Course(Patching & Surfacing)
93
EA
Pedestrian Curb Ram
193
LF
Concrete Curb and Gutter
BIDDING DOCUMENTS... The bidding Documents are on file for inspection at the office of the City
Engineer, 20195 Holyoke Avenue, Lakeville, Minnesota 55044. Copies of the Bidding Documents may
be obtained from the office of the City Engineer.
A $35.00 payment for each set of Bidding Documents is required. There will be no refund on the
deposits.
BID SECURITY... Bid security in the amount of not less than 5% of the Bid shall accompany each Bid
in accordance with the Instruction to Bidders.
CONTRACT SECURITY...The Bidder to whom a Contract is awarded shall be required to furnish both
a Performance Bond and a Payment Bond acceptable to OWNER for 100% of the Contract Price for
each of the above Bonds, in accordance with the requirements of the Contract Documents.
BID REJECTION/ACCEPTANCE... OWNER reserves the right to reject any and all Bids, waive any
informalities in bidding or to accept the Bid or Bids, which best serve the interests of the OWNER.
BID WITHDRAWAL...No bid shall be withdrawn for a period of 60 days after the scheduled opening
of the Bids without the consent of the OWNER.
Published by the authority of the City of Lakeville, Minnesota.
By:
Charlene Friedges, City Clerk
Date: March 15, 2010
Published in the Construction Bulletin on March 22 and April 5, 2010
Published in the Lakeville Life and rimes on March 18, 2010
ENGINEERS ESTIMATE 3 -Mar -10
2010 MISCELLANEOUS ROADWAY REPAIRS
AND OVERLAYS, DISTRICT 2A1
CITY IMPROVEMENT PROJECT 10-01
The bidder agrees to perform all work described in the Contract Documents for the following unit prices or lump sum.
SCHEDULE A• Ipava Avenue from North side of 165th Street to 365' North of 175th Street
ITEM QUANTITY UNIT PRICE EXTENSION
2" BITUMINOUS SURFACE MILL'
22,014
SY
REMOVE BITUMINOUS PAVEMENT
366
SY
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)'
209
LF
TYPE MVWE 350358 WEARING COURSE'
1,866
TON
TYPE LVNW 35030B NON -WEARING BASE COURSE'
1,887
TON
PEDESTRIAN CURB RAMP
24
EA
MILL BITUMINOUS STEP JOINT`
1,130
LF
CASTING AND RING ADJUSTMENT
6
EA
CASTING ADJUSTMENT AND RING REPLACEMENT
2
EA
ADJUST VALVE BOX
6
EA
PAVEMENT MESSAGE - RIGHT ARROW
2
EA
PAVEMENT MESSAGE - LEFT
18
EA
CROSSWALK MARKING- ZEBRA STRIPS
277
SF
24" SOLID WHITE STOP BAR
25
LF
4" SOLID LINE WHITE - PAINT
2,349
LF
4" SOLID LINE YELLOW - PAINT
1,177
LF
4" DOUBLE SOLID LINE YELLOW - PAINT
810
LF
SCHEDULE B: Repairs Inside District 2A1
ITEM QUANTITY UNIT PRICE EXTENSION
REMOVE CURB & GUTTER (ALL TYPES)'
143
LF
REMOVE BITUMINOUS PAVEMENT'
1,577
SY
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)'
2,256
LF
SUBGRADE EXCAVATION (EV) (PATCHING)
51
CY
AGGREGATE BASE, CLASS 5 (PATCHING)
97
TON
FOUNDATION MATERIAL (3" MINUS)
72
TON
MILL BITUMINOUS STEP JOINT
2,221
LF
TYPE MVWE 35035B WEARING COURSE (PATCHING)'
134
TON
TYPE MVWE 45035B WEARING COURSE (DRIVEWAY)'
2
TON
TYPE LVNW 35030B NON -WEARING BASE COURSE (PATCHING)`
179
TON
CONCRETE CURB & GUTTER (ALL TYPES)'
143
LF
CASTING AND RING ADJUSTMENT
1
EA
CASTING ADJUSTMENT AND RING REPLACEMENT
1
EA
ADJUST VALVE BOX
2
EA
REPAIR IRRIGATION SYSTEM
2
EA
SCHEDULE C: Citywide Roadway Repairs
ITEM QUANTITY UNIT PRICE EXTENSION
REMOVE CURB & GUTTER (ALL TYPES)'
50
LF
REMOVE BITUMINOUS PAVEMENT'
2,800
SY
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)'
3,403
LF
SUBGRADE EXCAVATION (EV) (PATCHING)
156
CY
AGGREGATE BASE, CLASS 5 (PATCHING)
147
TON
FOUNDATION MATERIAL (3" MINUS)
109
TON
MILL BITUMINOUS STEP JOINT'
3,403
LF
TYPE MVWE 35035B WEARING COURSE (PATCHING)'
238
TON
TYPE LVNW 35030B NON -WEARING BASE COURSE (PATCHING)-
317
TON
CONCRETE WALK'
484
SF
CONCRETE CURB & GUTTER (ALL TYPES)'
50
LF
CONCRETE DRIVEWAY (HIGH -EARLY)'
265
SF
CASTING AND RING ADJUSTMENT
4
EA
CASTING ADJUSTMENT AND RING REPLACEMENT
1
EA
ADJUST VALVE BOX
5
EA
REPAIR IRRIGATION SYSTEM
2
EA
SCHEDULE D: Kenrick Avenue form 335' North of 205th Street to 750' Norht of CR 70 Mill and Overlay
ITEM QUANTITY UNIT PRICE EXTENSION
3" BITUMINOUS SURFACE MILL'
7,545
SY
MILL BITUMINOUS STEP JOINT'
132
LF
TYPE MVWE 35035B WEARING COURSE
640
TON
TYPE LVNW 35030B NON -WEARING BASE COURSE'
640
TON
AGGREGATE SHOULDERING CLASS 2'
270
TON
PEDESTRIAN CURB RAMP
2
EA
PAVEMENT MESSAGE - RIGHT ARROW
6
EA
CROSSWALK MARKING- ZEBRA STRIPS
343
SF
24" SOLID WHITE STOP BAR
45
LF
4" SOLID LINE YELLOW - PAINT
550
LF
4" BROKEN LINE YELLOW - PAINT
3,090
LF
4" SOLID LINE WHITE - PAINT
5,515
LF
4" DOUBLE SOLID LINE YELLOW - PAINT
325
LF
SCHEDULE E• Bid Alternate A 165th Street - 600' East of Ipava Avenue to Hiahview Avenue Mill and Overlay
ITEM QUANTITY UNIT PRICE EXTENSION
2" BITUMINOUS SURFACE MILL'
24,547
SY
MILL BITUMINOUS STEP JOINT'
1,443
LF
TYPE MVWE 35035B WEARING COURSE'
2,081
TON
TYPE LVNW 35030B NON -WEARING BASE COURSE'
2,081
TON
PEDESTRIAN CURB RAMP
31
EA
CASTING AND RING ADJUSTMENT
6
EA
CASTING ADJUSTMENT AND RING REPLACEMENT
3
EA
ADJUST VALVE BOX
11
EA
PAVEMENT MESSAGE - RIGHT ARROW
2
EA
PAVEMENT MESSAGE - LEFT/STRAIGHT ARROW
2
EA
CROSSWALK MARKING- ZEBRA STRIPS
686
SF
24" SOLID WHITE STOP BAR
26
LF
4" SOLID LINE WHITE - PAINT
10,662
LF
4" DOUBLE SOLID LINE YELLOW - PAINT
4,916
LF
SCHEDULE E• Bid Alternate A Griffon Avenue from Hiahview, Avenue to Grinnell Avenue Mill and Overlay
ITEM QUANTITY UNIT PRICE EXTENSION
2" BITUMINOUS SURFACE MILL'
22,407 SY $ 070 $
15,684.90
REMOVE BITUMINOUS PAVEMENT'
318 SY $ 3.70 $
1,176.23
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)'
350 LF $ 2.00 $
699.60
MILL BITUMINOUS STEP JOINT'
1,769 LF $ 2.15 $
3,802.92
SUBGRADE EXCAVATION (EV) (PATCHING)
150 CY $ 13.50 $
2,025.00
AGGREGATE BASE, CLASS 5 (PATCHING)
147 TON $ 22.50 $
3,30750
FOUNDATION MATERIAL (3" MINUS)
156 TON $ 28.00 $
4,368.00
TYPE MVWE 35035B WEARING COURSE
1,899 TON $ 5200 $
98,748.00
TYPE LVNW 35030B NON -WEARING BASE COURSE
1,899 TON $ 50.00 $
94,950 00
TYPE LVNW 35030B NON -WEARING BASE COURSE (PATCHING)
83 TON $ 100.00 $
8,300.00
PEDESTRIAN CURB RAMP
36 EA $ 1,000.00 $
36,000.00
CASTING AND RING ADJUSTMENT
15 EA $ 300.00 $
4,50000
CASTING ADJUSTMENT AND RING REPLACEMENT
3 EA $ 400.00 $
1,200 00
ADJUST VALVE BOX
10 EA $ 150.00 $
1,500.00
PAVEMENT MESSAGE - RIGHT ARROW
1 EA $ 45.00 $
4500
PAVEMENT MESSAGE - LEFT/STRAIGHT ARROW
1 EA $ 45.00 $
4500
4" SOLID LINE WHITE - PAINT
8,522 LF $ 0.20 $
1,704.40
4" DOUBLE SOLID LINE YELLOW - PAINT
4,102 LF $ 0.33 $
SCHEDULE E: $
1,353.66
279,410.21
SCHEDULE A. Ipava Ave from North of 165th St to 365' North of 175th St. - Subtotal $
240,987.79
SCHEDULE B- Repairs Inside District 2A1 - Subtotal $
58,434.53
SCHEDULE C. Citywide Roadway Repairs- Subtotal $
99,496.21
SCHEDULED Kenrick Ave from 335' North of 205th St to 750' North of CR 70 Mill and Overlay -Subtotal
85.1 . 5
TOTAL: $
484,047.58
SCHEDULE E: 165th Stret 600' East of Ipava to Highview Avenue Mill and Overlay -Subtotal $ 273,235 71
SCHEDULE E: Griffon Trail From Highview Avenue to Grinnel Avenue Mill and Overlay -Subtotal $ 279.41 21
GRAND TOTAL: I$ 552,645.92
Total $ 1,036,693.50