APPROVE BUILDING PERMIT FEE ORDINANCE AMENDMENT ELIMINATING REFERENCE
TO AND INCLUSION OF STATE OF MINNESOTA SURCHARGE FEES
Proposed Action
Staff recommends adoption of the following motion: Adopt an ordinance amending the City's
fee schedule for building permit fees to eliminate reference to and inclusion of State of
Minnesota surcharges for City issued building permits.
Adoption of this ordinance will result in the City only including City fees for building permits and
State surcharge amounts will not be included in the City's fee schedule that is approved by
ordinance each year.
Overview
In April of this year the State Legislature approved and the Governor signed a supplemental
budget bill that among other things increased the minimum State surcharge amount collected
on fixed fee building permits from $.50 to $5 effective July 1, 2010 to June 30th 2011. Examples
of the fixed fee building permits include permits for re -roofing, residing, window replacement,
and minor electrical or plumbing work among others.
State surcharge fees are collected by the City with the issuance of all building permit fees and
are forwarded to the State of MN Construction Codes and Licensing Division of the Department
of Labor and Industry. The increase was determined by the State to be necessary because of
a significant reduction in the surcharge amounts being collected as a result of the downturn in
the construction industry.
The City has previously included the State surcharge amount in the fixed fee building permits in
part because of the desire to have round number amounts for fixed fee permits such as $40.00
for a re -roofing permit rather than $39.50. However it is staff's recommendation that we
discontinue this practice and no longer include any reference to State surcharge amounts in our
fee schedule which has to be adopted by ordinance. This will eliminate the need to amend the
City's ordinance when State surcharge amounts are changed in the future.
Primary Issues to Consider
• Is the City increasing its portion of building permit fees as part of this ordinance
amendment? The City portion of building permit fees are remaining the same.
Supporting Information
• Execution and redline copies of the Ordinance Adopting City Fees.
• Bulletin fromp Department of Labor and Industry dated April 21, 2010.
son
Community and Economic Development Director
Financial Impact: $ 6 Budgeted: Y/N Source:
443 Lafayette Road N. MIN�IESCiTA DEPARTMENT t7F (651) 2845005
St. Paul, Minnesota 55155 LABOR & II�IDUSTRY 1-800-DIAL-DLI
51) DIAL -DLI
www.dii.mn.gov TTY: 651 297-4198
April 21, 2010
Surcharge fee increase background information
The economic downturn in the construction industry has significantly impacted the Construction
Codes fund. The downturn has greatly diminished the annual revenue the Department of Labor
and Industry's (DLI) Construction Codes and Licensing Division (CCLD) receives from plan
reviews, permits, licenses and surcharges.
CCLD's revenue is also hampered by the ongoing annual transfer of $1.515 million from its
Construction Codes fund. This fund is a State Government Special Revenue fund and not a
General fund account. Yet, during the 2007 session, the Legislature required DLI to transfer
$1,627,000 by June 30, 2008; $3,515,000 by June 30, 2009; and $1,515,000 each year thereafter
from the Construction Codes fund to the General fund (Chapter 135, Article 1, Section 16).
Since 2005, approximately $12 million of CCLD funds have been transferred to the General
Fund. In 2009, $3.515 million was transferred to the General fund, which forced CCLD to lay off
13 staff, cancel contractor education programs and spring and fall seminars, and reshuffle
programs to meet budgets.
During the 2010 session, CCLD attempted to eliminate this year's $1.515 million transfer.
Instead, the first legislative budget proposed an additional $1 million be transferred from the
Construction Codes fund to the General fund.
Minnesota's construction industry then stepped up and asked the legislature to reconsider its
budget proposal. In response, the Legislature removed the $1 million transfer, kept in the $1.515
million transfer in place and raised the minimum state building permit surcharge fees applicable
to fixed fee permits for one year from 50 cents to $5 (July 1, 2010, until June 30, 2011).
Next session, CCLD will again try to remove the annual $1.515 million transfer from the
Construction Codes fund to the General fund during its budget submittals.
CCLD's preference was to remove the yearly transfer and not raise the surcharge fee. The
decision to raise surcharge fees was made by legislative finance committees and was packaged
into a large finance and budget bill that was signed by the Governor.
More information about the minimum state building permit surcharge legislative change is online
at www.dli.mn.gov/CCLD/SurchargeChange.asp.
This information can be provided to you in alternative formats (Braille, large print or audio).
An Equal Opportunity Employer
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
SUMMARY OF ORDINANCE NO.
AN ORDINANCE ADOPTING A FEE SCHEDULE
This ordinance prescribes fees sufficient to defray the costs incurred by the City of
Lakeville in reviewing, investigating and administering applications for the amendment
to an official control established pursuant to Minnesota Statutes Sections 462.351 to
462.364 and applications for permits or approvals required under an official control
established pursuant to those sections. This ordinance also prescribes billboard license
fees and building permit and related fees.
A printed copy of the ordinance is available for inspection by any person during regular
office hours at the office of the City Clerk.
APPROVED FOR PUBLICATION this day of , 2010, by the City
Council of the City of Lakeville, Minnesota.
CITY OF LAKEVILLE
I
ATTEST:
Charlene Friedges, City Clerk
Holly Dahl, Mayor
GAFee Schedule Ordinance 2010.doc
I
r.
ORDINANCE NO.
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
AN ORDINANCE ADOPTING FEES
THE CITY COUNCIL OF THE CITY OF LAKEVILLE, MINNESOTA ORDAINS:
I. LICENSES
A. Billboard:
1. Double-faced .............................................. $ 100.00
2. Single -faced ............................................... $ 50.00
3. Illuminated ................................................. $ 25.00
II. PERMITS
A. Building Permits
$1.00 to $500.00
$30.00
$501.00 to 2,000.00
$30.00 for the first $500.00 plus $3.25 for each additional $100.00, or
fraction thereof, to and including $2,000.00
$2,001.00 to $25,000.00
$73.75 for the first $2,000.00 plus $14.75 for each additional $1,000.00, or
fraction thereof, to and including $25,000.00
$25,001.00 to $50,000.00
$413.00 for the first $25,000 plus $10.75 for each additional $1,000.00, or
fraction thereof, to and incuding $50,000.00
$50,001.00 to $100,000.00
$681.75 for the first $50,000.00 plus $7.50 for each additional $1,000.00, or
fraction thereof, to and including $100,000.00
$100,001.00 to $500,000.00
$1056.75 for the first $100,000.00 plus $6.00 for each additional $1,000.00,
or fraction thereof, to and including $500,00.00
$500,001.00 to $1,000,000.00
$3,456.75 for the first $500,000.00 plus $5.00 for each aditional $1,000.00,
or fraction thereof, to and including $1,000,000.00
$1,000,001.00 and up
$5,956.75 for the first $1,000,000.00 plus $4.00 for each additional
$1,000.00, or fraction thereof
B. Plan Check Fees
65% of building permit fee for permits with valuations greater than $10,000.
25% of building permit fee for permits issued for similar buildings as required by State
Building Code.
C. Plumbing Permits
Requirement: Master License Number or pipe layers certificate, $25, 000 license bond and current
Certificate of Liability Insurance to be filed with City. Note: State Department of Health Bond and
Insurance Certificate will satisfy this requirement.
Deleted: (incudes surcharge)
Residential - Minimum Deleted: 40.00
(repairs and alterations, lawn sprinkler systems) ............................. $'39.50 ,Deleted: (includes surcharge)
Complete installation..........................................................::.....:...... $90.00 Deleted: plus surcharge (.0005
Commercial - 1.5% of contract/valuation price up to $10,000 and 1.0% of contract/valuation times c°ntractvaluatr°n)
price above $10,000, (includes surcharge)
Deleted: 40.00
Commercial - Minimum r $9.50 -` Deleted: 40.00
RPZ Valve (new)......................................................................................... $,:39.50Deleted:40.
RPZ Valve(replacement bildao
or reu............................................................
) $�__9.50
____________________••-
, 'Deleted: (incudes surcharge)
Water Softener/Water Heater.............................................................._.,....$_ 39.50 Deleted: 40.00
Deleted: (includes surcharge)
D. Heating Permits
rx:e 950 Deleted: $Residential - Minimum repairs and alterations c .......................• +'.. t
Deleted: 40.00
Complete installation . ....................................... ........ .... '$90.00
Commercial - 1.5% of contract/valuation price up to $10,000 and 1.0% of contract/valuation Dem: (includessurcharge)
price above $10,000 Deleted: $ 90.00
1, Deleted: plus surcharge (.0005
Commercial minimumx$,39.50 times contract/valuation)'...........L'-Sl:'IIsi_'_:7:'___•_:'_'_'_'L•__:•_______:•_____:__•_______: •,,---- ----- -. _.-__. ,
Deleted: (includes surcharge)
E. Sewer and Water Permits Deleted: $
Requirement: Master License Number, $25, 000 License Bond and current Certificate of Liability Deleted: 40.00
Insurance to be filed with City. Note: State Department of Health Bond and Insurance Certificate Deleted: (includes surcharge)
will satisfy this requirement. Deleted: 40.00
Residential - Minimum repairs and alterations $ 9.50 Deleted: (includes surcharge)
p c.c-------------------:^_--_-- r'--------------------' Deleted: plus surcharge (.0005
City water and sewer including conversion ,........._... ..............:..................$ 90.00 times contract/valuation)
Commercial -One percent (1%) of contract/valuation priceDeleted: (incudes surcharge)
_________________________________ _'
Deleted: $
Commercial - minimum 9.50 t'"" t Deleted: 40.00
Deleted (includes surcharge)
Private sewer systems: New installation �._ ...................................
$199.50<_ �1:
Deleted: 200.00
Deleted: plus County fee
Private sewer system repair ............................................... .........::............. 199.50 surcharge)
- Deleted (incudes
•------------------------------------ Deleted: 200.00
Deleted: plus County fee
F,
F. Electrical Permits
Requirement: State License from Board of Electricity. Note: An owner who actually
occupies or intends to occupy a single family residence is exempt from the licensing
requirement.
Residential - Minimum repairs and alterations,..___________________ __ $,139.50 Deleted: (includes surcharge)
Deleted: 40.00
Complete installation• •• •: _• :•: •......:.......•••_ $ 90.00----- Deleted: (includes surcharge)
Commercial - 1.5% of contract/valuation price up to $10,000 and 1.0% of contract/valuation
price above $10,000 ---- Deleted: plus surcharge (.0005
times contractNaluation)
Commercialminimumr ............................,..........:___:_•,,,___.• $39.50 Deletcd:(inaudessurcharge)
-----------------
Deleted: 40.00
G. Well Permits
Effective February 1, 1989, all well permits are issued by Dakota County.
H. Manufactured Home Inspections
Installation permit ................... _________r_.c:..••.•••.•.r•r.•.•••......c•.......•........... $89.54Deleted:(inaudessurcharge)
Deleted: 90.00
Separate permit for electrical hookup......... ............................... .. 9.50_---_---_
-------_"-
•••••�__- -- Deleted:........
I. Swimming Pools Deleted:
Deleted: 40.00
All in-ground pools, regardless of capacity, and above-ground pools that exceed 5,000
gallons.....::.:.... ..:._.:........_..._ ... _u.....r...._....................c.c..................$ 49 5Q -- Deleted: (incudes surcharge)
Deleted:
J. Zoning Permit...........................................................................$,20.00 Deleted: 50.00
Deleted:
K. Signs
Permanent installation..............................................................._..._..._..:._.$ 75.00 Deleted:(No surcharge),
Temporary installation (10 days only),....--- ....--------
..................................
$' 50.00 Deleted:
Deleted:(No surcharge)
L. Moving Structure Dem:
(plus letter of creditor cash escrow) ,.,...:. _........................:....................125.00-_----_---- _____ Deleted: (No surcharge)
M. Demolition De1°t°d`
1. Residential Accessory structures...................................... No Charge
2. All structures other than residential accessory ..................$x49.54 _; Deleted:
(Also requires a $2,000 site restoration escrow) Deleted: 50.00
N. Fire Systems
Fire Line - One percent of contract/valuation price- --- Deleted: plus surcharge (.0005
------------------------------------------------
times¶
contract/valuation)
3
O. Sprinkler Fire Protection
Requirement: State Fire Protection Contractor License to be filed with the City. 1.5% of
contracbvaluation price up to $10,000 and 1.0% of contract/valuation price above $10,004:
plus surcharge (.0005
Gmescont racWaluation)
Formatted: Font: Not Italic
P. Miscellaneous Commercial Mechanical
Formatted: Font: Not italic
Refrigeration, piping, fuel tanks, etc. - 1.5% of contracbvaluation price up to $10,000 and
Deleted: ,,des surchag
1 % of the contract(valuation price in excess of $10,000 ____________ ----------------------
Formatted: Font: Not Italic
................................... ....
Minimum, ................. ............................................................. ....$39.50-----
�
Deleted: plus
c-----
Deleted: surcharge (0005 times
Q. Miscellaneous (re -inspections) Inspections:
contracUvaluation)
$55.00/hr., minimum 1 hour
Deleted: q
Deleted: (includes surcharge)
R. Re -Roof, Re -Side, end retaining walls over 4 feet high ------------------------
Deleted: 40.00
Residential..::::_:::::::::::::::::::::::::::::::::::::::::::::$ 49.5Q
_""""__""__"-�"-"-
Deleted:
.:::::::..::::::----'--"
Commercial r : .:::::::::::::::::,,:::::::::::::::::.:..,..:::::::_::::::::::::�.... $,149.50
Deleted: (includes surcharge).
Deleted: 50.00
S. Windows —Comprehensive or Egress
Deleted: (includes surcharge)
1. Residential 49.5
Deleted:
::::::
2. Commercial X149.50
::..::::.:::...........::::_:::._....._.. _::u::::u_Y__-::
Deleted: 150.00
.. .
Deleted: (includes surcharge)
Deleted:
�T. Inspections after hours (weekends, Holidays) ............... $110.00/hr., minimum 1 hour ',. ,;;,
Deleted: 50.00
Only if an Inspector is available for requested inspection
Deleted: (includes surcharge)
Deleted:..
U. InvestlgatlOn Fee
Whenever any work for which a permit is required by Code has been commenced without
first obtaining said permit the investigation fee shall be equal to the amount of permit fee
4
N
Deleted: 150.00
Deleted: T. Residential
Improvements¶
9
<#>Pennit Fee limitation on minor
residential improvements for the
installation, or replacement of a
residential fixture or appliance that:¶
4
<#>does not require modification to
electric or gas service;$
<#>has a total cost of $500 or less,
excluding the cost of the fixture or
appliance; and¶
<#>is improved, installed, or replaced
by the home owner or a licensed
contractor.¶
9
<#>Residential Improvement Permit
fee will be $15 or 5 percent of the
cost of the improvement, installation,
or replacement, whichever is greater.%
Deleted: U
Formatted: Indent: left: 0.5"
Formatted: Bullets and Numbering
Formatted: Normal
III. PLANNING AND ZONING
Note: Services performed by City personnel will be billed at 2.5 times actual payroll hourly
rate. Services provided by City consultant will be billed at current consultant rates.
A. Platting (Also refer to Section VII)
Sketch Plan Review - $ 2,000 escrow for legal notices, planning, engineering and legal
services provided by staff and/or consultants.
Preliminary Plat - $ 400.00 per addition. In addition to the fee, a $ 2,000 escrow is to be
paid for legal notices, planning, engineering and legal services provided by staff and/or
consultants.
Final Plat - $ 250.00 per addition. In addition to the fee, a $ 2,000 escrow is to be paid for
planning, engineering and legal services provided by staff and/or consultants.
B. Planned Unit Development - $ 500.00 plus $2,000 escrow for legal notices, planning,
engineering and legal services provided by staff and/or consultants.
C. PUD Amendment - $ 500.00 plus $ 1,000.00 escrow for legal notices, planning,
engineering and legal services provided by staff and/or consultants.
D. Variance
1) Single family (includes legal notice publications) .......................... $250.00
2) All others, plus $ 1,000.00 escrow for legal notices, planning, engineering and legal
services provided by staff and/or consultants....... $ 500.00
E. Conditional Use Permit/CUP Amendment
1) Single family ................................................. $ 300.00 plus
$500.00 escrow for legal notices, planning, engineering and legal services
provided by staff and/or consultants.
2) All others, plus $ 1,000.00 escrow for legal notices, planning, engineering and
legal services provided by staff and/or consultants ..............$ 500.00
F. Conditional Use Permit Extension .... $50.00 — 15' Extension; $300.00 Additional
Extensions
G. Home Occupation Permit........................................................... $ 50.00
H. Interim Use Permit/IUP Amendment —
1) Single family ...................... $ 300.00 plus $500.00 escrow for legal notices,
planning, engineering and legal services provided by staff and/or consultants.
2) All others, plus $ 1,000.00 escrow for legal notices, planning, engineering and
legal services provided by staff and/or consultants ...................$ 500.00
I. Rezoning - $500.00 plus $1,000 escrow for legal notices, planning, engineering and
legal services provided by staff and/or consultants
J. Special Home Occupation Permit - (includes legal notice publications) ... $300.00
K. Administrative Subdivision - $500.00 plus all applicable dedication requirements and
$1,000.00 escrow for planning, engineering and legal services provided by staff and/or
consultants
L. Street and Easement Vacations - $200.00 plus $1,000.00 escrow for legal notices,
planning, engineering and legal services provided by staff and/or consultants
M. Zoning Ordinance Text Amendment - $500.00 plus $2,000.00 escrow for legal
notices, planning, engineering and legal services provided by staff and/or consultants
N. Lot Release.............................................................................. $50.00
O. Parkinq Deferment - $100.00 plus $1,000.00 escrow for planning, engineering and
legal services provided by staff and/or consultants
P. Comprehensive Plan Amendment - $500.00 plus $2,000.00 escrow for legal notices,
planning, engineering and legal services provided by staff and/or consultants
Q. Site Plan - $100.00 plus $1,000.00 escrow for planning, engineering and legal
services provided by staff and/or consultants
R. Administrative Permit (per City Ordinance 11-8-3) ................ $ 100.00
IV. ENGINEERING
A. Platting
Sketch plan review
Services performed by City personnel will be hourly and
billed at 2.5 times actual payroll hourly rate applied to the
Planning and Zoning escrows.
Preliminary Plat -
$150.00/acre............................................. $ 500.00 minimum
$3,200.00 maximum
Final Plat - $150.00/acre....................................................... $ 500.00 maximum
B. Construction Plan Review
0
Site, grading, drainage, utility and street plan and specifications review
Services performed by City Personnel will be hourly and billed at 2.5 times actual
hourly rate. A cash escrow may be required (if not collected through Planning and
Zoning).
C. Wetland Conservation Act Administration (platting or non -platting action)
Permit to fill a wetland as allowed by the Wetland Conservation Act $75.00
Services performed by City Personnel in administering the Wetland Conservation Act will
be billed at 2.5 times the actual payroll hourly rate. A minimum escrow of $250.00 will be
required (if not collected through Planning and Zoning actions) for: Wetland
delineation/delineation review, replacement plan review, mailings and administration,
construction inspection and annual monitoring until successful establishment of mitigation
area.
In addition to the above fees, a deposit will be required to fund special studies such as
environmental assessment worksheets, transportation, drainage, noise impacts, indirect source
permits, etc. The amount of deposit to be based on the site, complexity, diversity and location of
the project.
Wetland Determination .....................
$100.00
Plus staff time
Wetland Exemption Application ..............
$200.00
Plus staff time
Wetland Replacement ......................
$300.00
Plus staff time
Wetland Application ........................
$300.00
Plus staff time
Wetland Banking Application ................
$300.00
Plus staff time
Wetland Certificate of Compliance ............
$200.00
Plus staff time
Wetland Appeal of Notice of Decision .........
$300.00
Plus staff time
Wetland Violation ..........................
$500.00
Plus staff time
D. General Engineering
1. Developer Installed Improvements:
A. Engineering contract administration - 3.0% of project construction cost* or 3.25% of
security in the form of a cash disbursement agreement
* Assumes normal construction conditions and project scheduling
B. Construction observation and final inspection hourly as charged by City's consultant.
Services performed by City personnel will be hourly and billed at 2.5 times actual
payroll hourly rate.
C. City record and base map preparation — GIS fee...................$75 parcel/lot
2. City Installed Improvements:
A. Engineering contract administration - 2.0% of project construction cost
B. Preliminary report - as charged by consultants or 20% of design fee if performed by
City staff
C. Final design - as charged by consultants or as per standard ASCE fee curve if
performed by City staff
D. Construction observation and final inspection - hourly as charged by City's
consultant. Services performed by City personnel will be hourly and billed at 2.5
times actual payroll hourly rate.
Ordinance shall be effective immediately following its passage and adoption.
Adopted this 17,%day of May, 2014 by the City Council of the City of Lakeville, Minnesota,
CITY OF LAKEVILLE
By:
Holly Dahl, Mayor
ATTEST:
Charlene Friedges, City Clerk
Formatted: Superscript
Deleted: 21'
Deleted: December
Deleted: 09
i
ORDINANCE NO.
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
AN ORDINANCE ADOPTING FEES
THE CITY COUNCIL OF THE CITY OF LAKEVILLE, MINNESOTA ORDAINS:
I. LICENSES
A. Billboard:
1. Double-faced .............................................. $ 100.00
2. Single -faced ............................................... $ 50.00
3. Illuminated ................................................. $ 25.00
II. PERMITS
A. Building Permits
$1.00 to $500.00
$501.00 to 2,000.00
$2,001.00 to $25,000.00
$25, 001.00 to $50,000.00
$50,001.00 to $100,000.00
$100,001.00 to $500,000.00
$500,001.00 to $1,000,000.00
$1,000,001.00 and up
$30.00
$30.00 for the first $500.00 plus $3.25 for each additional $100.00, or
fraction thereof, to and including $2,000.00
$73.75 for the first $2,000.00 plus $14.75 for each additional $1,000.00, or
fraction thereof, to and including $25,000.00
$413.00 for the first $25,000 plus $10.75 for each additional $1,000.00, or
fraction thereof, to and incuding $50,000.00
$681.75 for the first $50,000.00 plus $7.50 for each additional $1,000.00, or
fraction thereof, to and including $100,000.00
$1056.75 for the first $100,000.00 plus $6.00 for each additional $1,000.00,
or fraction thereof, to and including $500,00.00
$3,456.75 for the first $500,000.00 plus $5.00 for each aditional $1,000.00,
or fraction thereof, to and including $1,000,000.00
$5,956.75 for the first $1,000,000.00 plus $4.00 for each additional
$1,000.00, or fraction thereof
B. Plan Check Fees
65% of building permit fee for permits with valuations greater than $10,000.
25% of building permit fee for permits issued for similar buildings as required by State
Building Code.
C. Plumbing Permits
Requirement: Master License Number or pipe layers certificate, $25, 000 license bond and current
Certificate of Liability Insurance to be filed with City. Note: State Department of Health Bond and
Insurance Certificate will satisfy this requirement.
Residential - Minimum
(repairs and alterations, lawn sprinkler systems) ............................. $ 39.50
Complete installation........................................................................ $ 90.00
Commercial - 1.5% of contract/valuation price up to $10,000 and 1.0% of contract/valuation
price above $10,000
Commercial - Minimum..................................................................... $ 39.50
RPZValve (new)......................................................................................... $ 39.50
RPZ Valve (replacement or rebuild)............................................................ $ 39.50
Water Softener/Water Heater.....................................................................$ 39.50
D. Heating Permits
Residential - Minimum repairs and alterations .................................. $ 39.50
Complete installation........................................................................ $ 90.00
Commercial - 1.5% of contract/valuation price up to $10,000 and 1.0% of contract/valuation
price above $10,000
Commercial minimum........................................................................... $ 39.50
E. Sewer and Water Permits
Requirement: Master License Number, $25, 000 License Bond and current Certificate of Liability
Insurance to be filed with City. Note: State Department of Health Bond and Insurance Certificate
will satisfy this requirement.
Residential - Minimum repairs and alterations ............................................$ 39.50
City water and sewer including conversion ...............................................$ 90.00
Commercial - One percent (1 %) of contract/valuation price
Commercial - minimum................................................................. $ 39.50
Private sewer systems: New installation ...................................... $199.50
Private sewer system repair...................................................................$199.50
2
F. Electrical Permits
Requirement: State License from Board of Electricity. Note: An owner who actually
occupies or intends to occupy a single family residence is exempt from the licensing
requirement.
Residential - Minimum repairs and alterations ............................... $ 39.50
Complete installation..................................................................... $ 90.00
Commercial - 1.5% of contract/valuation price up to $10,000 and 1.0% of contract/valuation
price above $10,000
Commercialminimum..................................................................... $ 39.50
G. Well Permits
Effective February 1, 1989, all well permits are issued by Dakota County.
H. Manufactured Home Inspections
Installationpermit................................................................................... $ 89.50
Separate permit for electrical hookup ..................................................$ 39.50
I. Swimming Pools
All in -ground pools, regardless of capacity, and above -ground pools that exceed 5,000
gallons.........................................................................................$ 49.50
J. Zoning Permit..........................................................................$ 20.00
K. Signs
Permanent installation..............................................................................$ 75.00
Temporary installation (10 days only) ...................................................... $ 50.00
L. Moving Structure
(plus letter of credit or cash escrow) .......................................................$125.00
M. Demolition
1. Residential Accessory structures ...................................... No Charge
2. All structures other than residential accessory .................. $ 49.50
(Also requires a $2,000 site restoration escrow)
N. Fire Systems
Fire Line - One percent of contract/valuation price
3
I
O. Sprinkler Fire Protection
Requirement: State Fire Protection Contractor License to be filed with the City. 1.5% of
contract/valuation price up to $10,000 and 1.0% of contract/valuation price above $10,000.
.Minimum.............................................................................................. $ 39.50.
P. Miscellaneous Commercial Mechanical
Refrigeration, piping, fuel tanks, etc. - 1.5% of contract/valuation price up to $10,000 and
1 % of the contracbva/uation price in excess of $10,000
Minimum.................................................................................................$ 39.50
Q. Miscellaneous (re -inspections) Inspections:
$55.00/hr., minimum 1 hour
R. Re -Roof, Re -Side, and retaining walls over 4 feet high
Residential.............................................................................................$ 49.50
Commercial........................................................................................... $149.50
S. Windows — Comprehensive or Egress
1. Residential....................................................................... $ 49.50
2. Commercial..................................................................... $149.50
T. Inspections after hours (weekends, Holidays) ............... $110.00/hr., minimum 1 hour
Only if an Inspector is available for requested inspection
U. Investigation Fee
Whenever any work for which a permit is required by Code has been commenced without
first obtaining said permit the investigation fee shall be equal to the amount of permit fee
rd
III. PLANNING AND ZONING
Note: Services performed by City personnel will be billed at 2.5 times actual payroll hourly
rate. Services provided by City consultant will be billed at current consultant rates.
A. Platting (Also refer to Section VII)
Sketch Plan Review - $ 2,000 escrow for legal notices, planning, engineering and legal
services provided by staff and/or consultants.
Preliminary Plat - $ 400.00 per addition. In addition to the fee, a $ 2,000 escrow is to be
paid for legal notices, planning, engineering and legal services provided by staff and/or
consultants.
Final Plat - $ 250.00 per addition. In addition to the fee, a $ 2,000 escrow is to be paid for
planning, engineering and legal services provided by staff and/or consultants.
B. Planned Unit Development - $ 500.00 plus $2,000 escrow for legal notices, planning,
engineering and legal services provided by staff and/or consultants.
C. PUD Amendment - $ 500.00 plus $ 1,000.00 escrow for legal notices, planning,
engineering and legal services provided by staff and/or consultants.
D. Variance
1) Single family (includes legal notice publications) .......................... $250.00
2) All others, plus $ 1,000.00 escrow for legal notices, planning, engineering and legal
services provided by staff and/or consultants....... $ 500.00
E. Conditional Use Permit/CUP Amendment
1) Single family. . . . . . . . . . . . . . . . . . . . . . . . . . . $ 300.00 plus
$500.00 escrow for legal notices, planning, engineering and legal services
provided by staff and/or consultants.
2) All others, plus $ 1,000.00 escrow for legal notices, planning, engineering and
legal services provided by staff and/or consultants ..............$ 500.00
F. Conditional Use Permit Extension .... $50.00 — 1St Extension; $300.00 Additional
Extensions
G. Home Occupation Permit........................................................... $ 50.00
H. Interim Use Permit/IUP Amendment —
1) Single family ...................... $ 300.00 plus $500.00 escrow for legal notices,
planning, engineering and legal services provided by staff and/or consultants.
2) All others, plus $ 1,000.00 escrow for legal notices, planning, engineering and
legal services provided by staff and/or consultants ...................$ 500.00
5
I. Rezoning - $500.00 plus $1,000 escrow for legal notices, planning, engineering and
legal services provided by staff and/or consultants
J. Special Home Occupation Permit - (includes legal notice publications) ... $300.00
K. Administrative Subdivision - $500.00 plus all applicable dedication requirements and
$1,000.00 escrow for planning, engineering and legal services provided by staff and/or
consultants
L. Street and Easement Vacations - $200.00 plus $1,000.00 escrow for legal notices,
planning, engineering and legal services provided by staff and/or consultants
M. Zoning Ordinance Text Amendment - $500.00 plus $2,000.00 escrow for legal
notices, planning, engineering and legal services provided by staff and/or consultants
N. Lot Release.............................................................................. $50.00
O. Parking Deferment - $100.00 plus $1,000.00 escrow for planning, engineering and
legal services provided by staff and/or consultants
P. Comprehensive Plan Amendment - $500.00 plus $2,000.00 escrow for legal notices,
planning, engineering and legal services provided by staff and/or consultants
Q. Site Plan - $100.00 plus $1,000.00 escrow for planning, engineering and legal
services provided by staff and/or consultants
R. Administrative Permit (per City Ordinance 11-8-3) ................ $ 100.00
IV. ENGINEERING
A. Platting
Sketch plan review
Services performed by City personnel will be hourly and
billed at 2.5 times actual payroll hourly rate applied to the
Planning and Zoning escrows.
Preliminary Plat -
$150.00/acre............................................. $ 500.00 minimum
$3,200.00 maximum
Final Plat - $150.00/acre....................................................... $ 500.00 maximum
B. Construction Plan Review
2
Site, grading, drainage, utility and street plan and specifications review
Services performed by City Personnel will be hourly and billed at 2.5 times actual
hourly rate. A cash escrow may be required (if not collected through Planning and
Zoning).
C. Wetland Conservation Act Administration (platting or non -platting action)
Permit to fill a wetland as allowed by the Wetland Conservation Act $75.00
Services performed by City Personnel in administering the Wetland Conservation Act will
be billed at 2.5 times the actual payroll hourly rate. A minimum escrow of $250.00 will be
required (if not collected through Planning and Zoning actions) for: Wetland
delineation/delineation review, replacement plan review, mailings and administration,
construction inspection and annual monitoring until successful establishment of mitigation
area.
In addition to the above fees, a deposit will be required to fund special studies such as
environmental assessment worksheets, transportation, drainage, noise impacts, indirect source
permits, etc. The amount of deposit to be based on the site, complexity, diversity and location of
the project.
Wetland Determination .....................
$100.00
Plus staff time
Wetland Exemption Application ..............
$200.00
Plus staff time
Wetland Replacement ......................
$300.00
Plus staff time
Wetland Application ........................
$300.00
Plus staff time
Wetland Banking Application ................
$300.00
Plus staff time
Wetland Certificate of Compliance ............
$200.00
Plus staff time
Wetland Appeal of Notice of Decision .........
$300.00
Plus staff time
Wetland Violation ..........................
$500.00
Plus staff time
D. General Engineering
1. Developer Installed Improvements:
A. Engineering contract administration - 3.0% of project construction cost* or 3.25% of
security in the form of a cash disbursement agreement
* Assumes normal construction conditions and project scheduling
B. Construction observation and final inspection hourly as charged by City's consultant.
Services performed by City personnel will be hourly and billed at 2.5 times actual
payroll hourly rate.
C. City record and base map preparation — GIS fee...................$75 parcel/lot
2. City Installed Improvements:
rA
A. Engineering contract administration - 2.0% of project construction cost
B. Preliminary report - as charged by consultants or 20% of design fee if performed by
City staff
C. Final design - as charged by consultants or as per standard ASCE fee curve if
performed by City staff
D. Construction observation and final inspection - hourly as charged by City's
consultant. Services performed by City personnel will be hourly and billed at 2.5
times actual payroll hourly rate.
Ordinance shall be effective immediately following its passage and adoption.