Loading...
HomeMy WebLinkAbout19935 Harvest Dr SurveyZoning = RS-3 ENGINEERING REVIEWED DATE: 03/07/2019 smurphy The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION * Drain tile connection is required * Structures may not be placed within easements