HomeMy WebLinkAbout19935 Harvest Dr SurveyZoning = RS-3
ENGINEERING REVIEWED
DATE: 03/07/2019 smurphy
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
* Drain tile connection is required
* Structures may not be placed within easements