CITY OF LAKEVILLE
PLANNING COMMISSION MEETING MINUTES
March 7, 2019
Chair Kaluza called the meeting to order at 6:00 p.m. in the Council Chambers at City
Hall. The pledge of allegiance to the flag was given.
Members Present: Chair Pat Kaluza, Vice Chair Jason Kelvie, Karl Drotning, Jason
Swenson, Brooks Lillehei, Scott Einck, Paul Jarvis, Ex-officio Mike Lamm
Members Absent: Jeff Witte
Others Present: Daryl Morey, Planning Director; Frank Dempsey, Associate Planner;
Kris Jenson, Associate Planner; Brent Jones, Planning and Zoning Specialist; Joe
Powers, Project Engineer; Penny Brevig, Recording Secretary
3. Approval of the Meeting Minutes
The February 21, 2019 Planning Commission meeting minutes were approved as
presented.
4. Announcements
Mr. Morey stated that the following handouts were distributed at tonight’s meeting:
1. An e-mail that was received on March 4th from the owner of The Moments of
Lakeville agreeing to combine Lots 1 and 2, thus eliminating the need for the
Zoning Ordinance amendment and modifying the CUP.
2. Amended Stipulations and Findings of Fact for The Moments of Lakeville
5. Independent School District #194
Chair Kaluza opened the public hearing to consider the application of ISD #194 for an
amendment to conditional use permit 91-02 to allow the construction of a classroom
addition to Cherry View Elementary School, located at 8600 – 175th Street.
Beth Louden, ISD #194 Director of Facilities and Sean Kelly, Wold Architects and
Engineers were in attendance at tonight’s meeting. Ms. Louden indicated that they
are fast tracking this addition because of the rapid growth within the Cherry View
Elementary enrollment area. Current enrollment is 645 students and the projected
enrollment is 807 students. They would like to break ground March 26th and move
into the addition over MEA weekend in October. Mr. Kelly indicated that the
approximate 15,000 square foot addition will include two separate areas on the
southeast side of the current building.
Planning Commission Meeting Minutes, March 7, 2019 Page 2
Planning and Zoning Specialist Brent Jones presented the planning report. Mr. Jones
stated that the proposed expansion to the southeast side of the existing school
building will be over an existing grassy area facing Highview Avenue and include the
construction of classrooms, conference rooms, and bathrooms off an extension of two
connecting hallways.
The building meets all setback requirements of the RS-2 District. The height of the
building addition will match the existing building. The property currently has 143
parking spaces, which exceeds the Zoning Ordinance requirement of 116 parking
spaces given the projected enrollment of 807 students. The driveway access will
remain unaffected by the proposed addition.
Mr. Jones indicated that there are 18 new trees proposed to be planted adjacent to
the addition to replace the 18 trees that will be removed for construction of the addition.
The existing pathways located near the proposed addition will be reconfigured to
accommodate the proposed addition.
Mr. Jones stated that City staff recommends approval of the Cherry View Elementary
CUP amendment, subject to the five stipulations listed in the February 27, 2019
planning report, and adoption of the Findings of Fact dated March 7, 2019.
Chair Kaluza opened the hearing to the public for comment.
Comments from the audience.
Wayne Lunke, 8615 176th Street W.
• Mr. Lunke’s home is right behind the proposed addition to the school. He asked
for clarification as to the location of the addition compared to where his home
is located.
Harry Veldhuis, 17459 Horseshoe Way
• Mr. Veldhuis asked what the hours of operation are for construction of the
addition.
Motion was made by Kelvie, seconded by Einck to close the public hearing at
6:08 p.m.
Voice vote was taken on the motion. Ayes - unanimous
Chair Kaluza asked staff to answer Mr. Lunke’s and Mr. Veldhuis questions regarding
the location of the addition and the hours of construction. Mr. Jones explained where
the addition would line up compared to the neighboring properties to the south. The
hours of operation for construction is 7:00 am to 10:00 pm.
Chair Kaluza asked for comments from the Planning Commission. Comments
included:
Planning Commission Meeting Minutes, March 7, 2019 Page 3
• Commissioner Kelvie asked how far out does the school district project for
future expansions. Ms. Louden stated that they usually look five to ten years
out, but their projections were a little off this time. They are hoping this
expansion will address enrollment projections for a couple more years, after
which they may consider construction of a new elementary school.
• Parking requirements and landscape screening were discussed.
• Ms. Louden explained that they chose this location for the building addition
because the existing playground, fields and parking lots won’t be disturbed and
the addition meets setback requirements.
Mr. Morey indicated that the proposed landscape plan does show that they are
planning to add trees to the south side of the property, but staff could look at a different
tree species, not additional trees, that would be a better screening material. This could
be looked at prior to City Council consideration of the CUP amendment.
Motion was made by Drotning, seconded by Swenson to recommend to City
Council approval of the ISD #194 amendment to conditional use permit 91-02 to allow
the construction of a classroom addition to Cherry View Elementary School, located
at 8600 – 175th Street, subject to the following stipulations and adoption of the Findings
of Fact dated March 7, 2019:
1. A financial security in the amount of $137,849.40 shall be submitted prior to the
issuance of a building permit for the addition.
2. The site plan and building addition shall be developed in accordance with the plans
approved by the City Council.
3. A building permit is required prior to commencing construction of the building
addition.
4. The building addition is subject to review by the Fire Marshal.
5. Lighting shall be down-cast type only and must comply with Section 11-16-17 of
the Zoning Ordinance. Detailed fixture and photometric plans must be submitted
with the building permit application for the proposed addition.
Ayes: Swenson, Einck, Lillehei, Kaluza, Kelvie, Drotning
Nays: 0
6. Berean Baptist Church
Chair Kaluza opened the public hearing to consider the application of Berean Baptist
Church for the following, located east of Holyoke Avenue, north of Heritage Drive, and
west of Highview Avenue: A. Preliminary plat of one lot and five outlots; B. Conditional
use permit to allow: 1) a religious institution (church) in the RS-3, Single Family
Residential District and 2) a building height greater than 35 feet; and C. Vacation of
public road and drainage and utility easements.
Tony Manning, Executive Pastor at the Berean Baptist Church in Burnsville indicated
that they would like to build a second campus in a city where a lot of their parishioners
live rather than enlarge the current building in Burnsville. They hope to be good
neighbors and looking forward to being a part of the City of Lakeville.
City of Lakeville
Planning Department
Memorandum
To: Planning Commission
From: Brent Jones, Planning & Zoning Specialist
Date: February 27, 2019
Subject: Packet Material for the March 7, 2019 Planning Commission Meeting
Agenda Item: Cherry View Elementary School Conditional Use Permit Amendment
Application Action Deadline: April 9, 2019
INTRODUCTION
Representatives of ISD #194 are requesting an amendment to CUP #91-02 to allow an
expansion to the Cherry View Elementary School building, located at 8600 – 175th Street. The
proposed addition will include two separate areas totaling 15,394 square feet on the southeast
side of the existing 77,602 square foot building. The existing school was constructed in 1991.
The subject property is zoned RS-2, Single Family Residential District. Section 11-51-7D of
the Zoning Ordinance allows public elementary schools in the RS-2 District by conditional
use permit.
EXHIBITS
A. Aerial Photo Map
B. Location/Zoning Map
C. Topographic Survey
D. Grading, Drainage, and Erosion Control Plan
E. Paving, Geometric, and Utility Plan
F. Landscape Plan (2 pages)
G. Floor Plan
H. Exterior Elevations
2
PLANNING ANALYSIS
The proposed 15,394 square foot expansion to the southeast side of the existing elementary
school building will be over an existing grassy area facing Highview Avenue. The project
includes the construction of classrooms, conference rooms, and bathrooms off an extension of
the two connecting hallways. The proposed expansion was reviewed for conformance with
Zoning Ordinance performance standards as follows:
Surrounding Land Uses and Zoning
North –175th Street and Single Family Homes (RS-3)
South – Single Family Homes (RS-2)
East – Highview Avenue and Single Family Homes (RS-2)
West – Single Family Homes (RS-2)
Building Setbacks. The existing building meets all setback requirements of the RS-2 District:
Front – 30 feet
Side – 15 feet, 30 feet on the side yard abutting a public right of way
Rear – 30 feet
The proposed building addition will have the following setbacks:
Rear (south) – 30.3 feet
Side (east) abutting a public right-of-way –131 feet
Building Height. The building addition is a single story and 14 feet in height to match the
existing building and will not exceed the maximum building height of 35 feet allowed in the
RS-2 District.
Access and Circulation. The site is accessed via a full access driveway at 175th Street and a new,
exit-only driveway at Highview Avenue. The property access will remain unaffected by the
proposed addition.
Parking. According to ISD 192, the current enrollment is 645 students and the projected
enrollment is 807 students. The Zoning Ordinance requires one parking space per seven
students, which equals 116 parking spaces at a ratio of one space per each seven students
based on the projected enrollment. The property currently has 143 parking spaces, which
exceeds Zoning Ordinance requirements.
Trails and Sidewalks. The existing pathways located near the proposed addition will be
reconfigured to accommodate the addition.
3
Building Elevations and Exterior Building Materials. The proposed building addition will
be sided with grey brick to match the existing building. The proposed building materials meet
the requirements for an institutional use in the RS-2 District.
Landscaping. There are 18 new trees proposed to be planted around the addition to replace the
18 trees that will be removed for construction. The proposed landscaping meets Zoning
Ordinance requirements.
Signs. There is no new signage proposed with the addition.
Mechanical Equipment. There is additional mechanical equipment proposed with the
building addition that will be located on the roof and screened in compliance with Zoning
Ordinance requirements.
Trash Enclosure. There is an existing, compliant trash enclosure on the northwest side of the
building.
Lighting. Numerous exterior lights are proposed on the building exterior. Lighting shall be
down-cast type only and must comply with Section 11-16-17 of the Zoning Ordinance.
Detailed fixture and photometric plans must be submitted with the Building Permit
application for the proposed addition.
Engineering Review. The Engineering Department has reviewed the plans and prepared a
memorandum dated February 27, 2019, which references the need for a financial security in
the amount of $137,849.40 prior to the issuance of a Building Permit for the addition.
RECOMMENDATION
Planning Department staff recommends approval of the Cherry View Elementary School
conditional use permit amendment located at 8600 – 175th Street subject to the following
stipulations:
1. A financial security in the amount of $137,849.40 shall be submitted prior to the issuance
of a Building Permit for the addition.
2. The site plan and building addition shall be developed in accordance with the plans
approved by the City Council.
3. A building permit is required prior to commencing construction of the building
addition.
4. The building addition is subject to review by the Fire Marshal.
4
5. Lighting shall be down-cast type only and must comply with Section 11-16-17 of the
Zoning Ordinance. Detailed fixture and photometric plans must be submitted with the
Building Permit application for the proposed addition.
Cherry View Elementary School - CUP Amendment
Property Information
Februa ry 26, 2 019
0 875 1,750437.5 ft
0 270 540135 m
1:9,600
Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification.
±HIBISCUS AVE175TH ST
HYDE PARK AVEHIGHVIEW AVEHEIDELBERG WAY176TH ST HONEYSUCKLE AVEHOLLAND AVEHYDE PARK AVEHORESHOE WAYHOLLYBROOK TRL
CHERRY VIEW
ELEMENTARY
SCHOOL SITE
RS -2
RS -2
RS -2
RS -2
RS -3
RS -3
City o f LakevilleCherry ViewElementary SchoolCUP AmendmentEXHIBIT B
RS -2
P/OS
C0.0TOPOGRAPHICSURVEYFEDCBA12345678NorthCheck:Drawn:Date:Comm:2019 BKBM Professional Engineers, Inc.All rights reserved.This document is an instrument of service and is the property of BKBMProfessional Engineers, Inc. and may not be used or copied withoutprior written consent.BKBM JOB NUMBER: 19183CIndependent SchoolDistrict #194Cherry ViewElementary 2018DeferredMaintenance17685 Juniper Path, Suite 300Lakeville, MN 55044NPASR02/08/201919183RevisionsDescriptionDateNum8600 175th Street WestLAKEVILLE, MN 55044
HIGHVIEW AVENUE BUILDINGBENCHMARK-SPIKEELEV=1044.3950.050.030.3
131.0C2.0GRADING,DRAINAGE, ANDEROSION CONTROLPLANwww.bkbm.com6120 Earle Brown Drive, Suite 70 Minneapolis, MN 55430Phone: (763) 843-0420Fax: (763) 843-0421BKBMENGINEERSFEDCBA12345678NorthCheck:Drawn:Date:Comm:License Number:DateI hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and that I ama duly Licensed Professional Engineer under the laws of theState of Minnesota.2019 BKBM Professional Engineers, Inc.All rights reserved.This document is an instrument of service and is the property of BKBMProfessional Engineers, Inc. and may not be used or copied withoutprior written consent.BKBM JOB NUMBER: 19183CIndependent SchoolDistrict #194Cherry ViewElementary 2019Addition17685 Juniper Path, Suite 300Lakeville, MN 55044NPASR02/08/201919183RevisionsDescriptionDateNum8600 175th Street WestLAKEVILLE, MN 55044DD SETNOT FOR CONSTRUCTION
HIGHVIEW AVENUE BUILDINGBENCHMARK-SPIKEELEV=1044.3950.050.030.3
131.0C3.0PAVING,GEOMETRIC, ANDUTILITY PLANwww.bkbm.com6120 Earle Brown Drive, Suite 70 Minneapolis, MN 55430Phone: (763) 843-0420Fax: (763) 843-0421BKBMENGINEERSFEDCBA12345678NorthCheck:Drawn:Date:Comm:License Number:DateI hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and that I ama duly Licensed Professional Engineer under the laws of theState of Minnesota.2019 BKBM Professional Engineers, Inc.All rights reserved.This document is an instrument of service and is the property of BKBMProfessional Engineers, Inc. and may not be used or copied withoutprior written consent.BKBM JOB NUMBER: 19183CIndependent SchoolDistrict #194Cherry ViewElementary 2019Addition17685 Juniper Path, Suite 300Lakeville, MN 55044NPASR02/08/201919183RevisionsDescriptionDateNum8600 175th Street WestLAKEVILLE, MN 55044DD SETNOT FOR CONSTRUCTION
UG 62
CLASS FLEX
CLASS
(KIDZONE)
CLASS
CLASS
CLASS
(SPED)
CLASS
(SPED)
CLASSCLASSCLASS
ADMINISTRATION
GYMNASIUM
CAFETERIA
MEDIA CENTER
MUSIC ART EXISTINGNEWEXISTINGNEWCOMMONS
MAIN ENTRY
BUS LOOP ENTRY
CLASS
(SENSORY)CLASSROOMSCLASSROOMS
SPECIAL EDUCATION
A4.403B6
KITCHEN
LOADING DOCK EXISTINGNEWEXISTINGNEW_______E1
CUP 3
_______E5
CUP 3
F
E
D
C
B
A
1 2 3 4 5 6 7 8
A
MN
NorthCheck:
Drawn:
Date:
Comm:
License
Number:
I hereby certify that this plan, specification or report was prepared by
me or under my direct supervision and that I am a duly Licensed
under the laws of the State of
Scale:
Date
2/7/2019 2:00:26 PMC:\Users\amalnaa\Documents\CVE 2019 Classroom Addition_amalnaa.rvt1/16" = 1'-0"Central: \\Wae-srv-mn.woldae.com\StPaul\ISD194\ES_Cherry View\182305 CVE 2019 Addition\02_ARCH\Revit\CVE2019 Classroom Addition.rvtIndependent School
District #194
Cherry View
Elementary 2019
Addition
Conditional Use
Permit Set
CUP 2
OVERALL FLOOR
PLAN
17685 Juniper Path, Suite 307,
Lakeville, MN 55044
8600 175th St W,
Lakeville, MN 55044
NOT FOR CONSTRUCTION
SWK
JWP/AJM
2/8/2019
182305
MINNESOTA
2/8/2019
VAUGHN DIERKS
26979
ARCHITECT
0
1/16" = 1'-0"
OVERALL FLOOR PLANF1
12'24'
EXISTING BUILDING AREA: 77,602 SF
PROPOSED ADDITION AREA: 15,394 SF
Revisions
Description Date Num
100' 0"
MAIN LEVEL
114' 0"
T.O. MASONRY
119' 0"
T.O. ROOFTOP MECH.
100' 0"
MAIN LEVEL
114' 0"
T.O. MASONRY
119' 0"
T.O. ROOFTOP MECH.CUP 5B1aCUP 5
B5
CUP 5
C1
CUP 5
C3
CUP 5C5CUP 5C6CUP 5D1CUP 5
D5
CUP 5
E1 CUP 5E4CUP 5E5CUP 5F1CUP 5
F4
CUP 5
F5
AREA B
AREA A
AREA E
AREA D
AREA C
100' 0"
MAIN LEVEL
114' 0"
T.O. MASONRY
119' 0"
T.O. ROOFTOP MECH.
100' 0"
MAIN LEVEL
114' 0"
T.O. MASONRY
119' 0"
T.O. ROOFTOP MECH.
100' 0"
MAIN LEVEL
114' 0"
T.O. MASONRY
100' 0"
MAIN LEVEL
114' 0"
T.O. MASONRY
100' 0"
MAIN LEVEL
114' 0"
T.O. MASONRY
100' 0"
MAIN LEVEL
114' 0"
T.O. MASONRY
100' 0"
MAIN LEVEL
114' 0"
T.O. MASONRY
119' 0"
T.O. ROOFTOP MECH.
100' 0"
MAIN LEVEL
114' 0"
T.O. MASONRY
100' 0"
MAIN LEVEL
114' 0"
T.O. MASONRY
100' 0"
MAIN LEVEL
114' 0"
T.O. MASONRY
119' 0"
T.O. ROOFTOP MECH.
100' 0"
MAIN LEVEL
114' 0"
T.O. MASONRY
4'-0"100' 0"
MAIN LEVEL
114' 0"
T.O. MASONRY
F
E
D
C
B
A
1 2 3 4 5 6 7 8
A
MN
NorthCheck:
Drawn:
Date:
Comm:
License
Number:
I hereby certify that this plan, specification or report was prepared by
me or under my direct supervision and that I am a duly Licensed
under the laws of the State of
Scale:
Date
2/7/2019 2:58:30 PMC:\Users\amalnaa\Documents\CVE 2019 Classroom Addition_amalnaa.rvtAs indicatedCentral: \\Wae-srv-mn.woldae.com\StPaul\ISD194\ES_Cherry View\182305 CVE 2019 Addition\02_ARCH\Revit\CVE2019 Classroom Addition.rvtIndependent School
District #194
Cherry View
Elementary 2019
Addition
Conditional Use
Permit Set
CUP 5
EXTERIOR
ELEVATIONS
17685 Juniper Path, Suite 307,
Lakeville, MN 55044
8600 175th St W,
Lakeville, MN 55044
NOT FOR CONSTRUCTION
SWK
JWP/AJM
2/8/2019
182305
MINNESOTA
2/8/2019
VAUGHN DIERKS
26979
ARCHITECT
0
1/8" = 1'-0"
AREA D EAST ELEVATIOND1
6'12'
0
1/8" = 1'-0"
AREA D WEST ELEVATIONB1a
6' 12'
METAL COPING TO MATCH EXISTING
GREY BRICK TO MATCH EXISTING
BROWN BRICK TO MATCH EXISTING
EXTERIOR WALL PACK
ALUMINUM STOREFRONT SYSTEM
TO MATCH EXISTING
ROOF TOP MECH. EQUIP. W/
INTEGRAL EQUIP. SCREEN (LOUVER)
TEAL GLAZED BRICK TO MATCH EXISTING
METAL COPING TO MATCH EXISTING
GREY BRICK TO MATCH EXISTING
BROWN BRICK TO MATCH EXISTING
ALUMINUM STOREFRONT SYSTEM
TO MATCH EXISTING
ROOF TOP MECH. EQUIP. W/
INTEGRAL EQUIP. SCREEN (LOUVER)
TEAL GLAZED BRICK TO MATCH EXISTING
0
1/8" = 1'-0"
AREA E SOUTH ELEVATIONB5
6' 12'
0
1/8" = 1'-0"
AREA E NORTH ELEVATIOND5
6' 12'
METAL COPING TO MATCH EXISTING
GREY BRICK TO MATCH EXISTING
BROWN BRICK TO MATCH EXISTING
ALUMINUM STOREFRONT SYSTEM
TO MATCH EXISTING
ROOF TOP MECH. EQUIP. W/
INTEGRAL EQUIP. SCREEN (LOUVER)
TEAL GLAZED BRICK TO MATCH EXISTING
METAL COPING TO MATCH EXISTING
GREY BRICK TO MATCH EXISTING
BROWN BRICK TO MATCH EXISTING
EXTERIOR WALL PACK
ALUMINUM STOREFRONT SYSTEM
TO MATCH EXISTING
ROOF TOP MECH. EQUIP. W/
INTEGRAL EQUIP. SCREEN (LOUVER)
TEAL GLAZED BRICK TO MATCH EXISTING
0
1/8" = 1'-0"
AREA D NORTH ELEVATION A & BC1
6' 12'
0
1/8" = 1'-0"
AREA D NORTH ELEVATION C & DC3
6' 12'
METAL COPING TO MATCH EXISTING
GREY BRICK TO MATCH EXISTING
ALUMINUM STOREFRONT SYSTEM
TO MATCH EXISTING
BROWN BRICK TO MATCH EXISTING
TEAL GLAZED BRICK TO MATCH EXISTING
METAL COPING TO MATCH EXISTING
GREY BRICK TO MATCH EXISTING
ALUMINUM STOREFRONT SYSTEM
TO MATCH EXISTING
BROWN BRICK TO MATCH EXISTING
TEAL GLAZED BRICK TO MATCH EXISTING
0
1/8" = 1'-0"
AREA E WEST ELEVATION AC5
6' 12'
METAL COPING TO MATCH EXISTING
GREY BRICK TO MATCH EXISTING
ALUMINUM STOREFRONT SYSTEM
TO MATCH EXISTING
BROWN BRICK TO MATCH EXISTING
TEAL GLAZED BRICK TO MATCH EXISTING
0
1/8" = 1'-0"
AREA E WEST ELEVATION B & CC6
6' 12'
METAL COPING TO MATCH EXISTING
GREY BRICK TO MATCH EXISTING
ALUMINUM STOREFRONT SYSTEM
TO MATCH EXISTING
BROWN BRICK TO MATCH EXISTING
TEAL GLAZED BRICK TO MATCH EXISTING
0
1/8" = 1'-0"
AREA D SOUTH ELEVATIONE1
6' 12'
METAL COPING TO MATCH EXISTING
GREY BRICK TO MATCH EXISTING
BROWN BRICK TO MATCH EXISTING
EXTERIOR WALL PACK
ALUMINUM STOREFRONT SYSTEM
TO MATCH EXISTING
ROOF TOP MECH. EQUIP. W/
INTEGRAL EQUIP. SCREEN (LOUVER)
TEAL GLAZED BRICK TO MATCH EXISTING
0
1/8" = 1'-0"
AREA D ELEVATION FE5
6' 12'
0
1/8" = 1'-0"
AREA D ELEVATION EE4
6' 12'
EXTERIOR SOFFIT CONDITION
GREY BRICK TO MATCH EXISTING
BROWN BRICK TO MATCH EXISTING
TEAL GLAZED BRICK TO MATCH EXISTING
0
1/8" = 1'-0"
AREA E EAST ELEVATIONF1
6' 12'0
1/8" = 1'-0"
AREA E ELEVATION DF4
6' 12'0
1/8" = 1'-0"
AREA E ELEVATION EF5
6' 12'
METAL COPING TO MATCH EXISTING
GREY BRICK TO MATCH EXISTING
BROWN BRICK TO MATCH EXISTING
EXTERIOR WALL PACK
ALUMINUM STOREFRONT SYSTEM
TO MATCH EXISTING
ROOF TOP MECH. EQUIP. W/
INTEGRAL EQUIP. SCREEN (LOUVER)
TEAL GLAZED BRICK TO MATCH EXISTING
EXTERIOR SOFFIT CONDITION
GREY BRICK TO MATCH EXISTING
BROWN BRICK TO MATCH EXISTING
TEAL GLAZED BRICK TO MATCH EXISTING
EXTERIOR WALL PACKEXTERIOR WALL PACK
PRECAST CONCRETE PANEL TO MATCH EXISTING
PRECAST CONCRETE PANEL TO MATCH EXISTING PRECAST CONCRETE PANEL TO MATCH EXISTING PRECAST CONCRETE PANEL TO MATCH EXISTING
PRECAST CONCRETE PANEL TO MATCH EXISTING
PRECAST CONCRETE PANEL TO MATCH EXISTING
PRECAST CONCRETE PANEL TO MATCH EXISTING
PRECAST CONCRETE PANEL TO MATCH EXISTING PRECAST CONCRETE PANEL TO MATCH EXISTING
PRECAST CONCRETE PANEL TO MATCH EXISTING
Revisions
Description Date Num
•
•
CCHHEERRRRYY VVIIEEWW EELLEEMMEENNTTAARRYY SSCCHHOOOOLL CCOONNDDIITTIIOONNAALL UUSSEE PPEERRMMIITT
FFEEBBRRUUAARRYY 2277,, 22001199
PPAAGGEE 22 OOFF 44
CCHHEERRRRYY VVIIEEWW EELLEEMMEENNTTAARRYY SSCCHHOOOOLL CCOONNDDIITTIIOONNAALL UUSSEE PPEERRMMIITT
FFEEBBRRUUAARRYY 2277,, 22001199
PPAAGGEE 33 OOFF 44
CCHHEERRRRYY VVIIEEWW EELLEEMMEENNTTAARRYY SSCCHHOOOOLL CCOONNDDIITTIIOONNAALL UUSSEE PPEERRMMIITT
FFEEBBRRUUAARRYY 2277,, 22001199
PPAAGGEE 44 OOFF 44