Loading...
HomeMy WebLinkAbout8571 197th Street West-SURVEYZoning = RS-3 EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION ENGINEERING REVIEWED DATE: 02/28/2019 smurphy The curb box, drain tile cleanout and catch basin (if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. * Connection to drain tile is required * Structures may not be placed within easements