HomeMy WebLinkAbout8571 197th Street West-SURVEYZoning = RS-3
EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION
ENGINEERING REVIEWED
DATE: 02/28/2019 smurphy
The curb box, drain tile cleanout and catch basin
(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released.
All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.
* Connection to drain tile is required
* Structures may not be placed
within easements