HomeMy WebLinkAboutItem 08
Date: Item No.
BEREAN BAPTIST CHURCH
PRELIMINARY PLAT, CONDITIONAL USE PERMIT, AND EASEMENT VACATION
Proposed Action
Staff recommends adoption of the following motion: Move to approve: 1) resolution approving the
preliminary plat of Berean Baptist Church, 2) a conditional use permit to allow a) a church in the RS-3
District; and b) a building height greater than 35 feet and adopt findings of fact; and 3) a resolution vacating
public drainage and utility easements.
Overview
Applications for a preliminary plat, conditional use permit, and easement vacation were submitted by
representatives of Berean Baptist Church for the development of a church in the RS-3, Single Family
Residential District with a building height greater than 35 feet and the vacation of existing drainage and
utility easements. The property is 20.06 acres. The preliminary plat proposes one lot and five outlots. The
site is located east of Holyoke Avenue, west of Highview Avenue, and north of Heritage Drive.
The Planning Commission held a public hearing at its March 7, 2019 meeting. There was public comment
about the view of the church from the homes in the Berres Ridge development east of Highview Avenue.
There was also concern from Planning Commissioners about the south driveway access to the church not
being separated from the parking lot. The applicant agreed to revise the site plan to remove the parking
spaces west of the westernmost drive aisle to reduce some of the potential conflict between vehicles moving
through the site and others backing out of parking spaces and has submitted revised plans to reflect the
change. The applicant has also submitted revised building elevation plans to correct a miscalculation of
exterior building materials and bring the plans into compliance with Zoning Ordinance requirements. The
Planning Commission unanimously recommended approval of the preliminary plat, conditional use
permit, and easement vacation.
Primary Issue to Consider
What is the proposed height of the church?
Supporting Information
• Staff Response to Primary Issue to Consider
• Resolutions approving the preliminary plat and easement vacation
• Conditional Use Permit and Findings of Fact
• Revised site plan and building elevations
• Draft March 7, 2019 Planning Commission minutes
• February 28, 2019 planning and engineering reports
Financial Impact: $ Budgeted: Y☐ N☐ Source:
Related Documents: (CIP, ERP, etc.):
Envision Lakeville Community Values: A Sense of Community and Belonging
Report Completed by: Kris Jenson, Associate Planner
March 18, 2019
Zoning and Subdivision Ordinances
Primary Issue to Consider
What is the proposed height of the church? The roof height in the area of the sanctuary (the north side of the
building) is proposed to be 30 feet. On the south side of the building, the area planned for church
administration offices as well as education and gathering space, the building height is proposed to be 18
feet. That portion of the building does include rooftop mechanicals and the screen wall for those mechanical
units is another 10 feet, 8 inches in height, giving the appearance of a building that is nearly 29 feet tall. The
building does include a column, on top of which is a cross. The height of the column is proposed to be 36
feet, and the cross an additional 11 feet, for a total of 47 feet. The RS-3 District allows a maximum building
height of 35 feet, though the height of the building may exceed 35 feet by conditional use permit. Crosses
are not listed as an exemption to the building height requirements.
2
1
2
1
2
1
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
CONDITIONAL USE PERMIT
FINDINGS OF FACT AND DECISION
On March 7, 2019 the Lakeville Planning Commission met at its regularly scheduled
meeting to consider the application of Berean Baptist Church for a conditional use permit
to allow: 1) a religious institution in the RS-3, Single Family Residential District, and 2)
building height greater than 35 feet. The Planning Commission conducted a public hearing
on the proposed conditional use permit preceded by published and mailed notice. The
applicant was present and the Planning Commission heard testimony from all interested
persons wishing to speak. The City Council hereby adopts the following:
FINDINGS OF FACT
1. The property is located in Comprehensive Planning District No. 5, Central Area
Heritage Commons, which guides the property for residential uses.
2. The property is zoned RS-3, Single Family Residential District.
3. The legal description of the property is:
The South Half of the Southeast Quarter of the Southeast Quarter of Section 20,
Township 114, Range 20, excepting a parcel commencing at the Southeast corner
of said Section 20, thence westerly a distance of 475 feet along section line; thence
North a distance of 175 feet; thence east parallel with said section line a distance of
475 feet to easterly line of said Section; thence south along easterly line a distance
of 175 feet to point of beginning, Dakota County, Minnesota;
And
Commencing at the southeast corner of said Section 20, thence westerly a distance
of 475 feet along section line; thence North a distance of 175 feet; thence east parallel
with said section line a distance of 475 feet to easterly line of said Section; thence
south along easterly line a distance of 175 feet to point of beginning, Dakota
County, Minnesota;
and
Outlot C, HERITAGE WALK;
2
4. Section 11-4-3E of the City of Lakeville Zoning Ordinance provides that a
conditional use permit may not be issued unless certain criteria are satisfied. The
criteria and our findings regarding them are:
a) The proposed action has been considered in relation to the specific
policies and provisions of and has been found to be consistent with the
official City Comprehensive Plan.
Finding: The proposed religious institution is consistent with uses allowed in
residential areas of the City. The church use and the cross height in excess of
35 feet is consistent with the policies and provisions of Planning District 5 of
the Comprehensive Land Use Plan.
b) The proposed use is or will be compatible with future land uses of the
area.
Finding: The proposed religious institution in the RS-3 District will be
compatible with existing and future land uses in the area.
c) The proposed use conforms with all performance standards contained in
the Zoning Ordinance and the City Code.
Finding: The proposed religious institution use in the RS-3 District will
conform to the performance standards set forth in the Zoning Ordinance
given compliance with the stipulations of the conditional use permit.
d) The proposed use can be accommodated with existing public services and
will not overburden the City’s service capacity.
Finding: The proposed religious institution use will be served with existing
public services and will not overburden the City’s service capacity.
e) Traffic generation by the proposed use is within capabilities of streets
serving the property.
Finding: Traffic generation from the religious institution use can be
accommodated by major collector Holyoke Avenue.
5. The planning report dated February 28, 2019 prepared by Associate Planner Kris
Jenson is incorporated herein.
3
DECISION
The City Council approves the conditional use permit in the form attached hereto.
Dated: March 18, 2019
CITY OF LAKEVILLE
BY: _______________________________
Douglas P Anderson, Mayor
BY: _______________________________
Charlene Friedges, City Clerk
Building Structure: Foundation to Property Line =30'SETBACKSBuffer Setback =20' Rear=10' SideLowest Opening = EOF+1'Lowest Floor = HWL+3'Manage II Wetland Buffer =17'Parking Stalls: Parking Stall to Property Line =15'ABCDEFGH1234567HGFED7654321Copyright Pioneer Engineering, P.A.I hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Professional Engineer under the laws of the State of Minnesota.NameDateReg. No.DateItemSheet No.Sheet TitleComm. No.DrawnThis Sheet may bea Reduced Copy.The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.CBAIssued ForConsultants651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600bwbr.comKeyplanLakeville CampusBNM/JDM3.2018125.0002/07/2019CUP / PRELIM PLAT ISSUE09/21/201847504Brian N. MolinaroMendota Heights, MN 551202422 Enterprise Drive(651) 681-1914www.pioneereng.comCUP / PLAT RESUBMISSION01/04/2019CUP / PLAT RESUB COMMENTS02/07/2019REQUESTED UPDATES02/21/2019CITY REQUESTED UPDATES03/12/2019204.CPPreliminarySite &PavingPlan
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
+(;7(5,25(/(9$7,21 1257+
)(;7(5,25(/(9$7,21 ($67
'(;7(5,25(/(9$7,216287+
%(;7(5,25(/(9$7,21 :(67%5%5036,*1$*(3$1(/ 0(7$//,&),1,6+:%$&./,*+76775$6+(1&/2685((;7(5,25&5266 3$,17('67((/:83/,*+7,1*:,1'2:6<67(0%5%50375$6+(1&/2685((;7(5,25&5266 3$,17('67((/:83/,*+7,1*67:,1'2:6<67(0%5%5036,*1$*(3$1(/ 0(7$//,&),1,6+:%$&./,*+767(;7(5,25&5266 3$,17('67((/:83/,*+7,1*:,1'2:6<67(0%5%5%5%5670303%5%5%5&8335(/,03/$7,668( &833/$75(68%0,66,21 &833/$75(68%&200(176 &,7<5(48(67('83'$7(6 %575$6+(1&/2685((;7(5,25&5266 3$,17('67((/:83/,*+7,1*6703030303
Planning Commission Meeting Minutes, March 7, 2019 Page 3
• Commissioner Kelvie asked how far out does the school district project for
future expansions. Ms. Louden stated that they usually look five to ten years
out, but their projections were a little off this time. They are hoping this
expansion will address enrollment projections for a couple more years, after
which they may consider construction of a new elementary school.
• Parking requirements and landscape screening were discussed.
• Ms. Louden explained that they chose this location for the building addition
because the existing playground, fields and parking lots won’t be disturbed and
the addition meets setback requirements.
Mr. Morey indicated that the proposed landscape plan does show that they are
planning to add trees to the south side of the property, but staff could look at a different
tree species, not additional trees, that would be a better screening material. This could
be looked at prior to City Council consideration of the CUP amendment.
Motion was made by Drotning, seconded by Swenson to recommend to City
Council approval of the ISD #194 amendment to conditional use permit 91-02 to allow
the construction of a classroom addition to Cherry View Elementary School, located
at 8600 – 175th Street, subject to the following stipulations and adoption of the Findings
of Fact dated March 7, 2019:
1. A financial security in the amount of $137,849.40 shall be submitted prior to the
issuance of a building permit for the addition.
2. The site plan and building addition shall be developed in accordance with the plans
approved by the City Council.
3. A building permit is required prior to commencing construction of the building
addition.
4. The building addition is subject to review by the Fire Marshal.
5. Lighting shall be down-cast type only and must comply with Section 11-16-17 of
the Zoning Ordinance. Detailed fixture and photometric plans must be submitted
with the building permit application for the proposed addition.
Ayes: Swenson, Einck, Lillehei, Kaluza, Kelvie, Drotning
Nays: 0
6. Berean Baptist Church
Chair Kaluza opened the public hearing to consider the application of Berean Baptist
Church for the following, located east of Holyoke Avenue, north of Heritage Drive, and
west of Highview Avenue: A. Preliminary plat of one lot and five outlots; B. Conditional
use permit to allow: 1) a religious institution (church) in the RS-3, Single Family
Residential District and 2) a building height greater than 35 feet; and C. Vacation of
public road and drainage and utility easements.
Tony Manning, Executive Pastor at the Berean Baptist Church in Burnsville indicated
that they would like to build a second campus in a city where a lot of their parishioners
live rather than enlarge the current building in Burnsville. They hope to be good
neighbors and looking forward to being a part of the City of Lakeville.
Planning Commission Meeting Minutes, March 7, 2019 Page 4
Associate Planner Kris Jenson presented the planning report. Ms. Jenson stated that
Anderson Companies on behalf of Berean Baptist Church submitted applications for
a preliminary plat, a conditional use permit (CUP) for the development of a church in
the RS-3, Single Family Residential District with a building height greater than 35 feet,
and the vacation of existing road and drainage and utility easements.
Ms. Jenson indicated that there are five outlots in the Berean Baptist church
preliminary plat. Outlots A, C, and E will be retained by the church and Outlots B and
D will be deeded to the City with the final plat.
A wetland delineation was completed for the site, but during plan review, an additional
area of potential wetland was identified and noted on the plans, which will have to be
done in the spring with no grading or impacts to the area to take place until the
assessment is completed and approved.
A tree inventory and preservation plan has been submitted for the site. Of the 204
significant trees on the site, 27 are proposed to be saved. The majority of the trees
are Cottonwood and Box Elder trees.
Ms. Jenson reviewed the general performance standards for all CUP’s, which are
addressed in the February 28, 2019 planning report.
Staff has determined that the same metal proposed for the mechanical screen wall
was also proposed on the north side of the building for the upper portion of the
sanctuary but was not included in the materials calculations. The architect will revise
the building elevations to include the metal panels on the upper portion of the
sanctuary in the calculations and then make revisions to the exterior materials to
ensure that the building still meets the minimum of 65% Grade A materials.
Ms. Jenson stated that the proposed building height is 30 feet, with the exception of a
cross, which has a maximum height of 47 feet.
Berean Baptist Church would like the ability to use the proposed Outlot E for a
freestanding monument sign. Ms. Jenson explained that the church’s freestanding
sign is required by ordinance to be on the same parcel as the church use. Staff has
indicated that, as a part of the Zoning Ordinance update (following approval of the
2040 Comprehensive Plan), a discussion will take place regarding a possible
amendment to the Zoning Ordinance that would allow institutional uses to place
freestanding signs on separate parcels from the principal building in situations where
there are multiple parcels involved.
Ms. Jenson explained that Outlot C, Heritage Walk was platted in late 2002. At that
time, permanent drainage and utility easements were required on outlots. Exhibit O
of the February 28, 2019 planning report shows the easements to be vacated. She
indicated that perimeter drainage and utility easements will be dedicated with the final
plat.
Planning Commission Meeting Minutes, March 7, 2019 Page 5
Ms. Jenson also explained that initially staff identified a road, drainage, and utility
easement over a portion of Highview Avenue and included the vacation of said
easement with the public hearing notice, but it has since been determined that this
easement is not on the church property so it will not be required to be vacated with
the Berean Baptist Church plat.
Ms. Jenson stated that City staff recommends approval of the preliminary plat, CUP
and easement vacation, subject to the seven stipulations listed in the February 28,
2019 planning report, and adoption of the Findings of Fact dated March 7, 2019.
Chair Kaluza opened the hearing to the public for comment.
The following people spoke at the public hearing.
Doug Zisler, 19914 Hiawatha Ct.
Bill Richardson, 8426 199th Ct.
Terry Nelson, 19935 Hiawatha Ct.
All three residents were concerned with privacy between their homes and the
church building. They suggested a berm be installed along with 10-foot
evergreens on the east side of the building for increased privacy.
Motion was made by Kelvie, seconded by Lillehei to close the public hearing at
6:31 p.m.
Voice vote was taken on the motion. Ayes - unanimous
Chair Kaluza asked for comments from the Planning Commission. Discussion points
included:
• A berm on the east side of the building along Highview Avenue was discussed
along with the size of the proposed landscaping. Joe Powers, Project Engineer
and Eric Rose, civil engineer for the church agreed that a small berm is
proposed on the east side of the church. The first floor elevation of the church
will be 19 feet lower than the first floor elevation of the homes on the east side
of Highview Avenue. A berm and landscaping would not substantially screen
the church building from the existing homes given the topography.
• The proposed freestanding sign was discussed. Commissioner Swenson
asked if the outlot where the freestanding sign is proposed is buildable. Ms.
Jenson indicated that it would be possible to combine Outlot E with the lot to
the north when that property redeveloped.
• Commissioner Lillehei asked if consideration could be given to not dedicating
the future street right-of-way with the final plat, install the sign, then dedicate
the right-of-way thus rendering the sign non-conforming. Mr. Morey stated that
it is an option, but not the preferred option. Staff prefers to amend the Zoning
Ordinance.
• There was a lengthy discussion regarding the parking lot layout, especially
traffic safety in the south parking lot. Could the orientation of the stalls or the
Planning Commission Meeting Minutes, March 7, 2019 Page 6
circulation be modified to improve on-site circulation and safety? Mr. Rose
indicated that they would be willing to remove the west stalls in the south
parking lot, thereby reducing potential conflict between vehicle circulation and
vehicles backing out of the parking spaces along this drive aisle. The Planning
Commission concurred with this revision.
• Commissioner Swenson commented on the need to wait until the growing
season in April to refine the wetland delineation.
The following stipulation was recommended to be added to address the south parking
lot circulation:
8. Prior to City Council consideration, the site plan shall be revised to eliminate
the westerly 20 spaces in the south parking lot.
Motion was made by Kelvie, seconded by Lillehei to recommend to City Council
approval of the following, located east of Holyoke Avenue, north of Heritage Drive,
and west of Highview Avenue: A. preliminary plat of one lot and five outlots; B.
conditional use permit to allow 1) a religious institution (church) in the RS-3, Single
Family Residential District, 2) a building height greater than 35 feet; C. vacation of
public road and drainage and utility easements, subject to the following stipulations,
as amended, and adoption of the Findings of Fact dated March 7, 2019.
1. The recommendations listed in the Engineering Division memorandum dated
February 28, 2019
2. The Grade A exterior building materials shall not be painted.
3. The height of the cross shall not exceed 47 feet.
4. Outlots B and D shall be deeded to the City with the final plat.
5. A sign permit application shall be submitted and approved by the City prior to the
installation of any signage.
6. The future building addition and/or parking expansion requires approval of a
conditional use permit amendment.
7. Prior to City Council consideration, the exterior building elevations shall be revised
to include the upper level sanctuary area in the materials calculation and to
increase the Grade A materials to meet the minimum requirement of 65% Grade
A materials.
8. Prior to City Council consideration, the site plan shall be revised to eliminate the
westerly 20 spaces in the south parking lot.
Ayes: Einck, Lillehei, Kaluza, Kelvie, Jarvis, Drotning, Swenson
Nays: 0
7. The Moments of Lakeville
Chair Kaluza opened the public hearing to consider the application of Elizabeth
Wright, Waite Holdings, LLC and TMSC of Lakeville, LLC for the following, located
south of 162nd Street (CSAH 46) and east of Kenyon Avenue: A. Zoning Ordinance
amendment to allow the connection of principal buildings across a property line for
interior pedestrian and vehicle use in commercial districts by conditional use permit;
2
3
4
5
6
7
8
±
202ND ST (CSAH 50)
200TH ST
HERITAGE DR
HOLISTE R LN
199TH CTHOLYOKE AVEHIGHVIEW AVEHIAWATHA CTHEXHAMWAYHOMEFIRE WAY HOLDINGFORD WAYHOLLOWAY LNCity of Lakeville
Berean Baptist Church
Preliminary Plat
CUP & VacationEXHIBIT A
Proposed Berean
Church site
HOLT AVEAll Saints
Church
Lakeville
City Hall Fire Station
No. 1
Heritage
Center
Heritage
Library
±
P/OS
P/OS
RM-1
RS-3
RS-3
City of Lakeville
Berean Church
Prelim Plat
CUP/VacationEXHIBIT B
RS-4
PUD
P/OS
RM-2
Berean Church Site
All Saints
Church
PUD
RS-3
HERITAGE DRHOLYOKE AVEHIGHVIEW AVE202ND ST (CSAH 50)HOLT AVEO-R HOLLIST E R LNHOLLOWAY LNHOLDINGFORD WAY199TH CT
HOMEFIRE WAY
Certificate of SurveyNJK202.VEEX-SURV-118124-BASE.DWGABCDEFGH1234567HGFED7654321Copyright Pioneer Engineering, P.A.NameDateReg. No.DateItemSheet No.Sheet TitleComm. No.DrawnThis Sheet may bea Reduced Copy.The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.CBAIssued ForConsultants651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600bwbr.comKeyplanLakeville CampusI hereby certify that this survey, plan, or report was preparedby me or under my direct supervision and that I am a dulyLicensed Land Surveyor under the laws of the State of Minnesota.3.2018125.0002/07/2019CUP / PRELIM PLAT ISSUE09/21/2018Mendota Heights, MN 551202422 Enterprise Drive(651) 681-1914www.pioneereng.com42299Peter J. HawkinsonCUP / PLAT RESUBMISSION01/04/2019CUP / PLAT RESUB COMMENTS02/07/2019REQUESTED UPDATES02/21/2019(Existing Conditions)
00-SURV-118124-BASE.DWGPreliminary PlatABCDEFGH1234567HGFED7654321Copyright Pioneer Engineering, P.A.NameDateReg. No.DateItemSheet No.Sheet TitleComm. No.DrawnThis Sheet may bea Reduced Copy.The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.CBAIssued ForConsultants651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600bwbr.comKeyplanLakeville CampusI hereby certify that this survey, plan, or report was preparedby me or under my direct supervision and that I am a dulyLicensed Land Surveyor under the laws of the State of Minnesota.3.2018125.0002/07/2019CUP / PRELIM PLAT ISSUE09/21/2018Mendota Heights, MN 551202422 Enterprise Drive(651) 681-1914www.pioneereng.com42299Peter J. HawkinsonCUP / PLAT RESUBMISSION01/04/2019CUP / PLAT RESUB COMMENTS02/07/2019NJK203.VP
ABCDEFGH1234567HGFED7654321Copyright Pioneer Engineering, P.A.NameDateReg. No.DateItemSheet No.Sheet TitleComm. No.DrawnThis Sheet may bea Reduced Copy.The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.NOT
FO
R
CON
S
T
RU
C
T
ION This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.CBAIssued ForConsultants651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600bwbr.comKeyplanLakeville CampusI hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Landscape Architect under the laws of the State of Minnesota.3.2018125.0002/07/2019CUP / PRELIM PLAT ISSUE 09/21/2018Mendota Heights, MN 551202422 Enterprise Drive(651) 681-1914www.pioneereng.com44763Jennifer L. ThompsonCUP / PLAT RESUBMISSION 01/04/2019CUP / PLAT RESUB COMMENTS 02/07/2019JLTGHOST PLATGHOSTPLAT3.2018125.00
Building Structure: Foundation to Property Line =30'SETBACKSBuffer Setback =20' Rear=10' SideLowest Opening = EOF+1'Lowest Floor = HWL+3'Manage II Wetland Buffer =17'Parking Stalls: Parking Stall to Property Line =15'ABCDEFGH1234567HGFED7654321Copyright Pioneer Engineering, P.A.I hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Professional Engineer under the laws of the State of Minnesota.NameDateReg. No.DateItemSheet No.Sheet TitleComm. No.DrawnThis Sheet may bea Reduced Copy.The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.CBAIssued ForConsultants651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600bwbr.comKeyplanLakeville CampusBNM/JDM3.2018125.0002/07/2019CUP / PRELIM PLAT ISSUE09/21/201847504Brian N. MolinaroMendota Heights, MN 551202422 Enterprise Drive(651) 681-1914www.pioneereng.comCUP / PLAT RESUBMISSION01/04/2019CUP / PLAT RESUB COMMENTS02/07/2019204.CPPreliminarySite &PavingPlan
ABCDEFGH1234567HGFED7654321Copyright Pioneer Engineering, P.A.I hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Professional Engineer under the laws of the State of Minnesota.NameDateReg. No.DateItemSheet No.Sheet TitleComm. No.DrawnThis Sheet may bea Reduced Copy.The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.CBAIssued ForConsultants651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600bwbr.comKeyplanLakeville CampusBNM/JDM3.2018125.0002/07/2019CUP / PRELIM PLAT ISSUE09/21/201847504Brian N. MolinaroMendota Heights, MN 551202422 Enterprise Drive(651) 681-1914www.pioneereng.comCUP / PLAT RESUBMISSION01/04/2019CUP / PLAT RESUB COMMENTS02/07/2019REQUESTED UPDATES02/21/2019205.CG.1PreliminaryGradingPlan
ABCDEFGH1234567HGFED7654321Copyright Pioneer Engineering, P.A.I hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Professional Engineer under the laws of the State of Minnesota.NameDateReg. No.DateItemSheet No.Sheet TitleComm. No.DrawnThis Sheet may bea Reduced Copy.The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.CBAIssued ForConsultants651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600bwbr.comKeyplanLakeville CampusBNM/JDM3.2018125.0002/07/2019CUP / PRELIM PLAT ISSUE09/21/201847504Brian N. MolinaroMendota Heights, MN 551202422 Enterprise Drive(651) 681-1914www.pioneereng.comCUP / PLAT RESUBMISSION01/04/2019CUP / PLAT RESUB COMMENTS02/07/2019206.CUPreliminaryUtilityPlan
LOADING DOCK (SU-30 SINGLE UNIT TRUCK)MAIN ENTRANCE (FIRE TRUCK)MAIN ENTRANCE (FIRE TRUCK)ABCDEFGH1234567HGFED7654321Copyright Pioneer Engineering, P.A.I hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Professional Engineer under the laws of the State of Minnesota.NameDateReg. No.DateItemSheet No.Sheet TitleComm. No.DrawnThis Sheet may bea Reduced Copy.The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.CBAIssued ForConsultants651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600bwbr.comKeyplanLakeville CampusBNM/JDM3.2018125.0002/07/2019CUP / PRELIM PLAT ISSUE09/21/201847504Brian N. MolinaroMendota Heights, MN 551202422 Enterprise Drive(651) 681-1914www.pioneereng.comCUP / PLAT RESUBMISSION01/04/2019CUP / PLAT RESUB COMMENTS02/07/2019207.CTTurningMovementPlan
ABCDEFGH1234567HGFED7654321Copyright Pioneer Engineering, P.A.NameDateReg. No.DateItemSheet No.Sheet TitleComm. No.DrawnThis Sheet may bea Reduced Copy.The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.NOT
FO
R
CON
S
T
RU
C
T
ION This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.CBAIssued ForConsultants651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600bwbr.comKeyplanLakeville CampusI hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Landscape Architect under the laws of the State of Minnesota.3.2018125.0002/07/2019CUP / PRELIM PLAT ISSUE 09/21/2018Mendota Heights, MN 551202422 Enterprise Drive(651) 681-1914www.pioneereng.com44763Jennifer L. ThompsonCUP / PLAT RESUBMISSION 01/04/2019CUP / PLAT RESUB COMMENTS 02/07/2019JLTLANDSCAPE PLAN209.LP.13.2018125.00
ABCDEFGH1234567HGFED7654321Copyright Pioneer Engineering, P.A.NameDateReg. No.DateItemSheet No.Sheet TitleComm. No.DrawnThis Sheet may bea Reduced Copy.The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.NOT
FO
R
CON
S
T
RU
C
T
ION This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.CBAIssued ForConsultants651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600bwbr.comKeyplanLakeville CampusI hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Landscape Architect under the laws of the State of Minnesota.3.2018125.0002/07/2019CUP / PRELIM PLAT ISSUE 09/21/2018Mendota Heights, MN 551202422 Enterprise Drive(651) 681-1914www.pioneereng.com44763Jennifer L. ThompsonCUP / PLAT RESUBMISSION 01/04/2019CUP / PLAT RESUB COMMENTS 02/07/2019JLTLANDSCAPE PLAN209.LP.23.2018125.00DRY SWALE/POND(STATE SEED MIX 33-262)
TREE PROTECTION DETAILABCDEFGH1234567HGFED7654321Copyright Pioneer Engineering, P.A.NameDateReg. No.DateItemSheet No.Sheet TitleComm. No.DrawnThis Sheet may bea Reduced Copy.The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.NOT
FO
R
CON
S
T
RU
C
T
ION This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.CBAIssued ForConsultants651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600bwbr.comKeyplanLakeville CampusI hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Landscape Architect under the laws of the State of Minnesota.3.2018125.0002/07/2019CUP / PRELIM PLAT ISSUE 09/21/2018Mendota Heights, MN 551202422 Enterprise Drive(651) 681-1914www.pioneereng.com44763Jennifer L. ThompsonCUP / PLAT RESUBMISSION 01/04/2019CUP / PLAT RESUB COMMENTS 02/07/2019JLTTREE PRESERVATION210.TP3.2018125.00
5101D
510
510
510
1F
1H
1B 28'-0"8'-0"50'-8"37'-4"1116
CRY/OBSERV
FUTURE
ADULT
MINISTRY
1118
EDUCATION
- MIDDLE &
SR. HIGH
SCHOOL
1126
NURSERY -
INFANTS/
TODDLERS 1128
NURSERY -
2-3 YEAR
OLDS
1129
YOUNG
CHILDREN -
4-5 YEAR
OLDS
1130
YOUNG
CHILDREN -
K & 1ST
GRADE
1131
CHECK-IN
1132
ADULT
MINISTRY -
MEETING
ROOM
1135
COPY/
WORK/
COUNTING
1136
SMALL
MEETING
ROOM
1137
AMINISTRATION
/ OPEN
OFFICE
1138
KITCHEN
1139
CAFE
1149
TOILET
1214
YOUNG
CHILDREN -
2ND & 3RD
GRADE
1216
YOUNG
CHILDREN -
4TH & 5TH
GRADE
1221
TOILET
1222
CIRCULATION
1234
STOR
1235
TOILETS1277
TOILETS
1278
IT
1279
ELECTRICAL
1280
MECHANICAL
1281
TOILET1282
LACTATION
ROOM
1170
VESETIBULE
1288
TOILET
1294
GATHERING
1350
LIGHT LOCK
82'-8"28'-10 1/2"19'-9"79'-4"23'-3"25'-8"14'-8"50'-4"82'-8"12'-4 1/2"
14'-8"85'-4"
1359
GATHERING
1351
LIGHT LOCK
1291
ACCESS
HALL
1107
WORSHIP
SPACE (400
SEATS)
1360
SOUND /
LIGHT
BOOTH
1108
STAGE
1109
STORAGE
1352
VESTIBULE
ADMINISTRATION/SUPPORT
COMMUNITY SPACE
EDUCATION
EDUCATION CORRIDOR
NONASSIGNABLE - BLDG CIRCULATION
NONASSIGNABLE - BLDG SUPPORT
WORSHIP
WORSHIP CIRCULATION
1361
TRASH
ENCLOSURE90'-8"52'-8"7
4
°
100'-0"124'-0"233'-10 1/2"
14'-8"6'-0"
95'-0 1/2"
OUTDOOR PATIO
(PHASE I)
18'-0"12'-0"10'-0"2'-9"18'-0"10'-8"8'-0"2'-9"18'-0"10'-8"8'-0"2'-9"18'-0"10'-8"10'-0"2'-9"11'-0"36'-0"MATERIALS LEGEND - EXTERIOR ELEVATION
METAL PANEL 1 (MP-1)
HORIZONTAL REVEALS W/
CONCEALED FASTENERS
STOREFRONT
WINDOW SYSTEM
MODULAR BRICK (BR-1)
STONE VENEER (ST-1)
KASOTA STONE;
ASHLAR PATTERN
MODULAR BRICK 2 (BR-2)
STACK BOND
MECHANICAL SCREEN WALL
17171717 1
2
WETLAND
W
E
T
L
A
N
D
3.3
25.5
4.1
4.1 4.1
1.8 1.8
1.8 1.8
1.3
1.2
1.3
0.6
0.6 0.6
0.6 0.6
0.6
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0
0.4 0.4 0.4
0.4 0.4
0.4
0.1 0.1 0.1 0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0
1.1 1.3 1.4 1.4 1.4 1.6 1.5 1.4 1.3 1.2 1.2 1.1 1.0 1.0 1.1 1.1 1.1 1.1 1.2 1.2 1.1 1.1 1.0 0.9 0.7
1.1 1.4 1.4 1.8 1.6 1.7 1.7 1.6 1.7 1.4 1.3 1.2 1.0 1.2 1.2 1.3 1.5 1.4 1.4 1.4 1.4 1.5 1.2 1.1 0.8
1.0 1.4 1.4 1.8 1.8 1.9 1.9 1.8 1.7 1.4 1.4 1.2 1.0 1.2 1.3 1.3 1.7 1.6 1.7 1.7 1.6 1.5 1.3 1.2 0.8
1.0 1.3 1.5 1.8 2.0 2.4 2.4 2.0 1.8 1.5 1.4 1.1 1.0 1.1 1.3 1.4 1.7 1.9 2.3 2.3 1.8 1.6 1.3 1.1 0.8
0.9 1.2 1.4 1.8 2.1 3.2 3.2 2.2 1.8 1.5 1.4 1.2 1.1 1.2 1.3 1.5 1.8 2.2 3.1 3.1 2.0 1.7 1.3 1.2 0.8
0.9 1.2 1.4 1.8 2.1 3.2 3.2 2.1 1.8 1.5 1.4 1.2 1.1 1.2 1.3 1.5 1.8 2.2 3.2 3.1 2.0 1.7 1.3 1.2 0.8
0.9 1.2 1.4 1.7 1.9 2.3 2.4 1.9 1.8 1.5 1.4 1.2 1.1 1.2 1.4 1.5 1.7 2.0 2.4 2.3 1.8 1.7 1.3 1.2 0.8
0.9 1.3 1.3 1.7 1.7 1.8 1.8 1.7 1.7 1.4 1.4 1.2 1.1 1.2 1.4 1.4 1.7 1.7 1.8 1.8 1.6 1.6 1.3 1.2 0.8
0.9 1.2 1.3 1.6 1.5 1.5 1.5 1.5 1.7 1.4 1.4 1.3 1.1 1.3 1.4 1.4 1.6 1.5 1.5 1.5 1.5 1.6 1.2 1.2 0.9
0.9 1.1 1.2 1.2 1.2 1.3 1.4 1.2 1.3 1.3 1.3 1.2 1.1 1.2 1.3 1.3 1.2 1.2 1.3 1.3 1.2 1.2 1.2 1.1 0.8
0.8 1.0 1.1 1.1 1.1 1.3 1.3 1.2 1.2 1.2 1.1 1.1 1.1 1.1 1.1 1.2 1.2 1.2 1.2 1.2 1.1 1.1 1.1 0.9 0.7
0.7 0.9 1.0 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.0 1.0 1.0 1.1 1.1 1.1 1.1 1.1 1.1 1.0 1.0 1.0 0.8
0.8 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.1 1.0 1.0 1.0 1.0 1.0 1.1 1.0 1.0 1.0 1.0 1.0 1.0 0.9 0.8
0.8 0.9 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.9 1.0 1.0 1.1 1.0 1.0 1.0 1.0 1.0 1.0 0.9 0.8
0.7 0.8 1.0 1.0 1.0 1.1 1.1 1.1 1.1 1.1 1.0 1.0 1.0 1.0 1.0 1.1 1.1 1.1 1.0 1.1 1.0 1.0 1.0 0.8
0.7 0.9 1.0 1.1 1.1 1.2 1.2 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.2 1.2 1.1 1.1 1.0 0.9 0.7
0.8 1.1 1.1 1.2 1.2 1.3 1.3 1.2 1.2 1.2 1.2 1.2 1.1 1.2 1.2 1.2 1.2 1.2 1.3 1.3 1.2 1.2 1.1 1.0 0.8
0.9 1.2 1.3 1.5 1.4 1.4 1.4 1.4 1.6 1.3 1.3 1.2 1.1 1.3 1.3 1.4 1.6 1.4 1.4 1.4 1.4 1.5 1.2 1.2 0.9
0.9 1.2 1.3 1.6 1.6 1.7 1.7 1.6 1.7 1.4 1.4 1.2 1.1 1.2 1.4 1.4 1.7 1.6 1.7 1.7 1.6 1.6 1.3 1.2 0.8
0.9 1.2 1.4 1.7 1.8 2.1 2.2 1.8 1.7 1.4 1.4 1.2 1.1 1.2 1.4 1.5 1.7 1.9 2.2 2.1 1.8 1.7 1.3 1.2 0.8
0.8 1.2 1.4 1.7 2.0 3.0 3.0 2.1 1.8 1.4 1.3 1.2 1.1 1.2 1.3 1.5 1.8 2.2 3.0 3.0 2.0 1.7 1.3 1.2 0.8
0.8 1.2 1.3 1.8 2.1 3.2 2.1 1.8 1.4 1.3 1.1 1.1 1.2 1.3 1.5 1.8 2.2 3.2 3.2 2.0 1.7 1.3 1.2 0.8
0.8 1.2 1.3 1.7 1.9 2.5 2.5 1.9 1.7 1.4 1.3 1.1 1.0 1.1 1.3 1.4 1.7 2.0 2.5 2.4 1.9 1.7 1.3 1.1 0.8
0.9 1.2 1.3 1.7 1.7 1.9 1.9 1.7 1.7 1.4 1.3 1.1 1.0 1.2 1.3 1.4 1.7 1.7 1.8 1.8 1.6 1.6 1.3 1.1 0.8
0.9 1.1 1.2 1.6 1.5 1.6 1.6 1.5 1.6 1.3 1.3 1.1 1.0 1.2 1.3 1.3 1.6 1.5 1.5 1.5 1.5 1.5 1.2 1.1 0.8
0.8 1.0 1.2 1.2 1.2 1.3 1.3 1.2 1.2 1.2 1.1 1.1 1.0 1.1 1.1 1.1 1.1 1.1 1.2 1.2 1.1 1.1 1.1 1.0 0.7
0.9 1.1 1.0 1.0 0.9 0.9 0.7 0.6 0.4 0.3 0.2 0.1 0.1
1.1 1.2 1.4 1.4 1.2 1.1 1.0 0.9 0.7 0.5 0.3 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
1.4 1.5 1.4 1.5 1.5 1.3 1.4 1.2 1.1 0.9 0.6 0.3 0.2 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.2 0.2 0.2 0.1
1.5 1.6 1.8 1.9 2.0 2.0 1.8 1.8 1.4 1.3 1.0 0.6 0.3 0.2 0.1 0.1 0.2 0.4 0.5 0.6 0.7 0.6 0.5 0.4 0.2
1.6 1.8 2.1 2.2 2.4 2.4 2.1 1.9 1.5 1.3 1.0 0.6 0.3 0.2 0.1 0.1 0.2 0.7 1.0 1.1 1.2 1.1 1.0 0.6 0.2
1.4 1.8 2.0 2.4 2.5 3.3 3.4 2.6 2.1 1.7 1.3 1.0 0.6 0.3 0.2 0.1 0.1 0.2 0.5 1.0 1.1 0.9 1.1 1.0
1.4 1.7 2.1 2.2 2.6 2.8 4.1 4.1 3.0 2.2 1.7 1.4 1.0 0.6 0.4 0.2
1.6 1.9 2.3 2.5 2.8 3.0 3.8 3.9 3.0 2.3 1.8 1.4 1.0 0.6 0.4 0.2
1.6 1.8 2.1 2.5 2.8 3.0 3.0 3.2 3.2 2.8 2.4 1.8 1.5 1.1 0.6 0.4 1.7
1.8 2.1 2.7 2.9 3.1 3.2 3.3 3.2 3.0 2.8 2.4 1.7 1.5 1.1 0.7 0.5 23.8
1.8 2.0 2.3 2.9 3.3 3.4 3.4 3.2 2.9 2.8 2.4 2.1 1.7 1.5 1.1 0.8 0.5 25.4
1.9 2.2 2.7 3.0 3.7 4.1 3.6 3.2 3.1 2.7 2.3 1.9 1.6 1.4 1.1 0.8 0.6
1.6 2.1 2.4 2.8 3.1 4.0 4.9 4.1 3.2 3.0 2.5 2.3 1.9 1.6 1.3 1.1 0.8 0.7 24.1
1.8 2.2 2.6 2.9 3.1 4.0 4.8 4.1 3.1 2.8 2.4 2.2 1.8 1.6 1.3 1.1 0.9 0.8 2.2
1.7 1.9 2.3 2.7 2.9 3.2 3.7 4.0 3.6 3.0 2.7 2.3 2.1 1.8 1.6 1.4 1.2 1.0 1.0 0.8
1.8 2.3 2.7 3.0 3.1 3.5 3.4 3.4 3.3 2.9 2.4 2.2 2.1 1.8 1.6 1.4 1.3 1.2 1.2 1.0 0.9 0.9
1.6 1.9 2.4 2.9 3.3 3.4 3.3 3.1 3.0 2.8 2.6 2.3 2.1 2.1 1.9 1.7 1.5 1.4 1.4 1.3 1.2 1.1 1.0 0.9 0.7 4.1
1.6 2.0 2.4 3.2 3.9 3.6 3.0 2.9 2.7 2.4 2.1 1.9 1.9 2.1 1.9 1.8 1.8 1.6 1.6 1.4 1.5 1.4 1.2 1.1 0.8 24.1
1.3 1.6 2.0 2.4 3.3 4.4 3.9 2.9 2.7 2.5 2.3 1.9 1.7 1.7 1.9 1.9 1.8 2.0 1.8 1.8 1.8 1.7 1.5 1.3 1.1 0.8 20.8
1.3 1.6 2.0 2.3 3.0 3.8 3.4 2.7 2.5 2.2 2.0 1.7 1.5 1.5 1.6 1.7 1.9 2.0 2.2 2.4 2.2 1.8 1.7 1.3 1.1 0.7
1.6 1.8 2.1 2.5 2.8 2.7 2.3 2.3 1.9 1.8 1.5 1.4 1.4 1.5 1.6 1.8 2.0 2.6 3.3 2.8 1.9 1.7 1.3 1.1 0.8
1.6 1.7 2.0 2.1 2.2 2.2 2.1 1.9 1.7 1.6 1.3 1.2 1.2 1.4 1.6 1.8 2.0 2.7 3.5 3.0 2.0 1.7 1.3 1.2 0.8
1.5 1.5 1.7 1.6 1.7 1.6 1.7 1.6 1.5 1.4 1.2 1.1 1.1 1.3 1.5 1.7 1.9 2.3 2.7 2.4 1.9 1.7 1.3 1.2 0.8
1.3 1.3 1.3 1.4 1.5 1.4 1.3 1.3 1.2 1.1 1.0 0.9 1.0 1.3 1.5 1.6 1.9 1.9 2.0 2.0 1.8 1.7 1.4 1.3 0.9
1.0 1.1 1.1 1.1 1.2 1.2 1.0 1.0 1.0 0.9 0.8 0.8 1.0 1.2 1.4 1.5 1.8 1.7 1.8 1.7 1.8 1.7 1.4 1.3 1.0
0.8 0.8 0.8 0.9 0.9 0.9 0.8 0.8 0.8 0.7 0.7 0.7 0.9 1.1 1.2 1.3 1.4 1.4 1.6 1.5 1.5 1.4 1.4 1.3 1.0
1.1 1.2 1.3 1.4 1.5 1.5 1.4 1.4 1.3 1.2 1.0
0.9 1.1 1.2 1.3 1.4 1.5 1.4 1.4 1.3 1.2 1.1
0.9 1.1 1.2 1.3 1.4 1.4 1.5 1.4 1.3 1.2
1.0 1.2 1.3 1.4 1.4 1.5 1.5 1.4 1.2
0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5
0.7 0.8 0.8 0.8 0.8 0.8 0.8 0.9 0.9 0.9 0.9 0.8 0.8 0.9 0.9 1.0 0.9 0.9 0.9 0.9 0.9 0.9 1.0 0.9 0.8 0.8 0.8 0.8 0.9 0.9 0.9 0.9 0.8 0.8 0.8 0.8 0.8 0.8 0.7 0.5
0.9 1.1 1.2 1.2 1.2 1.2 1.2 1.3 1.3 1.2 1.1 1.1 1.1 1.1 1.2 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.2 1.1 1.0 1.0 1.0 1.1 1.2 1.3 1.3 1.2 1.2 1.2 1.2 1.2 1.0 0.9 0.7 0.6 0.5
1.0 1.2 1.3 1.3 1.3 1.4 1.4 1.5 1.4 1.4 1.4 1.3 1.3 1.4 1.4 1.5 1.5 1.5 1.4 1.4 1.5 1.5 1.4 1.3 1.3 1.2 1.2 1.3 1.3 1.4 1.4 1.4 1.4 1.4 1.4 1.3 1.3 1.2 1.0 0.8 0.7 0.6
1.1 1.5 1.6 1.7 1.8 1.8 1.8 1.8 1.8 1.5 1.5 1.5 1.5 1.5 1.5 1.9 1.8 1.9 1.9 1.9 1.9 1.8 1.8 1.5 1.4 1.4 1.4 1.4 1.4 1.6 1.7 1.8 1.8 1.9 1.8 1.7 1.6 1.3 1.1 0.9 0.8 0.7
1.3 1.6 1.8 2.0 2.1 2.2 2.1 2.0 2.0 1.7 1.7 1.7 1.7 1.7 1.7 1.9 2.0 2.2 2.3 2.3 2.1 2.0 1.8 1.7 1.6 1.6 1.6 1.5 1.6 1.7 2.0 2.0 2.2 2.2 2.1 1.9 1.8 1.3 1.2 1.0 0.9
1.6 1.8 2.1 2.6 3.4 3.6 2.8 2.4 2.1 2.0 2.0 1.9 1.9 2.0 2.0 2.2 2.4 2.9 3.7 3.6 2.7 2.3 2.1 2.0 2.0 1.9 1.9 1.9 2.0 1.9 2.2 2.5 3.3 3.7 3.1 2.3 1.9 1.5 1.4 1.2 1.0
1.9 2.1 2.4 3.0 3.9 3.3 2.6 2.5 2.3 2.2 2.1 2.1 2.2 2.3 2.5 2.7 3.3 4.0 3.9 3.2 2.6 2.5 2.4 2.3 2.2 2.2 2.2 2.3 2.3 2.5 2.9 3.7 4.0 3.5 2.6 2.1 1.7 1.5 1.2
2.0 2.4 2.7 3.0 3.4 3.5 3.2 2.9 2.8 2.5 2.4 2.3 2.3 2.4 2.5 2.9 3.0 3.2 3.5 3.5 3.2 3.0 2.8 2.6 2.5 2.5 2.6 2.6 2.6 2.5 2.8 2.9 3.2 3.4 3.1 2.5 2.2 1.7 1.5 1.2
2.2 2.7 2.9 2.9 3.0 3.1 3.1 3.1 3.1 2.7 2.6 2.5 2.5 2.6 2.7 3.1 3.2 3.2 3.2 3.2 3.2 3.3 3.2 2.8 2.8 2.8 2.8 2.8 2.7 2.9 3.0 3.0 3.0 3.0 2.8 2.6 2.3 1.8 1.5
2.2 2.6 2.7 3.0 3.0 3.1 3.1 2.9 2.9 2.7 2.6 2.6 2.6 2.6 2.7 3.0 3.0 3.2 3.2 3.3 3.3 3.1 3.2 2.9 2.9 2.9 2.9 2.9 3.0 3.1 3.0 3.1 3.0 2.8 2.6 2.3 2.1 1.9 1.6
2.3 2.8 3.0 3.0 3.0 3.1 3.1 3.1 3.1 2.7 2.5 2.5 2.5 2.5 2.7 3.1 3.2 3.2 3.2 3.2 3.2 3.3 3.2 2.9 2.8 2.7 2.7 3.0 3.0 3.2 3.2 3.1 2.9 2.9 2.5 2.2 2.0 1.8
2.2 2.5 2.8 3.1 3.5 3.5 3.3 3.0 2.8 2.4 2.4 2.3 2.3 2.4 2.5 2.8 3.0 3.3 3.7 3.7 3.3 3.1 2.9 2.7 2.7 2.6 2.5 2.8 3.0 3.5 3.7 3.4 2.9 2.5 2.1 2.0 1.8 1.6
2.2 2.4 2.6 3.1 4.0 4.0 3.3 2.6 2.5 2.3 2.2 2.1 2.1 2.2 2.2 2.4 2.7 3.3 4.0 3.3 2.7 2.6 2.5 2.5 2.5 2.4 2.6 2.9 3.7 3.6 2.7 2.3 1.9 1.7 1.5
2.0 2.1 2.4 2.6 3.2 3.2 2.7 2.4 2.1 1.9 1.9 1.9 1.9 1.9 1.9 2.1 2.4 2.8 3.2 3.2 2.8 2.5 2.2 2.2 2.3 2.3 2.1 2.4 2.6 2.9 3.2 2.9 2.4 2.0 1.5 1.4 1.3
1.9 2.2 2.2 2.2 2.2 2.2 2.1 2.0 2.0 1.7 1.6 1.6 1.6 1.7 1.7 2.0 2.1 2.1 2.2 2.2 2.2 2.2 2.2 1.9 2.0 2.0 2.0 2.2 2.2 2.2 2.1 2.1 1.9 1.8 1.5 1.2
2.0 2.0 2.1 2.0 1.9 1.9 1.8 1.8 1.5 1.5 1.5 1.5 1.5 1.6 1.8 1.8 1.9 1.9 1.9 2.0 1.9 2.0 1.8 1.8 1.9 1.9 2.0 2.0 2.0 1.9 1.8 1.7 1.5 1.4 1.1
1.9 1.8 1.7 1.7 1.6 1.6 1.5 1.5 1.4 1.4 1.4 1.4 1.5 1.6 1.6 1.6 1.6 1.6 1.6 1.7 1.7 1.7 1.7 1.7 1.7 1.8 1.7 1.6 1.5 1.5 1.4 1.4 1.3 1.1
1.7 1.7 1.6 1.6 1.6 1.5 1.4 1.3 1.2 1.2 1.3 1.4 1.5 1.5 1.5 1.5 1.5 1.5 1.6 1.6 1.5 1.5 1.5 1.6 1.6 1.6 1.5 1.4 1.4 1.3 1.3 1.2
1.4 1.4 1.4 1.3 1.3 1.2 1.2 1.1 1.1 1.2 1.2 1.3 1.2 1.2 1.2 1.2 1.2 1.3 1.3 1.3 1.3 1.3 1.4 1.3 1.3 1.2 1.2 1.1 1.1 1.0 1.0
1.2 1.2 1.2 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.0 1.0 1.1 1.1 1.1 1.1 1.1 1.2 1.2 1.2 1.2 1.1 1.1 1.0 1.0 1.0 1.0 0.9
1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.9 0.9 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.1 1.0 1.0 1.0 0.9 0.9 0.9 0.9 0.9
0.6 0.6 0.6 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7
0.8 0.8 0.8 0.8 0.9 0.9 0.9 0.8 0.8 0.8 0.8 0.9 0.9 0.9 0.9 0.8 0.8 0.8 0.8 0.6 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.8 0.7 0.7
0.7 0.8 0.9 0.9 0.9 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.9 0.9 0.9 0.8 0.7 0.6 0.5 0.5 0.4 0.4 0.5 0.6 0.6 0.6 0.8 0.8 0.9 0.9 0.9 0.9
0.6 0.8 1.1 1.1 0.9 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.9 1.1 1.1 0.8 0.6 0.5 0.5 0.4 0.4 0.3 0.3 0.3 0.5 0.6 0.7 0.9 0.9 0.9 1.0 1.1 1.1 1.2
0.3 0.4 0.6 0.6 0.4 0.4 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.6 0.6 0.4 0.3 0.3 0.2 0.2 0.2 0.3 0.5 0.8 1.2 1.2 1.0 1.1 1.2 1.2 1.3
0.2 0.3 0.5 0.8 0.9 0.9 0.9 1.0 1.2 1.3 1.5
0.4 0.4 0.5 0.7 0.9 1.1 1.3 1.4 1.6
0.4 0.6 0.9 1.1 1.3 1.5 1.7
0.4 0.6 0.9 1.2 1.4 1.7 1.7
0.5 0.8 1.1 1.4 1.7
0.6 0.9 1.2 1.5 1.7
0.7 1.0 1.5 1.6 1.7 1.7 1.6
0.8 1.3 1.6 1.5 1.4 1.4 1.3
1.0 1.2 1.3 1.2 1.3 1.2 1.2
0.6 0.8 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.9 0.9 1.0 1.0 1.0 1.0 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 1.0 1.0 1.0 0.9 0.9 0.9 0.9 0.9 0.9 0.8 0.8 0.8 0.8 0.8 0.8 0.9 1.0 1.4
0.5 0.7 0.8 0.9 0.9 1.0 1.1 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.9 0.9 0.9 0.9 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.9 0.9 0.9 0.9 1.0 1.0 0.9 0.9 0.9 0.9 0.9 0.9 0.9 1.0 1.3
0.4 0.7 0.8 0.9 0.9 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.9 0.9 0.9 0.9 0.8 0.9 0.9 1.0 1.0 1.0 1.0 1.0 0.9 0.9 0.9 0.9 0.8 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.8 0.8 1.0 1.1
0.6 0.8 0.8 0.8 0.9 1.1 1.3 1.2 1.0 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 1.0 1.2 1.2 1.0 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 1.0 1.2 1.1 0.9 0.7 0.7 0.8 0.9 0.9
0.5 0.5 0.7 0.9 0.8 0.6 0.5 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.6 0.8 0.8 0.6 0.5 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.6 0.8 0.8 0.6 0.5 0.4 0.5 0.5 0.6
1.0 1.1 1.2
1.0 1.1 1.1
1.0 1.0
0.8 0.9 0.9
0.8 0.9 0.9
0.8 1.0 1.0
1.0 1.0 1.0
1.1 1.0
1.0 1.0
1.0 1.0 0.8
0.9 0.9 0.7
0.8 0.7 0.7
0.10.10.10.20.30.40.40.40.50.50.50.50.40.40.40.30.30.20.20.10.10.10.10.10.10.10.10.10.10.10.10.10.10.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.10.10.10.10.10.10.10.10.10.10.10.10.10.10.1
0.1
0.1
0.2
0.3
0.4
0.4
0.4
0.5
0.4
0.1
0.1
0.1
0.1
0.1
0.2 0.5 1.1 1.0 0.9 0.7 0.6 0.4 0.3 0.2 0.2 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
0.6 0.2
0.3 0.1
0.1 0.1
0.1
0.2 0.1 0.1
0.6 0.4 0.3 0.1
1.0 0.5 0.1
1.0 0.4 0.1
0.1 0.1
0.1 0.1
0.1 0.1
0.2 0.2
0.2 0.2
0.3 0.3
0.4 0.4
0.6 0.5
0.8 0.7
0.9 0.8Phase 1Phase 2Phase 3Phase 3--AAA@30'-0"
A@30'-0"A@30'-0"
A@30'-0"A@30'-0"
B@30'-0"
B@30'-0"
B@30'-0"B@30'-0"
B@30'-0"
B@30'-0"
B@30'-0"B@30'-0"
A@30'-0"
A@30'-0"A@30'-0"
A@30'-0"
A@30'-0"
A@30'-0"
A@30'-0"
A@30'-0"
A@30'-0"
D@9'-0"
D@9'-0"
D@9'-0"
C@10'-0"
C@10'-0"
SheetDescription Sketch for:1 of 1c 2019 Pioneer Engineering, P.A.
CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS
2422 Enterprise Drive
Mendota Heights, MN 55120
(651) 681-1914
www.pioneereng.comFax: 681-9488
BEREAN BAPTIST CHURCH
Cad File: 118124-EASEMENT
VACATION.dwg
Folder #: 3264
Drawn by:KSO
•
•
•
•
•
BBEERREEAANN BBAAPPTTIISSTT CCHHUURRCCHH
FFEEBBRRUUAARRYY 2288,, 22001199
PPAAGGEE 22 OOFF 66
BBEERREEAANN BBAAPPTTIISSTT CCHHUURRCCHH
FFEEBBRRUUAARRYY 2288,, 22001199
PPAAGGEE 33 OOFF 66
BBEERREEAANN BBAAPPTTIISSTT CCHHUURRCCHH
FFEEBBRRUUAARRYY 2288,, 22001199
PPAAGGEE 44 OOFF 66
BBEERREEAANN BBAAPPTTIISSTT CCHHUURRCCHH
FFEEBBRRUUAARRYY 2288,, 22001199
PPAAGGEE 55 OOFF 66
BBEERREEAANN BBAAPPTTIISSTT CCHHUURRCCHH
FFEEBBRRUUAARRYY 2288,, 22001199
PPAAGGEE 66 OOFF 66