HomeMy WebLinkAbout18161 Green Gables Tr SurveyENGINEERING REVIEWEDDATE: 03/07/2019 smurphyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONThe curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.* Connection to drain tile isrequired* Structures may not be placedwithin easementsPlanning DepartmentApprovedDate:__________________03/15/2019dmorey