HomeMy WebLinkAboutItem 06.e Date: Item No. BERRES RIDGE 5TH ADDITION FINAL PLAT Proposed Action Staff recommends adoption of the following motion: Move to approve a resolution approving the Berres Ridge 5th Addition final plat. Overview Berres Ridge Development, LLC has submitted a final plat application for Berres Ridge 5th Addition, which consists of 34 single family residential lots and four outlots on 69.88 acres of land located north of 202nd Street (CSAH 50) and west of Hamburg Avenue. The Berres Ridge 5th Addition final plat is consistent with the approved preliminary plat. The original Berres Ridge preliminary plat of 366 single family lots was approved by the City Council on January 5, 2015, the Berres Ridge 1st Addition final plat of 63 single family lots was approved on May 4, 2015, a revised Berres Ridge 2nd Addition preliminary plat for 135 single family lots was approved by the City Council on May 2, 2016, and the Berres Ridge 2nd Addition final plat of 63 single family lots was approved by the City Council on July 5, 2016. A revised phasing plan for the Berres Ridge development was approved by the City Council on January 3, 2017, the Berres Ridge 3rd Addition final plat of 47 single family lots was approved on March 6, 2017, and the Berres Ridge 4th Addition final plat of 28 single family lots was approved on March 5, 2018. Primary Issue to Consider Why is 200th Street outside the plat boundary being improved with this subdivision? Supporting Information • Primary Issue to Consider • Resolution approving the Berres Ridge 5th Addition final plat • Signed development contract • March 25, 2018 Planning and Engineering reports Financial Impact: n/a Budgeted: Y☐ N☐ Source: Related Documents: (CIP, ERP, etc.): Subdivision and Zoning Ordinances Envision Lakeville Community Values: A Home for All Ages and Stages of Life Report Completed by: Kris Jenson, Associate Planner April 1, 2019 Primary Issue to Consider Why is 200th Street outside the plat boundary being improved with this subdivision? The Traffic Impact Study completed with the Berres Ridge EAW and preliminary plat projected that the Berres Ridge subdivision would generate 1,400 vehicles per day on 200th Street between Hamburg Avenue and Cedar Avenue. To improve public safety and limit the required continuous gravel roadway routine maintenance/road stabilization generated by the addition traffic, the Developer is required to improve 200th Street with the Berres Ridge 5th Addition final plat improvements. The Developer is eligible for reimbursement for subgrade correction, aggregate base placement, minor ditch grading, restoration, and it’s share of mobilization and traffic control, which is estimated to be $150,000. This reimbursement is contingent upon the work being consistent with the plans approved by the City Engineer and the Developer is required to obtain two estimates for the work to ensure competitive pricing. (Reserved for Dakota County Recording Information) CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RESOLUTION NO. ______ RESOLUTION APPROVING THE FINAL PLAT OF BERRES RIDGE 5TH ADDITION WHEREAS, the owner of the property described as BERRES RIDGE 5TH ADDITION has requested final plat approval; and WHEREAS, the preliminary plat was reviewed by the Planning Commission and the Parks, Recreation and Natural Resources Committee and approved by the City Council; and WHEREAS, the final plat is consistent with the preliminary plat; and WHEREAS, the final plat is acceptable to the City; NOW THEREFORE BE IT RESOLVED by the Lakeville City Council: 1. BERRES RIDGE 5TH ADDITION final plat is approved subject to the development contract and security requirements. 2. The Mayor and City Clerk are hereby authorized to sign the development contract and the final plat mylars. 3. The City Clerk is directed to file a certified copy of this resolution with the Dakota County Recorder. 2 ADOPTED by the Lakeville City Council this 1st day of April 2019. CITY OF LAKEVILLE Douglas P. Anderson, Mayor ATTEST: _______________________ Charlene Friedges, City Clerk STATE OF MINNESOTA ) CITY OF LAKEVILLE ) I hereby certify that the foregoing Resolution No. _________is a true and correct copy of the resolution presented to and adopted by the City Council of the City of Lakeville at a duly authorized meeting thereof held on the 1st day of April 2019 as shown by the minutes of said meeting in my possession. __________________________ Charlene Friedges City Clerk (SEAL) Drafted By: City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 1 Berres Ridge 5th Addition 201165v11 (reserved for recording information) DEVELOPMENT CONTRACT (Developer Installed Improvements) BERRES RIDGE 5TH ADDITION CONTRACT dated ____________________, 2019, by and between the CITY OF LAKEVILLE, a Minnesota municipal corporation (“City”), and BERRES RIDGE DEV. CO., LLC, a Minnesota limited liability company (the “Developer”). 1. REQUEST FOR PLAT APPROVAL. The Developer has asked the City to approve a plat for Berres Ridge 5TH Addition (referred to in this Contract as the "plat"). The land is situated in the County of Dakota, State of Minnesota, and is legally described on Exhibit “A” attached hereto and made a part hereof by reference: 2. CONDITIONS OF PLAT APPROVAL. The City hereby approves the plat on condition that the Developer enter into this Contract, furnish the security required by it, and record the plat with the County Recorder or Registrar of Titles within 100 days after the City Council approves the final plat. 3. RIGHT TO PROCEED. Within the plat or land to be platted, the Developer may not grade or otherwise disturb the earth or remove trees, unless a grading permit has been approved by the City Engineer following approval of a preliminary plat by the City Council, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all the following conditions have been satisfied: 1) this agreement has been fully executed by both parties and filed with the City Clerk, 2) the 2 Berres Ridge 5th Addition 201165v11 necessary security has been received by the City, 3) the necessary insurance for the Developer and its construction contractors has been received by the City, and 4) the plat has been filed with the Dakota County Recorder or Registrar of Titles’ office. 4. PHASED DEVELOPMENT. If the plat is a phase of a multi-phased preliminary plat, the City may refuse to approve final plats of subsequent phases if the Developer has breached this Contract and the breach has not been remedied. Development of subsequent phases may not proceed until Development Contracts for such phases are approved by the City. Park dedication charges referred to in this Contract are not being imposed on outlots, if any, in the plat that are designated in an approved preliminary plat for future subdivision into lots and blocks. Such charges will be calculated and imposed when the outlots are final platted into lots and blocks. 5. PRELIMINARY PLAT STATUS. If the plat is a phase of a multi-phased preliminary plat, the preliminary plat approval for all phases not final platted shall lapse and be void unless final platted into lots and blocks, not outlots, within six (6) years after preliminary plat approval. 6. CHANGES IN OFFICIAL CONTROLS. For two (2) years from the date of this Contract, no amendments to the City’s Comprehensive Plan, except an amendment placing the plat in the current metropolitan urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary, to the full extent permitted by state law, the City may require compliance with any amendments to the City’s Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Contract. 7. DEVELOPMENT PLANS. The plat shall be developed in accordance with the following plans. The plans shall not be attached to this Contract. With the exception of Plans A, B, C, and F the plans may be prepared, subject to the City Engineer’s approval, after entering the Contract, but before commencement of any work in the plat. The City Engineer may approve minor amendments to Plan B without City Council approval. The erosion control plan may also be approved by the Dakota County Soil 3 Berres Ridge 5th Addition 201165v11 and Water Conservation District. If the plans vary from the written terms of this Contract, the written terms shall control. The plans are: Plan A - Plat Plan B - Final Grading, Drainage, and Erosion Control Plan Plan C - Tree Preservation Plan Plan D - Plans and Specifications for Public Improvements Plan E - Street Lighting Plan Plan F - Landscape Plan 8. IMPROVEMENTS. The Developer shall install and pay for the following: A. Sanitary Sewer System B. Water System C. Storm Sewer System D. Streets E. Concrete Curb and Gutter F. Street Lights G. Site Grading, Stormwater Treatment/Infiltration Basins, and Erosion Control H. Underground Utilities I. Setting of Iron Monuments J. Surveying and Staking K. Sidewalks and Trails L. Retaining Walls The improvements shall be installed in accordance with the City subdivision ordinance; City standard specifications for utility and street construction; and any other ordinances including Section 11-16- 7 of the City Code concerning erosion and drainage and Section 4-1-4-2 prohibiting grading, construction activity, and the use of power equipment between the hours of 10 o’clock p.m. and 7 o’clock a.m. The Developer shall submit plans and specifications which have been prepared by a competent registered 4 Berres Ridge 5th Addition 201165v11 professional engineer to the City for approval by the City Engineer. The Developer shall instruct its engineer to provide adequate field inspection personnel to assure an acceptable level of quality control to the extent that the Developer’s engineer will be able to certify that the construction work meets the approved City standards as a condition of City acceptance. In addition, the City may, at the City’s discretion and at the Developer’s expense, have one or more City inspectors and a soil engineer inspect the work on a full or part-time basis. The Developer, its contractors and subcontractors, shall follow all instructions received from the City’s inspectors. The Developer’s engineer shall provide for on-site project management. The Developer’s engineer is responsible for design changes and contract administration between the Developer and the Developer’s contractor. The Developer or its engineer shall schedule a pre-construction meeting at a mutually agreeable time at the City with all parties concerned, including the City staff, to review the program for the construction work. Within thirty (30) days after the completion of the improvements and before the security is released, the Developer shall supply the City with a complete set of reproducible “as constructed” plans and an electronic file of the “as constructed” plans in an AutoCAD .DWG file or a .DXF file, all prepared in accordance with City standards. In accordance with Minnesota Statutes 505.021, the final placement of iron monuments for all lot corners must be completed before the applicable security is released. The Developer’s surveyor shall also submit a written notice to the City certifying that the monuments have been installed following site grading, utility and street construction. 9. CONTRACTORS/SUBCONTRACTORS. City Council members, City employees, and City Planning Commission members, and corporations, partnerships, and other entities in which such individuals have greater than a 25% ownership interest or in which they are an officer or director may not act as contractors or subcontractors for the public improvements identified in Paragraph 8 above. 10. PERMITS. The Developer shall obtain or require its contractors and subcontractors to obtain all necessary permits, which may include: A. Dakota County for County Road Access and Work in County Rights-of-Way B. MnDot for State Highway Access C. MnDot for Work in Right-of -Way 5 Berres Ridge 5th Addition 201165v11 D. Minnesota Department of Health for Watermains E. MPCA NPDES Permit for Construction Activity F. MPCA for Sanitary Sewer and Hazardous Material Removal and Disposal G. DNR for Dewatering H. City of Lakeville for Building Permits I. MCES for Sanitary Sewer Connections J. City of Lakeville for Retaining Walls 11. DEWATERING. Due to the variable nature of groundwater levels and stormwater flows, it will be the Developer’s and the Developer’s contractors and subcontractors responsibility to satisfy themselves with regard to the elevation of groundwater in the area and the level of effort needed to perform dewatering and storm flow routing operations. All dewatering shall be in accordance with all applicable county, state, and federal rules and regulations. DNR regulations regarding appropriations permits shall also be strictly followed. 12. TIME OF PERFORMANCE. The Developer shall install all required public improvements by November 30, 2019, with the exception of the final wear course of asphalt on streets. The Developer may not open the development roadway connections to the Hamburg Avenue/202nd Street intersection until Dakota County has completed County Project 50-23 and the 202nd Street/Hamburg Avenue intersection is open to traffic. The final wear course on streets shall be installed between August 15th and October 15th the first summer after the base layer of asphalt has been in place one freeze thaw cycle. The Developer may, however, request an extension of time from the City. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. Final wear course placement outside of this time frame must have the written approval of the City Engineer. 13. LICENSE. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in conjunction with plat development. 6 Berres Ridge 5th Addition 201165v11 14. EROSION CONTROL. Prior to initiating site grading, the erosion control plan, Plan B, shall be implemented by the Developer and inspected and approved by the City or Dakota County Soil and Water Conservation District. The City or Dakota County Soil and Water Conservation District may impose additional erosion control requirements if they would be beneficial. All areas disturbed by the grading operations shall be stabilized per the MPCA Stormwater Permit for Construction Activity. Seed shall be in accordance with the City’s current seeding specification which may include temporary seed to provide ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. If the Developer does not comply with the MPCA Stormwater Permit for Construction Activity or with the erosion control plan and schedule or supplementary instructions received from the City or the Dakota County Soil and Water Conservation District, the City may take such action as it deems appropriate to control erosion. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer’s and City’s rights or obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred for such work within ten (10) days, the City may draw down the letter of credit to pay any costs. No development, utility or street construction will be allowed and no building permits will be issued unless the plat is in full compliance with the approved erosion control plan. 15. GRADING. The plat shall be graded in accordance with the approved grading development and erosion control plan, Plan “B”. The plan shall conform to City of Lakeville specifications. Within thirty (30) days after completion of the grading and before the City approves individual building permits (except model home permits on lots acceptable to the Building Official), the Developer shall provide the City with an “as constructed” grading plan certified by a registered land surveyor or engineer that all storm water treatment/infiltration basins and swales, have been constructed on public easements or land owned by the City. The “as constructed” plan shall include field verified elevations of the following: a) cross sections of storm water treatment/infiltration basins; b) location and elevations along all swales, wetlands, wetland mitigation areas if any, locations and dimensions of borrow areas/stockpiles, and installed “conservation 7 Berres Ridge 5th Addition 201165v11 area” posts; and c) lot corner elevations and house pads, and all other items listed in City Code Section 10- 3-5.NN. The City will withhold issuance of building permits until the approved certified grading plan is on file with the City and all erosion control measures are in place as determined by the City Engineer. The Developer certifies to the City that all lots with house footings placed on fill have been monitored and constructed to meet or exceed FHA/HUD 79G specifications. The soils observation and testing report, including referenced development phases and lot descriptions, shall be submitted to the Building Official for review prior to the issuance of building permits. Before a building permit is issued, a cash escrow of $1,000.00 per lot shall be furnished to the City to guarantee compliance with the erosion control and grading requirements and the submittal of an as-built certificate of survey. Prior to the release of the required individual lot grading and erosion control security that is submitted with the building permit, an as-built certificate of survey for single family lots must be submitted to verify that the final as-built grades and elevations of the specific lot and all building setbacks are consistent with the approved grading plan for the development, and amendments thereto as approved by the City Engineer, and that all required property monuments are in place. If the final grading, erosion control and as-built survey is not timely completed, the City may enter the lot, perform the work, and apply the cash escrow toward the cost. Upon satisfactory completion of the grading, erosion control and as-built survey, the escrow funds, without interest, less any draw made by the City, shall be returned to the person who deposited the funds with the City. Berres Ridge 5th Addition contains more than one acre of site disturbance. A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed by g rading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. 16. CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted from construction work by the Developer, home builders, subcontractors, their agents or assigns. Prior to any construction in the plat, the Developer shall identify in writing a responsible party and schedule for erosion control, street cleaning, and street sweeping. 8 Berres Ridge 5th Addition 201165v11 17. OWNERSHIP OF IMPROVEMENTS. Upon completion of the work and construction required by this Contract and final acceptance by the City, the improvements lying within public easements shall become City property without further notice or action. 18. CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION OBSERVATION. The Developer shall pay a fee for in-house engineering administration. City engineering administration will include monitoring of construction observation, consultation with Developer and its engineer on status or problems regarding the project, coordination for final inspection and acceptance, project monitoring during the warranty period, and processing of requests for reduction in security. Fees for this service shall be three percent (3%) of construction costs identified in the Summary of Security Requirements if using a letter of credit, assuming normal construction and project scheduling. The Developer shall pay for construction observation performed by the City’s in-house engineering staff or consulting engineer. Construction observation shall include part or full time inspection of proposed public utilities and street construction and will be billed on hourly rates estimated to be five percent (5%) of the estimated construction cost. 19. STORM SEWER. Development of Berres Ridge 5th Addition includes the construction of public storm sewer systems. The Developer shall install storm sewer within the subdivision to collect and convey stormwater runoff generated from within the public right-of-way and lots to the public stormwater management basins located within Outlots A and B. The basins will provide water quality treatment and rate control of the stormwater runoff generated from the Berres Ridge 5th Addition subdivision. The stormwater basin design on Outlot B will be reviewed with future phases of Berres Ridge for approval. The Developer shall construct a temporary storm sewer outlet for the basin on Outlot B. The Developer shall remove this storm sewer in the future when the temporary outlet is no longer necessary. The Developer shall convey to the City a temporary drainage and utility easement over the area of the basin on Outlot B prior to City consideration of the final plat. The temporary easement shall terminate when the property in which the basin is located is final platted into lots and blocks and a permanent 9 Berres Ridge 5th Addition 201165v11 easement for drainage and utility purposes is provided by the Developer or the basin is conveyed to the City. The Trunk Storm Sewer Area Charge has not been collected on the parent parcels, and must be paid with the final plat, calculated as follows: Gross Area of Berres Ridge 5th Addition 3,043,939.00 s.f. Less Area of Outlot A (Stormwater Management Basin) (-) 24,173.00 s.f. Less Area of Outlot B (Future Development) (-) 1,640,935.00 s.f. Less Area of Outlot C (Future Development) (-) 732,664.00 s.f. Less Area of Outlot D (Future Development) (-) 41,779.00 s.f. Total = 604,388.00 s.f. 604,388.00 s.f. x $0.178/s.f. = $107,581.06 Net Area of Berres Ridge 5th Addition Area Charge Total The remainder of the Trunk Storm Sewer Area Charge will be collected at the time Outlots B, C, and D are final platted into lots and blocks, at the rate in effect at the time of final plat. Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final construction plans. 20. SANITARY SEWER. Development of Berres Ridge 5th Addition includes the extension of public sanitary sewer. The Developer shall extend sanitary sewer within the subdivision to provide sanitary sewer service to the development. The Sanitary Sewer Availability Charge has not been collected on the parent parcels and shall be paid with the final plat. The fee will be based on the current rate in effect at the time of final plat approval, calculated as follows: 34 units x $327.00 = $11,118.00 Total Units in Berres Ridge 5th Addition Sanitary Sewer Availability Charge Per Unit Sanitary Sewer Availability Charge Required With Berres Ridge 5th Addition 21. WATERMAIN. Development of Berres Ridge 5th Addition includes the extension of public watermain. The Developer shall extend watermain within the development to provide water service to the subdivision. 10 Berres Ridge 5th Addition 201165v11 Consistent with the City’s Water Plan and the Berres Ridge 1st Addition Development Contract, the Developer shall extend 12-inch watermain along Hamburg Avenue from 200th Street to the north extent of the Hamburg Avenue right-of-way. The City will credit the Developer’s cash fees an estimated $9,694.00 for the oversizing of the 12-inch watermain. The City will provide the credit for the watermain installation following construction based on true project quantities and costs, within 30 days of receipt of written request for payment conditioned on the following: 1. Watermain has been inspected, tested and accepted by the City. 2. Developer has submitted to the City the final pay estimate, invoice, and lien waiver from the contractor. 22. CONSTRUCTION ACCESS. Construction traffic access and egress for grading, utility and street construction shall be restricted to Hamburg Avenue by way of 200th Street. The Developer shall coordinate construction activities with the Dakota County contractor for the 202nd Street/Hamburg Avenue improvements. 23. FUTURE UPGRADE OF 202ND STREET. The City and County’s current Capital Improvement Plan (CIP) programs the reconstruction of 202nd Street adjacent to the plat in 2019 (City Project No. 15-12). The improvement project will include the reconstruction and widening of 202nd Street to a two-lane divided roadway with turn lanes, significant profile adjustment to the Hamburg Avenue intersection, trails along both sides of 202nd Street, and traffic controls at Holyoke Avenue and Cedar Avenue. 24. FUTURE UPGRADE OF HAMBURG AVENUE. Berres Ridge 5th Addition is located north and west of and adjacent to Hamburg Avenue, a minor collector roadway as identified in the City’s Transportation Plan. Hamburg Avenue is currently a 24-foot wide gravel roadway adjacent to the plat. The Developer shall re-construct Hamburg Avenue, between 202nd Street and 200th Street with the final improvements consistent with the Revised Phasing Plan approved by the City Council on January 3, 2017 and the Berres Ridge 1st Addition Development Contract. Hamburg Avenue shall be constructed by the Developer to include the following: the west ½ of Hamburg Avenue between 202nd Street and 11 Berres Ridge 5th Addition 201165v11 200th Street shall be 20-feet in width with concrete curb and gutter and a 5-foot wide sidewalk; the east ½ of Hamburg Avenue between 202nd Street and 200th Street shall be 12-feet wide with a 3-foot aggregate shoulder-rural section. The Developer is required to obtain the necessary easements to construct the east ½ of Hamburg Avenue. When the property east of and adjacent to Hamburg Avenue south of 200th Street is developed, that Developer will be required to widen the easterly ½ to a 20-foot wide urban section and construct a 5-foot wide sidewalk. The Developer shall construct Hamburg Avenue north of 200th Street as a 40-foot wide, two lane urban roadway with 5-foot wide sidewalks along both sides of the street. A sidewalk along the east side of Hamburg Avenue directly adjacent to PID No.220210076016 will not be constructed with the development improvements (as shown on the final plat plans). This sidewalk will be required to be constructed at the time PID No. 220210076016 is final platted into lots and blocks. The Developer shall limit the number of driveways that have direct access to Hamburg Avenue. All corner lots that are located along Hamburg Avenue shall have their driveways access the adjacent side street. This applies to the following lots: • Lot 5, Block 1 • Lots 11 and 13, Block 2 • Lots 1 and 8, Block 3 • Lot 1, Block 6 • Lots 1 and 2, Block 7 • Lot 1, Block 8 Due to the profile adjustment at the Hamburg Avenue intersection, a portion of Hamburg Avenue between 202nd Street and 200th Street will be reconstructed by Dakota County with the 202nd Street Reconstruction Project. The Developer shall reimburse the City for the City’s share of the improvements to Hamburg Avenue required by the Berres Ridge 1st Addition Development Contract, which will be constructed by Dakota County in the amount of $58,500.00 and shall provide a letter of credit in this amount. The City will bill the Developer within 6 months of final acceptance of the improvements. The Developer shall reimburse the City within 30 days of receipt of an invoice. 12 Berres Ridge 5th Addition 201165v11 25. UPGRADE OF 200TH STREET. The Traffic Impact Study completed with the Berres Ridge preliminary plat projects the Berres Ridge subdivision will generate 1,400 vehicles per day on 200th Street, between Hamburg Avenue and Cedar Avenue. To improve public safety and limit the required continuous gravel roadway routine maintenance/road stabilization generated by the additional traffic, the Developer shall improve 200th Street with the Berres Ridge 5th Addition final plat improvements. The Developer shall pave 200th Street, including subgrade correction and aggregate base placement, between Hamburg Avenue and Cedar Avenue. The Developer is eligible for reimbursement of the subgrade correction, aggregate base placement, minor ditch grading, restoration and its share of mobilization and traffic control. The estimated reimbursement is $150,000.00. Reimbursement shall be contingent on a) the work being consistent with plans approved by the City Engineer, and b) the work being consistent with a contract entered into by the Developer and approved by the City Engineer, including any necessary City approved change orders, prior to execution. The Developer agrees to obtain two estimates for the work to ensure competitive pricing. The Developer shall furnish a letter of credit for the Developer’s share of the improvements, estimated at $115,000.00, which includes paving and the Developer’s share of mobilization and traffic control costs. 200th Street must be completed and accepted prior to the issuance of building permits for Berres Ridge 5th Addition, except for approved model homes on lots approved by the Building Official. 26. PARKS AND TRAILS. The Park Dedication requirement has not been collected on the parent parcels and will be satisfied through a cash contribution to be paid by the Developer with the final plat. The Park Dedication Fee will be based on the rate in effect at the time of final plat approval, calculated as follows: 34 units x $4,294.00 = $145,996.00 Total Units In Berres Ridge 5th Addition Park Dedication Fee Park Dedication Requirement 27. TRAFFIC CONTROL SIGNS AND STREET LIGHT OPERATION COSTS. A $6,275 cash fee for traffic control signs is due and must be paid by the Developer with Berres Ridge 5th Addition. 13 Berres Ridge 5th Addition 201165v11 A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat approval and is calculated as follows: 34 units x $36.48/unit. = $1,240.32 Total Units In Berres Ridge 4th Addition Streetlight Operating Fee Total 28. ENVIRONMENTAL RESOURCES EXPENSES. A cash fee for one-year of environmental resources expenses shall be paid at the time of final plat approval and is calculated as follows: 34 units x $57.52/unit = $1,955.68 Total Units In Berres Ridge 4th Addition Environmental Resources Fee Total 29. LANDSCAPING. Unless the lot already has two (2) trees on it, the Developer or lot purchaser shall plant sufficient trees so that there are at least two (2) trees on every lot in the plat, one of which must be planted in the front yard. Trees that are chosen by the Developer or property owner cannot cause a public nuisance, such as cotton producing trees, or trees that may become a public hazard due to insect infestation or weak bark. The minimum deciduous tree size shall be two and one-half (2½) inches caliper, balled and burlapped. Evergreen trees must be at least eight feet (8’) tall. The trees may not be planted in the right-of-way. The Developer or lot purchaser shall sod the front yard, boulevard, and side yards to the rear of the structure on every lot. Weather permitting, the trees, sod, and seed shall be planted within sixty (60) days after a home has received a certificate of occupancy. Before a building permit is issued, a cash escrow of $1,000.00 per lot shall be furnished the City to guarantee compliance with the landscaping requirements. If the landscaping is not completed in a timely manner, the City may enter the lot, perform the work, and apply the cash escrow toward the cost. Upon satisfactory completion of the landscaping the escrow funds, without interest, less any draw made by the City, shall be returned to the person who deposited the funds with the City. All trees shall be warranted to be alive, of good quality, and disease free for twelve (12) months after planting. Any replacements shall be warranted for twelve (12) months from the time of planting. The Developer or property owner is responsible for contacting the City when all the landscaping has been installed to set up an inspection. Fifty percent (50%) of the security will be released when all the landscaping has been installed and inspected by City 14 Berres Ridge 5th Addition 201165v11 staff and the remaining fifty percent (50%) will be released one year after the landscaping inspection and any warranty work has been completed. 30. SPECIAL PROVISIONS. The following special provisions shall apply to plat development: A. Implementation of the recommendations listed in the March 25, 2019 Engineering Report. B. Before the City signs the final plat, the Developer shall convey Outlot A to the City by warranty deed, free and clear of any and all encumbrances. This land will be conveyed to the City at an agreed upon price of $5,500.00 per acre and is calculated as follows: 0.55 acres x $5,500.00 = $3,025.00 C. Prior to City Council approval of the final plat, the Developer shall furnish a boundary survey of the proposed property to be platted with all property corner monumentation in place and marked with lath and a flag. Any encroachments on or adjacent to the property shall be noted on the survey. The Developer shall post a $3,800.00 security for the final placement of interior subdivision iron monuments at property corners. The security was calculated as follows: 38 lots/outlots at $100.00 per lot/outlots. The security will be held by the City until the Developer's land surveyor certifies that all irons have been set following site grading and utility and street construction. In addition, the certificate of survey must also include a certification that all irons for a specific lot have either been found or set prior to the issuance of a building permit for that lot. D. The Developer shall pay a cash fee for the preparation of record construction drawings and City base map updating. This fee is $90.00 per lot/outlot for a total charge of $3,420.00. E. The Developer shall be responsible for the cost of street light installation consistent with a street lighting plan approved by the City. Before the City signs the final plat, the Developer shall post a security for street light installation consistent with the approved plan. The estimated amount 15 Berres Ridge 5th Addition 201165v11 of this security is $17,400.00 and consists of seven (7) post top street lights at $1,200.00 each and six (6) mast arm street lights at $1,500.00 each. F. The Developer is required to submit the final plat in electronic format. The electronic format shall be either AutoCAD.DWG file or a .DXF file. All construction record drawings (e.g., grading, utilities, streets) shall be in electronic format in accordance with standard City specifications. 31. SUMMARY OF SECURITY REQUIREMENTS. To guarantee compliance with the terms of this Contract, payment of real estate taxes including interest and penalties, payment of special assessments, payment of the costs of all public improvements, and construction of all public improvements, the Developer shall furnish the City with a cash escrow, letter of credit or alternate security, in the form attached hereto, from a bank ("security") for $2,059,899.45 If an alternate security is furnished, the Developer shall also furnish a letter of credit for twenty-five percent (25%) of the alternate security amount to cover any contract increases. The amount of the security was calculated as follows: CONSTRUCTION COSTS: A. Sanitary Sewer $232,596.95 B. Watermain 191,531.50 C. Storm Sewer 365,697.80 D. Street Construction 533,552.93 E. Hamburg Avenue 256,831.12 F. 200th Street 115,000.00 G. Erosion Control/Stormwater and Filtration Basins, 128,448.40 Restoration, Grading and Grading Certification CONSTRUCTION SUB-TOTAL $1,823,658.70 OTHER COSTS: A. Developer’s Design (3.0%) $54,709.76 B. Developer’s Construction Survey (2.5%) 45,591.47 C. City Legal Expenses (Est. 0.5%) 9,118.29 D. City Construction Observation (Est. 5.0%) 91,182.94 E. Developer’s Record Drawings (0.5%) 9,118.29 16 Berres Ridge 5th Addition 201165v11 F. Landscaping 15,520.00 G. Street Lights 7,200.00 H. Lot Corners/Iron Monuments 3,800.00 OTHER COSTS SUB-TOTAL $236,240.75 TOTAL SECURITIES: $2,059,899.45 This breakdown is for historical reference; it is not a restriction on the use of the security. The bank shall be subject to the approval of the City Administrator. The City may draw down the security, on five (5) business days written notice to the Developer, for any violation of the terms of this Contract or without notice if the security is allowed to lapse prior to the end of the required term. If the required public improvements are not completed at least thirty (30) days prior to the expiration of the security, the City may also draw it down without notice. If the security is drawn down, the proceeds shall be used to cure the default. Upon receipt of proof satisfactory to the City that work has been completed and financial obligations to the City have been satisfied, with City approval the security may be reduced from time to time by ninety percent (90%) of the financial obligations that have been satisfied. Ten percent (10%) of the amounts certified by the Developer's engineer shall be retained as security until all improvements have been completed, all financial obligations to the City satisfied, the required "as constructed" plans have been received by the City, a warranty security is provided, and the public improvements are accepted by the City Council. The City’s standard specifications for utility and street construction outline procedures for security reductions. 32. SUMMARY OF CASH REQUIREMENTS. The following is a summary of the cash requirements under this Contract which must be furnished to the City prior to the City Council signing the final plat: A. Park Dedication Fee 145,996.00 B. Sanitary Sewer Availability Charge 11,118.00 C. Trunk Storm Sewer Area Charge 107,581.06 D. Traffic Control Signs 6,275.00 E. Streetlight Operating Fee 1,240.32 F. Environmental Resources Fee 1,955.68 17 Berres Ridge 5th Addition 201165v11 G. City Base Map Updating Fee 3,420.00 H. City Engineering Administration (3% for letters of credit or 3.25% for alternate disbursement) 54,709.76 SUBTOTAL CASH REQUIREMENTS $332,295.82 CREDITS TO THE CASH REQUIREMENTS WITH THE FINAL PLAT Outlot A (Deeded to the City) (Stormwater Basin) $3,025.00 TOTAL CASH REQUIREMENT WITH FINAL PLAT $329,270.82 POST PLAT CASH CREDITS * Hamburg Ave Watermain Oversizing (Trunk Water Fund) ***City Share of 200th Street Construction $9,694.00 150,000.00 ESTIMATED POST PLAT CREDITS TO CASH REQUIREMENT = $159,694.00 POST PLAT CASH ESCROW **City Share of Hamburg Avenue Construction with CP 15-12 $58,500.00 ESTIMATED POST PLAT ESCROW REQUIRED BY DEVELOPER = $58,500.00 *Based on estimate provided by the Developer’s engineer. The City will provide the credit for the Hamburg Avenue watermain installation following construction based on true project costs and quantities, within 30 days of receipt of written request for payment conditioned on the following: 1. Watermain has been inspected, tested and accepted by the City. 2. Developer has submitted to the City the final pay estimate, invoice, and lien waiver from the contractor. The City will review the final pay estimate and quantities for accuracy. **The Developer’s financial responsibilities will be determined following completion of City Project 15-12 based on true project costs and quantities and will be billed to the Developer within 6 months of final acceptance of the improvements. The Developer shall reimburse the City within 30 days of receipt of an invoice. Future Building Permits will not be issued if payment is not received within 30 days. *** The estimated reimbursement is $150,000.00. Reimbursement will be based on true project costs and quantities and shall be contingent on a) the work being consistent with plans approved by the City Engineer, and b) the work being consistent with a contract entered into by the Developer and approved by the City Engineer prior to execution. 33. WARRANTY. The Developer warrants all improvements required to be constructed by it pursuant to this Contract against poor material and faulty workmanship. The warranty period for streets is one year. The warranty period for underground utilities is two years and shall commence following completion and acceptance by City Council. The one year warranty period on streets shall commence after the final wear course has been installed and accepted by the City Council. The Developer shall post maintenance bonds in the amount of twenty-five percent (25%) of final certified construction costs to 18 Berres Ridge 5th Addition 201165v11 secure the warranties. The City shall retain ten percent (10%) of the security posted by the Developer until the maintenance bonds are furnished to the City or until the warranty period expires, whichever first occurs. The retainage may be used to pay for warranty work. The City’s standard specifications for utility and street construction identify the procedures for final acceptance of streets and utilities. 34. RESPONSIBILITY FOR COSTS. A. Except as otherwise specified herein, the Developer shall pay all costs incurred by it or the City in conjunction with the development of the plat, including but not limited to Soil and Water Conservation District charges, legal, planning, engineering and construction observation inspection expenses incurred in connection with approval and acceptance of the plat, the preparation of this Contract, review of construction plans and documents, and all costs and expenses incurred by the City in monitoring and inspecting development of the plat. B. The Developer shall hold the City and its officers, employees, and agents harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat approval and development. The Developer shall indemnify the City and its officers, employees, and agents for all costs, damages, or expenses which the City may pay or incur in consequence of such claims, including attorneys' fees. C. The Developer shall reimburse the City for costs incurred in the enforcement of this Contract, including engineering and attorneys' fees. D. The Developer shall pay, or cause to be paid when due, and in any event before any penalty is attached, all special assessments referred to in this Contract. This is a personal obligation of the Developer and shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt plat development and construction until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of eighteen percent (18%) per year. Additionally, the 19 Berres Ridge 5th Addition 201165v11 Developer shall pay in full all bills submitted to it by the City prior to any reductions in the security for the development. F. In addition to the charges and special assessments referred to herein, other charges and special assessments may be imposed such as but not limited to sewer availability charges ("SAC"), City water connection charges, City sewer connection charges, and building permit fees. 35. DEVELOPER’S DEFAULT. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer, except in an emergency as determined by the City, is first given notice of the work in default, not less than forty-eight (48) hours in advance. This Contract is a license for the City to act, and it shall not be necessary for the City to seek a Court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. 36. MISCELLANEOUS. A. The Developer represents to the City that the plat complies with all city, county, metropolitan, state, and federal laws and regulations, including but not limited to: subdivision ordinances, zoning ordinances, and environmental regulations. If the City determines that the plat does not comply, the City may, at its option, refuse to allow construction or development work in the plat until the Developer does comply. Upon the City's demand, the Developer shall cease work until there is compliance. B. Third parties shall have no recourse against the City under this Contract. C. Breach of the terms of this Contract by the Developer shall be grounds for denial of building permits, including lots sold to third parties. D. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract. 20 Berres Ridge 5th Addition 201165v11 E. Grading, curbing, and one lift of asphalt shall be installed on all public and private streets prior to issuance of any building permits, except 3 model homes on lots acceptable to the Building Official. Approval of an administrative permit in compliance with Chapter 27 of the City’s zoning ordinance is required prior to the construction of any model homes. F. If building permits are issued prior to the acceptance of public improvements, the Developer assumes all liability and costs resulting in delays in completion of public improvements and damage to public improvements caused by the City, Developer, its contractors, subcontractors, material men, employees, agents, or third parties. No sewer and water connections or inspections may be conducted and no one may occupy a building for which a building permit is issued on either a temporary or permanent basis until the streets needed for access have been paved with a bituminous surface and the utilities are accepted by the City Engineer. G. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. H. This Contract shall run with the land and may be recorded against the title to the property. In the event this Contract is recorded, the City covenants to provide a recordable Certificate of Completion promptly upon the completion of the work and responsibilities required herein, payment of all costs and fees required and compliance with all terms of the Contract. The Developer covenants with the City, its successors and assigns, that the Developer is well seized in fee title of the property being final platted and/or has obtained consents to this Contract, in the form attached hereto, from all parties who have an interest in the property; that there are no unrecorded interests in the property being final platted; and that the Developer will indemnify and hold the City harmless for any breach of the foregoing covenants. I. Insurance. Prior to execution of the final plat, Developer and its general contractor shall furnish to the City a certificate of insurance showing proof of the required insurance required 21 Berres Ridge 5th Addition 201165v11 under this Paragraph. Developer and its general contractor shall take out and maintain or cause to be taken out and maintained until six (6) months after the City has accepted the public improvements, such insurance as shall protect Developer and its general contractor and the City for work covered by the Contract including workers’ compensation claims and property damage, bodily and personal injury which may arise from operations under this Contract, whether such operations are by Developer and its general contractor or anyone directly or indirectly employed by either of them. The minimum amounts of insurance shall be as follows: Commercial General Liability (or in combination with an umbrella policy) $2,000,000 Each Occurrence $2,000,000 Products/Completed Operations Aggregate $2,000,000 Annual Aggregate The following coverages shall be included: Premises and Operations Bodily Injury and Property Damage Personal and Advertising Injury Blanket Contractual Liability Products and Completed Operations Liability Automobile Liability $2,000,000 Combined Single Limit – Bodily Injury & Property Damage Including Owned, Hired & Non-Owned Automobiles Workers Compensation Workers’ Compensation insurance in accordance with the statutory requirements of the State of Minnesota, including Employer’s Liability with minimum limits are as follows: • $500,000 – Bodily Injury by Disease per employee • $500,000 – Bodily Injury by Disease aggregate • $500,000 – Bodily Injury by Accident The Developer’s and general contractor’s insurance must be “Primary and Non-Contributory”. All insurance policies (or riders) required by this Contract shall be (i) taken out by and maintained with responsible insurance companies organized under the laws of one of the states of the United States and qualified to do business in the State of Minnesota, (ii) shall name the City, its employees and agents as additional insureds (CGL and umbrella only) by 22 Berres Ridge 5th Addition 201165v11 endorsement which shall be filed with the City. A copy of the endorsement must be submitted with the certificate of insurance. Developer’s and general contractor’s policies and Certificate of Insurance shall contain a provision that coverage afforded under the policies shall not be cancelled without at least thirty (30) days’ advanced written notice to the City, or ten (10) days’ notice for non-payment of premium. An Umbrella or Excess Liability insurance policy may be used to supplement Developer’s or general contractor’s policy limits on a follow-form basis to satisfy the full policy limits required by this Contract. J. Indemnification. To the fullest extent permitted by law, Developer agrees to defend, indemnify and hold harmless the City, and its employees, officials, and agents from and against all claims, actions, damages, losses and expenses, including reasonable attorney fees, arising out of Developer’s negligence or its performance or failure to perform its obligations under this Contract. Developer’s indemnification obligation shall apply to Developer’s general contractor, subcontractor(s), or anyone directly or indirectly employed or hired by Developer, or anyone for whose acts Developer may be liable. Developer agrees this indemnity obligation shall survive the completion or termination of this Contract. K. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, express or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. L. The Developer may not assign this Contract without the written permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the 23 Berres Ridge 5th Addition 201165v11 Developer sells one or more lots, the entire plat, or any part of it, until the City’s issuance of a Certificate of Completion and Release. M. Retaining walls that require a building permit shall be constructed in accordance with plans and specifications prepared by a structural or geotechnical engineer licensed by the State of Minnesota. Following construction, a certification signed by the design engineer shall be filed with the Building Official evidencing that the retaining wall was constructed in accordance with the approved plans and specifications. All retaining walls identified on the development plans and by special conditions referred to in this Contract shall be constructed before any other building permit is issued for a lot on which a retaining wall is required to be built. N. Should the Developer convey any lot or lots in the Development to a third party, the City and the owner of that lot or those lots may amend this Development Contract or other city approvals or agreements for development or use of those lots without the approval or consent of the Developer or other lot owners in the Development. Private agreements between the owners of lots within the Development for shared service or access and related matters necessary for the efficient use of the Development shall be the responsibility of the lot owners and shall not bind or restrict City authority to approve applications from any lot owner in the Development. 37. NOTICES. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by certified mail at the following address: 10519 165th Street West, Lakeville, MN 55044. Notices to the City shall be in writing and shall be either hand delivered to the City Administrator, or mailed to the City by certified mail in care of the City Administrator at the following address: Lakeville City Hall, 20195 Holyoke Avenue, Lakeville, Minnesota 55044. 24 Berres Ridge 5th Addition 201165v11 CITY OF LAKEVILLE BY: ___________________________________________ Douglas P. Anderson, Mayor (SEAL) AND __________________________________________ Charlene Friedges, City Clerk STATE OF MINNESOTA ) )ss. COUNTY OF DAKOTA ) The foregoing instrument was acknowledged before me this ________ day of ______________, 2019, by Douglas P. Anderson and by Charlene Friedges, the Mayor and City Clerk of the City of Lakeville, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. ______________________________________________ NOTARY PUBLIC 26 201165v11 EXHIBIT “A” TO DEVELOPMENT CONTRACT Legal Description of Property Being Final Platted as ____________________________ Outlots A and B, BERRES RIDGE 4TH ADDITION, according to the recorded plats thereof, Dakota County, Minnesota. Together with Outlots C, D, E, and F, BERRES RIDGE 3RD ADDITION, according to the recorded plats thereof, Dakota County, Minnesota. 1 City of Lakeville Planning Department Memorandum To: Daryl Morey, Planning Director From: Kris Jenson, Associate Planner Date: March 25, 2019 Subject: Berres Ridge 5th Addition Final Plat Application Action Deadline: April 1, 2019 INTRODUCTION Berres Ridge Development, LLC has submitted an application and plans for the final plat of Berres Ridge 5th Addition, which includes 34 single family lots located west of Hamburg Avenue and north of 202nd Street (CSAH 50). The original Berres Ridge preliminary plat of 366 single family lots was approved by the City Council on January 5, 2015, the Berres Ridge 1st Addition final plat of 63 single family lots was approved on May 4, 2015, a revised Berres Ridge 2nd Addition preliminary plat for 135 single family lots was approved by the City Council on May 2, 2016, and the Berres Ridge 2nd Addition final plat of 63 single family lots was approved by the City Council on July 5, 2016. A revised phasing plan for the Berres Ridge development was approved by the City Council on January 3, 2017 and the Berres Ridge 3rd Addition final plat of 47 single family lots was approved on March 6, 2017. The Berres Ridge 4th Addition final plat of 28 single family lots was approved by the City Council on March 5, 2018. The lot, block and street design of the Berres Ridge 5th Addition final plat is consistent with the approved Berres Ridge 2nd Addition preliminary plat. The final plat plans have been reviewed by Engineering and Parks and Recreation staff. EXHIBITS A. Aerial Location Map B. Approved Preliminary Plat C. Phasing Plan D. Site Layout E. Final Plat (3 Pages) 2 PLANNING ANALYSIS Zoning. Thirty of the single family lots within the Berres Ridge 5th Addition final plat are zoned RS-3, Single Family Residential District. The remaining four lots are zoned RS-4, Single Family Residential District. Existing Conditions. The Berres Ridge 5th Addition final plat area consists of six parcels, Outlots C, D, E, and F, Berres Ridge 3rd Addition and Outlots A and B, Berres Ridge 4th Addition. The outlots are both undeveloped and have been previously farmed. Lot Area. The minimum lot size for single-family lots within the RS-3 District is 11,000 square feet for interior lots and 12,500 square feet for corner lots. The minimum lot size for single- family lots within the RS-4 District is 8,400 square feet for interior lots and 10,200 square feet for corner lots. All lots meet the minimum size requirement of their respective zoning district. Lot Width. The minimum lot width for single-family lots within the RS-3 District is 85 feet for interior lots and 100 feet for corner lots. The minimum lot width for single family lots within the RS-4 District is 70 feet for interior lots and 85 feet for corner lots. All lots meet the minimum lot width requirement of their respective zoning district. Setbacks. Setback requirements for single family lots in the RS-3 and RS-4 Districts is outlined below: Front Side (Interior) Side (Corner) Rear RS-3 30 feet 10 feet 20 feet 30 feet RS-4 20 feet to principal building, 25 feet to garage face 7 feet 20 feet 30 feet The proposed building pads meet the minimum setback requirements for interior and corner lots of their respective zoning district. Development Density. The Berres Ridge 5th Addition final plat consists of 34 new single-family lots and four outlots on 69.88 acres. This results in a gross density of 0.49 units per acre. The net density, excluding outlots is 2.45 units per acre. Phasing. Berres Ridge is now anticipated to be developed in eight phases. This is the fifth phase of development and there will be 131 remaining single-family lots to be final platted and developed after the platting of Berres Ridge 5th Addition. The current phasing plan is attached as Exhibit C. Model Homes. Based on the 34 single family lots in the Berres Ridge 5th Addition final plat, building permits may be issued for up to three (3) model homes. The location of such model homes is subject to approval of the Building Official. Outlots. There are four outlots proposed with the Berres Ridge 5th Addition final plat. 3 • Outlot A is 0.55 acres and will be deeded to the City for stormwater management purposes. • Outlot B is 37.67 acres and will be retained by the developer for future development. • Outlot C is 16.82 acres and will be retained by the developer for future development. • Outlot D is 0.96 acres and will be retained by the developer for future development. Access. Berres Ridge 5th Addition will have access from 200th Street and Hamburg Avenue. Streets & Right-of-Way. Berres Ridge 5th Addition will include construction of the following streets: Hamburg Avenue between 202nd Street (CSAH 50) and 200th Street will be reconstructed with the west half being 20 feet in width with curb and gutter and a 5-foot-wide sidewalk and the east half being 12 feet wide with a 3-foot aggregate shoulder-rural section. When the property on the east side of Hamburg Avenue, between 202nd Street and 200th Street is developed, the street will be widened to a 20-foot-wide urban section with a 5-foot-wide sidewalk. North of 200th Street, Hamburg Avenue will be a 40-foot-wide, two-lane street with 5-foot-wide sidewalks on both sides of the street. Due to Hamburg Avenue functioning as a major collector street, all corner lots must have their driveway access from the adjacent side street. This applies to the following lots: • Lot 5, Block 1 • Lots 11 and 13, Block 2 • Lots 1 and 8, Block 3 • Lot 1, Block 6 • Lots 1 and 2, Block 7 • Lot 1, Block 8 Harrisburg Way will be a 32-foot-wide residential street within 60 feet of right-of-way with a five (5) foot wide sidewalk along the east side of the street. Henley Lane will be continued as a 32-foot-wide residential street within a 60-foot right-of-way with a five (5) foot wide sidewalk along the west side of the street. Trails. There are no trails proposed to be constructed with the Berres Ridge 5th Addition final plat. Landscaping. A landscape plan was submitted for the stormwater ponds within Outlots A and B. The plan proposes a mix of overstory and evergreen trees as well as shrubs around the ponds. An escrow of $15,520 is required to be submitted with the final plat. Park Dedication. The City’s 2015 Parks, Trail, and Open Space Plan does not identify a park need within the proposed plat area. The park dedication requirement will be satisfied by a cash fee as required by Section 10-4-8 of the Subdivision Ordinance. 4 Tree Inventory. The Berres Ridge 5th Addition tree inventory identifies 70 significant trees. All of the trees are on private property to the east of future Hamburg Avenue and are proposed to be saved. Wetlands. There are no wetlands within the area of the Berres Ridge 5th Addition final plat. Grading, Drainage and Erosion Control. The final plat includes grading, drainage and erosion control plans. Grading, drainage and erosion control is discussed in more detail in the March 25, 2019 engineering report. Subdivision Identification Sign. The developer is not proposing a subdivision identification sign within this phase of the final plat. RECOMMENDATION The Berres Ridge 5th Addition final plat is consistent with the approved preliminary plat and complies with the requirements of the Zoning and Subdivision Ordinances. Planning Department staff recommends approval of the Berres Ridge 5th Addition final plat subject to the following conditions: 1. The recommendations listed in the March 25, 2018 engineering report. 2. Five-foot-wide concrete sidewalks shall be constructed at the developer’s expense as shown on the approved final plat plans. 3. A landscape escrow of $15,520 is required to be submitted with the final plat. ± Berres Ridge 5th Addition Plat Area 200TH ST HARVEST DRHARNESS AVEHEATH AVEHEXHAMW AYHAMBURG AVEHAMLET AVE202ND ST (CSAH 50) City of LakevilleLocation MapBerres Ridge5th AdditionFinal PlatEXHIBIT A                                                                                                                         PH-ENG-115237-PHASING-COVER 1 BERRES RIDGE PHASING PLAN LAKEVILLE, MINNESOTA PHASING PLAN Know what's below. before you dig.Call R I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c OFBERRES RIDGE PHASE PLAN LAKEVILLE, MINNESOTA BERRES RIDGE DEVELOPMENT COMPANY LLC. 10519 165TH STREET WEST 10-06-2016 NAP JMM Name Reg. No.Date Revisions Date Designed Drawn 2016 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 47504 10-06-2016 Brian N. Molinaro LAKEVILLE, MN 55044 1 1ST ADDITIONBERRES RI D GE 3RD A D DITI O N BERR ES RI D G E 2ND A D DI TI O N BERRES R IDGEFUTURE PHASE BERRES RIDGE 1ST ADDITIONBERRES RIDGE4TH ADDITIONBERR E S R IDG E 5 TH ADD I T ION FUT U R E P H A S E REGISTERED PROFESSIONAL CIVIL ENGINEER PREPARED BY PIONEER ENGINEERING, P.A. REGISTERED PROFESSIONAL LAND SURVEYOR DEVELOPER REG. NO. 42299 BRIAN N. MOLINARO PETER J. HAWKINSON REG. NO. 47504 BERRES RIDGE DEVELOPMENT COMPANY LLC. 10519 165TH STREET WEST LAKEVILLE, MN 55044 PROPOSED DEVELOPMENT ZONING RS-3 TOTAL SINGLE FAMILY UNITS: 34 TOTAL UNITS: 34 SITE DATA: TOTAL AREA: 69.9 ACRES TOTAL LOT AREA: 10.1 ACRES TOTAL OUTLOT AREA: 56.0 ACRES TOTAL RIGHT-OF-WAY AREA: 3.8 ACRES PRESENT ZONING: RS-3 Front: Garage foundation to R-O-W =30' House foundation to R-O-W =30' Side =10' Rear=30' Corner =20' MIN AREA: LOT AREA =11,000 SF CORNER LOT AREA =12,500 SF LOT WIDTH: LOT WIDTH =85' CORNER LOT WIDTH =100' SETBACKS RS-3 Wetland Buffer =20' Rear=10' Side Lowest Opening = EOF+1' Lowest Floor = HWL+3' LOCATION MAP 05-ENG-115237-SHEET-COVR 1.10 BERRES RIDGE 5TH ADDITION COVER SHEET UTILITY, STREET & GRADING CONSTRUCTION PLAN LAKEVILLE, MINNESOTA SHEET INDEX LEGEND SHEET COVER SHEET 1.10 1.20 PLAN & PROFILE 3.20 PLAN & PROFILE 4.10 - 4.13 PLAN & PROFILE DRAINTILE PLAN STORM SEWER STRUCTURE SCHEDULE 3.30-3.31 CITY DETAILS 5.10 - 5.13 2.10-2.12 3.10-3.14 SANITARY SEWER & WATERMAIN CONSTRUCTION STORM SEWER CONSTRUCTION STREET CONSTRUCTION MnDOT DETAILS 5.20 GRADING PLAN G1.1-G1.2 EROSION CONTROL PLAN G1.3-G1.4 GRADING DETAILS G1.6-G1.8 LANDSCAPE PLAN L1 I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 22OFBERRES RIDGE 5TH ADDITION LAKEVILLE, MN BERRES RIDGE DEVELOPMENT COMPANY 10519 165TH STREET WEST 10-31-2018 NAP/BNM BNM/NCR Name Reg. No.Date Revisions 1. 1-4-19 City Comments Date Designed Drawn 2018 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 47504 10-31-2018 Brian N. Molinaro LAKEVILLE, MN 55044 2. 2-20-19 City Hydrology Comments SEEDING PLAN G1.5 TREE PRESERVATION PLAN T1 CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS City of Lakeville Public Works – Engineering Division Memorandum To: Kris Jenson, Associate Planner From: Alex Jordan, Assistant City Engineer McKenzie L. Cafferty, Environmental Resources Manager John Hennen, Parks and Recreation Director Copy: Zach Johnson, City Engineer Jerilyn Erickson, Finance Director Gene Abbott, Building Official Date: March 25, 2019 Subject: Berres Ridge 5th Addition • Final Plat Review • Final Grading and Erosion Control Plan Review • Utility Plan Review • Final Tree Preservation Plan Review BBAACCKKGGRROOUUNNDD Berres Ridge Development Company, LLC has submitted a final plat named Berres Ridge 5th Addition. This is the fifth phase of the Berres Ridge preliminary plat approved by the City Council on January 5, 2015 and the fourth phase of the Berres Ridge 2nd Addition preliminary plat approved by the City Council on May 2, 2016. The proposed subdivision is located west of and adjacent to Hamburg Avenue, north of and adjacent to 202nd Street and east of Harvest Drive. The parent parcels consist of Outlot C, D, E, and F Berres Ridge 3rd Addition, and Outlots A and B, Berres Ridge 4th Addition and is zoned RS-3 Single Family Residential and RS-4 Single Family Residential. The final plat consists of thirty-four (34) single-family lots within eight (8) blocks and four (4) outlots on 69.88 acres. The outlots created with the final plat shall have the following use: Outlot A: Stormwater Management Basin; to be deeded to the City (0.55 acres) Outlot B: Future Development; to be retained by the Developer (37.67 acres) BBEERRRREESS RRIIDDGGEE 55TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT MMAARRCCHH 2255,, 22001199 PPAAGGEE 22 OOFF 1111 Outlot C: Future Development; to be retained by the Developer (16.82 acres) Outlot D: Future Development; to be retained by the Developer (0.96 acres) The proposed development will be completed by: Developer: Berres Ridge Development Company, LLC Engineer/Surveyor: Pioneer Engineering, P.A. SSIITTEE CCOONNDDIITTIIOONNSS The Berres Ridge 5th Addition site is undeveloped cultivated agricultural land. A small cluster of trees is scatted among Outlot B, along the west plat boundary. A large portion of the parent parcels were previously mass graded with the Berres Ridge 4th Addition improvements. The headwaters of a Vermillion River Watershed Joint Powers Organization (VRWJPO) Water Quality Corridor bisects Outlot B, north of the proposed development improvements. SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT 202nd Street (CSAH 50) Berres Ridge 5th Addition is located north of and adjacent to 202nd Street, a minor arterial County highway, as identified in the City’s Transportation Plan. 202nd Street in the vicinity of the site is a two-lane undivided rural roadway. The City and County’s current Capital Improvement Plan (CIP) programs the reconstruction of 202nd Street adjacent to the plat in 2019 (City Project No. 15-12). The improvement project will include the reconstruction and widening of 202nd Street to a two-lane divided roadway with turn lanes, significant profile adjustment to the Hamburg Avenue intersection, trails along both sides of 202nd Street, and traffic controls at Holyoke Avenue and Cedar Avenue. The Developer granted the City a temporary construction easement on Outlot C, Berres Ridge 3rd Addition for the 202nd Street improvements. The temporary easement will be assigned to Lot 1, Block 8 and will expire on December 31, 2020. Hamburg Avenue Berres Ridge 5th Addition is located north and west of and adjacent to Hamburg Avenue, a minor collector roadway as identified in the City’s Transportation Plan. Hamburg Avenue is currently a 24-foot wide gravel roadway adjacent to the plat. The Developer shall re-construct Hamburg Avenue, between 202nd Street and 200th Street with the final improvements consistent with the Revised Phasing Plan approved by the City Council on January 3, 2017 and the Berres Ridge 1st Addition Development Contract. Hamburg Avenue shall be constructed to include the following: the west ½ of Hamburg Avenue between 202nd Street and 200th Street shall be 20-feet in width with concrete curb and gutter and a 5-foot wide sidewalk; the east ½ of Hamburg Avenue between 202nd Street and 200th Street shall be 12- feet wide with a 3-foot aggregate shoulder-rural section. The Developer is required to obtain the necessary easements to construct the east ½ of Hamburg Avenue. When the property east of and adjacent to Hamburg Avenue south of 200th Street is developed, that Developer will be required to widen the easterly ½ to a 20-foot wide urban section and construct a 5- foot wide sidewalk. BBEERRRREESS RRIIDDGGEE 55TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT MMAARRCCHH 2255,, 22001199 PPAAGGEE 33 OOFF 1111 The Developer shall construct Hamburg Avenue north of 200th Street as a 40-foot wide, two lane urban roadway with 5-foot wide sidewalks along both sides of the street. A sidewalk along the east side of Hamburg Avenue directly adjacent to PID No.220210076016 will not be constructed with the development improvements (as shown on the final plat plans). This sidewalk will be required to be constructed at the time PID No. 220210076016 is final platted into lots and blocks. The Developer is dedicating the necessary right-of-way, as shown on the final plat. A barricade will be placed at the north end of Hamburg Avenue until it is extended in the future. Hamburg Avenue will likely function as a major collector roadway due to the projected traffic volumes and proposed connections to minor arterial roadways. Consequently, the Developer shall limit the number of driveways that have direct access to Hamburg Avenue. All corner lots that are located along Hamburg Avenue shall have their driveways access the adjacent side street. This applies to the following lots: • Lot 5, Block 1 • Lots 11 and 13, Block 2 • Lots 1 and 8, Block 3 • Lot 1, Block 6 • Lots 1 and 2, Block 7 • Lot 1, Block 8 Due to the profile adjustment at the Hamburg Avenue intersection, a portion of Hamburg Avenue between 202nd Street and 200th Street will be reconstructed by Dakota County with the 202nd Street Reconstruction Project. The Developer shall reimburse the City for the City’s share of the improvements to Hamburg Avenue required by the Berres Ridge 1st Addition Development Contract, which will be constructed by Dakota County. The Developer’s financial responsibilities will be determined following completion of City Project 15-12 and will be billed to the Developer within 6 months of final acceptance of the improvements. The Developer shall reimburse the City within 30 days of receipt of an invoice. The Developer granted the City a temporary construction easement on Outlot D, Berres Ridge 3rd Addition for the 202nd Street and Hamburg Avenue improvements. The temporary easement will be assigned to Lots 1 and 2, Block 7 and will expire on December 31, 2020. 200th Street Berres Ridge 5th Addition is located north of and adjacent to 200th Street, a minor collector roadway as identified in the City’s Transportation Plan. 200th Street east of Hamburg Avenue is currently a 24-foot wide gravel roadway. 200th Street will provide a direct access route to Cedar Avenue (CSAH 23) from the Berres Ridge subdivision. The traffic impact study completed with the Environmental Assessment Worksheet (EAW) identified that 1,400 average daily trips along 200th Street between Cedar Avenue and Hamburg Avenue would be generated by the proposed development. The current volumes along 200th Street is 100 vehicles per day. The City’s Traffic Engineering consultant, SRF Consulting Group, Inc. reviewed the traffic impact study during the City’s review of the EAW. The results of the review were as follows: BBEERRRREESS RRIIDDGGEE 55TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT MMAARRCCHH 2255,, 22001199 PPAAGGEE 44 OOFF 1111 • The capacity of gravel surfaced roadways is 500 vehicles per day. Beyond this daily volume threshold, nearly continuous maintenance and grading is required to provide passable surface and reasonably comfortable driving experience. Since over 1,000 daily site-generated vehicles trips could use 200th Street east of Hamburg Avenue, 200th Street should upgraded to a paved roadway east of Hamburg Avenue in conjunction with the proposed Berres Ridge Development to limit the continuous maintenance and grading of the gravel roadway. • In order to mitigate the traffic impact on the gravel surfaced section of 200th Street east of Hamburg Avenue, the Developer has proposed to phase the development construction from west to east, delaying the direct connection to Hamburg Avenue and 200th Street for possible five to six years, depending on market conditions. To improve public safety, and limit the required continuous gravel roadway routine maintenance/road stabilization generated by the additional traffic, the Developer shall improve 200th Street with the Berres Ridge 5th Addition final plat improvements. The Developer shall pave 200th Street, including subgrade correction and aggregate base placement, between Hamburg Avenue and Cedar Avenue. The Developer is eligible for reimbursement of the subgrade correction, aggregate base placement, minor ditch grading, restoration and its share of mobilization and traffic control. The estimated reimbursement is $150,000.00. Reimbursement shall be contingent on a) the work being consistent with plans approved by the City Engineer, and b) the work being consistent with a contract entered into by the Developer and approved by the City Engineer, including any necessary City approved change orders, prior to execution. The Developer agrees to obtain two estimates for the work to ensure competitive pricing. The Developer shall furnish a letter of credit for the Developer’s share of the improvements, estimated at $115,000.00, which includes paving and the Developer’s share of mobilization and traffic control costs. 200th Street must be completed and accepted prior to the issuance of building permits for Berres Ridge 5th Addition, except for approved model homes on lots approved by the Building Official. Harrisburg Way and Henley Lane Development of Berres Ridge 5th Addition includes the construction of Harrisburg Way and Henley Lane, both local streets. The local streets are designed as 32-foot wide, two-lane urban roadways with 5-foot wide concrete sidewalks along one side of each street. The Developer is dedicating the necessary right-of-way as shown on the final plat. CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS Construction traffic access and egress for grading, utility and street construction shall be restricted to Hamburg Avenue by way of 200th Street. The Developer shall coordinate construction activities with the Dakota County contractor for the 202nd Street/Hamburg Avenue improvements. BBEERRRREESS RRIIDDGGEE 55TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT MMAARRCCHH 2255,, 22001199 PPAAGGEE 55 OOFF 1111 PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS The Park Dedication requirement has not been collected on the parent parcels and will be satisfied through a cash contribution that shall be paid with the final plat. The Park Dedication Fee will be based on the rate in effect at the time of final plat approval, calculated as follows: 34 units x $4,294.00 = $145,996.00 Total Units In Berres Ridge 5th Addition Park Dedication Fee Park Dedication Requirement Development of Berres Ridge 5th Addition includes the construction of public sidewalks. Five- foot wide concrete sidewalks, with pedestrian curb ramps, will be installed along one side of Harrisburg Way and Henley Lane and both sides of Hamburg Avenue, consistent with the information included above. UUTTIILLIITTIIEESS SSAANNIITTAARRYY SSEEWWEERR Berres Ridge 5th Addition is located within subdistrict SC-10670 of the South Creek sanitary sewer district as identified in the City’s Comprehensive Sewer Plan. The City’s engineering consultant, SEH, completed a sanitary sewer analysis with the Berres Ridge preliminary plat to determine the capacity of the sanitary sewer in the South Creek sanitary sewer district downstream of the Berres Ridge site. The study concluded that the downstream facilities in the South Creek district have sufficient capacity to serve the Berres Ridge subdivision; however, there is not sufficient capacity to add any additional flow to the downstream facilities. The sewer shed boundaries for SC-10670, SC-10070, and FO-60210 were revised and the flow was added to SC-10785 with the approved Berres Ridge preliminary plat. The sanitary sewer design for Berres Ridge 5th Addition is consistent with the approved sewer district revisions. Wastewater will be conveyed to the MCES Farmington Interceptor and continue to the Empire Wastewater Treatment Facility. Development of Berres Ridge 5th Addition includes the extension of public sanitary sewer. Sanitary sewer will be extended within the subdivision to provide sanitary sewer service to the development. The Sanitary Sewer Availability Charge has not been collected on the parent parcels and shall be paid with the final plat. The fee will be based on the current rate in effect at the time of final plat approval, calculated as follows: 34 units x $327.00 = $11,118.00 Total Units In Berres Ridge 5th Addition Sanitary Sewer Availability Charge Per Unit Sanitary Sewer Availability Charge Required With Berres Ridge 5th Addition WWAATTEERRMMAAIINN Development of Berres Ridge 5th Addition includes the extension of public watermain. Watermain will be extended within the development to provide water service to the subdivision. BBEERRRREESS RRIIDDGGEE 55TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT MMAARRCCHH 2255,, 22001199 PPAAGGEE 66 OOFF 1111 Consistent with the City’s Water Plan and the Berres Ridge 1st Addition Development Contract, the Developer shall extend 12-inch watermain along Hamburg Avenue from 200th Street to the north extent of the Hamburg Avenue right-of-way. The City will credit the Developer’s cash fees an estimated $9,694 for the oversizing of the 12-inch watermain. The City will provide the credit for the watermain installation following construction based on true project quantities and costs, within 30 days of receipt of written request for payment conditioned on the following: 1. Watermain has been inspected, tested and accepted by the City. 2. Developer has submitted to the City the final pay estimate, invoice, and lien waiver from the contractor. DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG Berres Ridge 5th Addition is located within subdistrict SC-76 of the South Creek stormwater district and FO-26 of the Farmington Outlet stormwater district and as identified in the City’s Water Resources Management Plan. The headwaters of a Vermillion River Watershed Joint Powers Organization (VRWJPO) Water Quality Corridor bisects Outlot B north of the proposed improvements. Development of Berres Ridge 5th Addition includes the construction of public stormwater management basins to collect and treat the stormwater runoff generated from the site. The basins will provide water quality treatment and rate control of the stormwater runoff generated from the Berres Ridge 5th Addition subdivision. The permanent stormwater management basins will be located within Outlots A and B. The Developer shall convey a temporary drainage and utility easement over the area of the basin on Outlot B prior to City Council consideration of the final plat. The stormwater basin design on Outlot B will be reviewed with future phases of Berres Ridge for approval. The final grading plan shall identify all fill lots in which the building footings will be placed on fill material. The grading specifications shall also indicate that all embankments meet FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings placed on fill material are appropriately constructed. Building permits will not be issued until a soils report and an as-built certified grading plan have been submitted and approved by City staff. Berres Ridge 5th Addition contains more than one acre of site disturbance. A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. BBEERRRREESS RRIIDDGGEE 55TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT MMAARRCCHH 2255,, 22001199 PPAAGGEE 77 OOFF 1111 SSTTOORRMM SSEEWWEERR Development of Berres Ridge 5th Addition includes the construction of public storm sewer systems. Storm sewer will be installed within the subdivision to collect and convey stormwater runoff generated from within the public right-of-way and lots to the public stormwater management basins located within Outlots A and B. The Developer is constructing a temporary storm sewer outlet for the basin on Outlot B. The Developer shall remove this storm sewer in the future when the temporary outlet is no longer necessary. The Developer shall grant to the City a temporary easement on Outlots C and D for drainage and utility purposes prior to City Council consideration of the final plat. Draintile construction is required in areas of non-granular soils within Berres Ridge 5th Addition for the street sub-cuts and lots. Any additional draintile construction, including perimeter draintile required for building footings, which is deemed necessary during construction shall be the developer’s responsibility to install and finance. The Trunk Storm Sewer Area Charge has not been collected on the parent parcels, and must be paid with the final plat, calculated as follows: Gross Area of Berres Ridge 5th Addition 3,043,939.00 s.f. Less Area of Outlot A (Stormwater Management Basin) (-) 24,173.00 s.f. Less Area of Outlot B (Future Development) (-) 1,640,935.00 s.f. Less Area of Outlot C (Future Development) (-) 732,664.00 s.f. Less Area of Outlot D (Future Development) (-) 41,779.00 s.f. Total = 604,388.00 s.f. 604,388.00 s.f. x $0.178/s.f. = $107,581.06 Net Area of Berres Ridge 5th Addition Area Charge Total The remainder of the Trunk Storm Sewer Area Charge will be collected at the time Outlots B, C, and D are final platted into lots and blocks, at the rate in effect at the time of final plat. The Developer will receive a credit to the Trunk Storm Sewer Area Charge for deeding Outlot A to the City, consistent with City policy. The credit is based on the area of the outlot calculated at the rate of $5,550.00 per acre, and will be applied to the Berres Ridge 5th Addition final plat cash fees. The credit is calculated as follows: 0.55 acres x $5,500/acre = $3,025.00 Total Area of Outlot A Per Acre Credit Total Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final construction plans. BBEERRRREESS RRIIDDGGEE 55TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT MMAARRCCHH 2255,, 22001199 PPAAGGEE 88 OOFF 1111 FEMA FLOODPLAIN ANALYSIS Berres Ridge 5th Addition is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation, there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA. WWEETTLLAANNDDSS There are no wetlands on the site. A wetland determination was completed for the site with the Berres Ridge preliminary plat. TTRREEEE PPRREESSEERRVVAATTIIOONN A tree preservation plan has been submitted. All significant trees are located on private property east of future Hamburg Avenue and are proposed to be saved. EERROOSSIIOONN CCOONNTTRROOLL The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as developing a SWPPP for the site prior to construction. The permit requires that all erosion and sediment BMPS be clearly outlined in a site’s SWPPP. Changes made throughout construction should be documented in the SWPPP. Additional erosion control measures may be required during construction as deemed necessary by City staff or the Dakota County Soil and Water District. Any additional measures required shall be installed and maintained by the developer. SECURITIES The Developer shall provide a Letter of Credit as security for the Developer-installed improvements relating to Berres Ridge 5th Addition. Construction costs are based upon estimates submitted by the Developer’s engineer on October 24, 2018. CONSTRUCTION COSTS Sanitary Sewer $ 232,596.95 Watermain 191,531.50 Storm Sewer 365,697.80 Street Construction Hamburg Avenue 200th Street 533,552.93 256,831.12 115,000.00 Erosion Control, Stormwater and filtration Basins, Restoration, Grading and Grading Certification 128,448.40 SUBTOTAL - CONSTRUCTION COSTS $ 1,823,658.70 BBEERRRREESS RRIIDDGGEE 55TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT MMAARRCCHH 2255,, 22001199 PPAAGGEE 99 OOFF 1111 OTHER COSTS Developer’s Design (3.0%) $ 54,709.76 Developer’s Construction Survey (2.5%) 45,591.47 City’s Legal Expense (0.5%) 9,118.29 City Construction Observation (5.0%) 91,182.94 Developer’s Record Drawing (0.5%) 9,118.29 Landscaping Street Lights 15,520.00 7,200.00 Lot Corners/Iron Monuments 3,800.00 SUBTOTAL - OTHER COSTS $236,240.75 TOTAL PROJECT SECURITY $ 2,059,899.45 The Developer shall post a security to ensure the final placement of iron monuments at property corners with the final plat. The security is $100.00 per lot and outlot for a total of $3,800.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all irons have been placed following site grading, street and utility construction. CCAASSHH FFEEEESS A cash fee for traffic control signs is due with Berres Ridge 5th Addition. Street signing consists of six stop and street blade combination at $550.00 each, two stop signs at $375.00 each, two speed limit signs at $325.00 each, nine nine-button delineators at $125.00 each, three future thru street signs at $100.00 each, and a mobilization fee of $150.00 for a total of $6,275.00. If the street signs are installed during frost conditions, the Developer shall pay an additional $150.00 for each street sign location. A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat approval and is calculated as follows: 34 units x $36.48/unit. = $1,240.32 Total Units In Berres Ridge 5th Addition Streetlight Operating Fee Total A cash fee for one-year of environmental resources expenses shall be paid at the time of final plat approval and is calculated as follows: 34 units x $57.52/unit = $1,955.68 Total Units In Berres Ridge 5th Addition Environmental Resources Fee Total A cash fee for the preparation of record construction drawings and for upgrading the City base map shall be paid at the time of final plat approval and is calculated as follows: 38 units x $90.00/unit = $3,420.00 Lots/Outlots City Base Map Updating Fee Total BBEERRRREESS RRIIDDGGEE 55TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT MMAARRCCHH 2255,, 22001199 PPAAGGEE 1100 OOFF 1111 The Developer shall submit the final plat and construction drawings in an electronic format. The electronic format shall be in either .dwg (AutoCAD) or .dxf format. The Developer shall also pay a cash fee for City Engineering Administration. The fee for City Engineering Administration will be based on three percent (3.00%) of the estimated construction cost, or $55,504.76. CASH REQUIREMENTS Park Dedication Fee 145,996.00 Sanitary Sewer Availability Charge 11,118.00 Trunk Storm Sewer Area Charge 107,581.06 Traffic Control Signs 6,275.00 Streetlight Operating Fee 1,240.32 Environmental Resources Management Fee 1,955.68 City Base Map Updating Fee 3,420.00 City Engineering Administration (3.00%) 54,709.76 SUBTOTAL - CASH REQUIREMENTS $332,295.82 CREDITS TO THE CASH REQUIREMENTS WITH FINAL PLAT Outlot A (Deeded to the City) (Trunk Storm Sewer) $ 3,025.00 SUBTOTAL- CREDITS TO CASH REQUIREMENT TOTAL CASH REQUIREMENTS WITH FINAL PLAT = $3,025.00 = $329,270.82 POST PLAT CASH CREDITS * Hamburg Ave Watermain Oversizing (Trunk Water Fund) ***City Share of 200th Street Construction $9,694.00 $150,000.00 ESTIMATED POST PLAT CREDITS TO CASH REQUIREMENT = $ 159,694.00 POST PLAT CASH ESCROW **City Share of Hamburg Avenue Construction with CP 15-12 $58,500.00 ESTIMATED POST PLAT ESCROW REQUIRED BY DEVELOPER = $58,500.00 *Based on estimate provided by the Developer’s engineer. The City will provide the credit for the Hamburg Avenue watermain installation following construction based on true project costs and quantities, within 30 days of receipt of written request for payment conditioned on the following: 1. Watermain has been inspected, tested and accepted by the City. 2. Developer has submitted to the City the final pay estimate, invoice, and lien waiver from the contractor. The City will review the final pay estimate and quantities for accuracy. **The Developer’s financial responsibilities will be determined following completion of City Project 15-12 based on true project costs and quantities and will be billed to the Developer within 6 months of final acceptance of the improvements. The Developer shall reimburse the City within 30 days of receipt of an invoice. BBEERRRREESS RRIIDDGGEE 55TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT MMAARRCCHH 2255,, 22001199 PPAAGGEE 1111 OOFF 1111 *** The estimated reimbursement is $150,000.00. Reimbursement will be based on true project costs and quantities shall be contingent on a) the work being consistent with plans approved by the City Engineer, and b) the work being consistent with a contract entered into by the Developer and approved by the City Engineer prior to execution. RREECCOOMMMMEENNDDAATTIIOONN Engineering recommends approval of the final plat, grading and erosion control plan, utility plan and tree preservation plan for Berres Ridge 5th Addition, subject to the requirements and stipulations within this report.