Loading...
HomeMy WebLinkAboutLA167593 - 18925 Iden Way Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: Plan Approval:________________________ Date: _______ 6 : 126 : 12 6 : 12 6 : 12 6 : 12 6 : 12 6 : 12 8 : 12 6 : 12 8 : 12 6 : 12 4" LP TRIM AROUND WINDOW 3 '-0 " 6 : 126 : 12 6 : 12 6 : 12 6 : 12 6 : 12 6 : 12 8 : 12 6 : 12 8 : 12 6 : 12 6 : 126 : 126 : 126 : 126 : 126 : 12 DASHED LINES REPRESENT PATIO WALKOUT OPTION DASHED LINES REPRESENT LOOKOUT/WALKOUT OPTION 6 : 126 : 126 : 126 : 126 : 126 : 12 8 : 12 5 1/2 : 125 1/2 : 12 8 : 128 : 12 DASHED LINES REPRESENT LO/WO FTG MIN 42" DASHED LINE REPRESENT LO/WO OPTION STEP FOUNDATION PER GRADE 8' MAIN LEVEL 8 : 12 5 1/2 : 125 1/2 : 12 8 : 128 : 12 8 : 12 8 : 12 8 : 12 8 : 12 8 : 12 DASHED LINES REPRESENT LO/WO FTG MIN 42" DASHED LINE REPRESENT LO/WO OPTION STEP FOUNDATION PER GRADE 8 : 12 8 : 12 8 : 12 8 : 12 8 : 12 T h e s e p l a n s a r e p r o p e r t y o f L o o m i s H o m e s L L C a n d m a y n o t b e r e p r o d u c e d o r u s e d w i t h o u t w r i t t e n c o n s e n t . SHEET: DATE: A-1 THE POPLAR II Overview: -Rambler Single-Family Home -1501 Finished Square Feet -1194 Unfinished Square Feet -3 Bedrooms 2 Full Bath -Three Stall Garage 1 8 9 2 5 I d e n W a y L a k e v i l l e , M N L o t 7 B l o c k 7 C h o k e C h e r r y H i l l s 2 n d 3/7/2019 ELEVATION A 8/12 front facing gables Stone Counts Garage 18 SF House Front 36 SF Total Stone 54 SF Concept Approval ONLY Subject to Field Inspection Inspector Date 2015 MN Bldg Code 03/29/2019shutchins SELECTED S S SS W H 4 6 4 0 R S 4640RS 4640RS 2 8 6 8 5-02668 2468 2868 2 6 6 8 1 6 6 8 2 8 6 8 UP SUMP A/C FD 16'1 1/2" M.O 8'1 1/2" M.O GARAGE STRAP (2)800 LBS GARAGE STRAP (2)800 LBS GARAGE STRAP (2)800 LBS 3'-6" EGRESS PIT DRAIN TILE SLEEVE 3'-6" EGRESS PIT DRAIN TILE SLEEVE 3 '-6 " E G R E S S P I T D R A I N T I L E S L E E V E BRICK LEDGE 2" BRICK LEDGE 2" BRICK LEDGE 2" S1 S-1 S1 S-1 S1 S-1 S1 S-1 S2 S-1 S2 S-1 S2 S-1 S2 S-1 4 '-0 " 8'-0" 49'-10" 16'-3"33'-7" 8'-10"7'-5"8'-10"24'-9" 5 2 '-0 " 2 '-0 " 2 1 '-4 " 1 2 '-4 " 3 '-6 " 1 2 '-1 0 " 1 4 '-0 " 5 2 '-0 " 3 0 '-8 " 3 '-0 " 4 '-4 " 11'-11" 49'-11" 8'-0"20'-0"10'-0" 10'-0"10'-0"5'-0"5'-0" 2 0 '-4 " 10'-7"19'-4" 4 '-4 " 29'-6 3/4" 24'-1 1/4" 1 5 '-1 1 /4 " 12'-9"6'-2 1/2"5'-4 1/2" 1 2 '-1 0 " 2 '-6 " 3 '-6 1 /4 " 3 '-8 " 33'-7"16'-3" 6 '-5 3 /4 " 3'-9"5'-10"3'-6"12'-5" 1 5 '-2 1 /4 " 8'-5 1/4" 5'-4"7'-0" 4 '-4 " 9'-3"7'-0"21'-3" 6 '-0 " 2 '-6 " 7 '-0 " 2 1 '-2 " 7 '-4 " 8'-8"29'-4" 2 2 '-4 " 1 5 '-5 3 /4 " 28'-8" X 22'-4" 5'-6" X 10'-8" 15'-7" X 12'-2" 18'-4" X 11'-10"5'-5" X 11'- 10" 32'-11" X 14'-6" GARAGE UTILITY FUTURE BEDROOM #4 FUTURE BATH STORAGE FUTURE FAMILY ROOM DROPPED BEAM Note: 2x4 Bearing wall Studs at 16" OC Treated Bottom Plate / Block Midpoint Anchor 6' OC NOTE: FOUNDATION IS UNDERSIZED TO ACCOMMODATE 2 3/8" INSULATION (HANG PLATES OVER 1/2" + 1/2" SHEATHING MAKES 1" OH) NOTE: WINDOW RO'S ARE GIVEN IN FEET, INCHES (WIDTH X HEIGHT) LOAD BEARING FTGS 16"X8" 8"X16" BEAM POCKET GARAGE STRAP (2)800 LBS INSET 1" TO ACCOMMODATE FOAM 4640RS 4640RS 4640RS 60682668 NOTE: UNFINISHED BASEMENTS USE AFL FLOOR SYSTEMS TO ACCOMMODATE R302.13 FIRE PROTECTION OF FLOOR SYSTEMS. FINISHED BASEMENTS USE I-JOIST FLOOR SYSTEMS. Basement Slab 4" Concrete 2500 PSI Over 6 Mil Vapor Barrier Gravel base 2500 PSI SUMP A/C FD S2 S-1 S2 S-1 1 5 '-1 1 /4 " 1 1 '-9 " 33'-7"16'-3" 8'-10"7'-5"8'-10"19'-7"5'-2" 16'-3"33'-7" 49'-10" FUTURE BEDROOM #4 FUTURE FAMILY ROOM DROPPED BEAM Note: 2x4 Bearing wall Studs at 16" OC Treated Bottom Plate / Block Midpoint Anchor 6' OC NOTE: FOUNDATION IS UNDERSIZED TO ACCOMMODATE 2 3/8" INSULATION (HANG PLATES OVER 1/2" + 1/2" SHEATHING MAKES 1" OH) NOTE: WINDOW RO'S ARE GIVEN IN FEET, INCHES (WIDTH X HEIGHT) LOAD BEARING FTGS 16"X8" 6068 4640RS 4640RS NOTE: UNFINISHED BASEMENTS USE AFL FLOOR SYSTEMS Basement Slab 4" Concrete 2500 PSI Over 6 Mil Vapor Barrier Gravel base 2500 PSI SUMP A/C FD S2 S-1 S2 S-1 1 5 '-1 1 /4 "1 1 '-9 " 33'-7"16'-3" 8'-10"7'-5"8'-10"19'-7"5'-2" 16'-3"33'-7" 49'-10" FUTURE BEDROOM #4 FUTURE FAMILY ROOM DROPPED BEAM Note: 2x4 Bearing wall Studs at 16" OC Treated Bottom Plate / Block Midpoint Anchor 6' OC LOAD BEARING FTGS 16"X8" T h e s e p l a n s a r e p r o p e r t y o f L o o m i s H o m e s L L C a n d m a y n o t b e r e p r o d u c e d o r u s e d w i t h o u t w r i t t e n c o n s e n t . FOUNDATION PLAN FOUNDATION LOOKOUT OPTION SHEET: 1/4"=1'-0" FOUNDATION WALKOUT OPTION DATE: FOUNDATION PLAN A-2 FOOTING NOTES: 1: ALL FOOTINGS TO REST ON CLEAN, FIRM UNDISTURBED SOIL. 2: CONCRETE STRENGTH 5,000 PSI. 3: PERIMETER FOOTING (20"x8") 4: LOAD BEARING FOOTING (16"x8") 5: DRAIN TILE PLACED ON INSIDE & OUTSIDE OF FOOTING. 1 8 9 2 5 I d e n W a y L a k e v i l l e , M N L o t 7 B l o c k 7 C h o k e C h e r r y H i l l s 2 n d FULL BASEMENT 3/7/2019 (2) 2x6 (2) 2x8 2 TRIMMERS EACH SIDE (3) 2x10 2 TRIMMERS EACH SIDE (2) 11 7/8" LVL (2) 2x6 (2) 2x6 4" Min. Bearing 4.5" Min. Bearing Smoke SINGLE LSL UNDER TRIMMERS ABOVE 4 4 4 TRUSS DETAILS 1.ALL TRUSSES SHALL CARRY MANUFACTURES STAMP. 2.ALL TRUSSES SHALL BE INSTALLED AND BRACED TO MANUFACTURES SPECIFICATIONS. 3.ALL TRUSSES WILL NOT BE FIELD ALTERED WITHOUT PRIOR BUILDING DEPT. APPROVAL IF ENGINEERING CALCULATIONS. 4.ALL TRUSSES SHALL HAVE DESIGN AND DRAWINGS ON SITE FOR FRAMING INSPECTION. 5.ALL ROOF FRAMING 24" O.C 6: OVERHANGS 18" STAIRWAY NOTES Every Stairway Shall have Headroom Clearance of Not Less Than 6' 8". Stair MAX Rise 7 3/4" & MIN Run of 10". Handgrip On Handrails SHALL Not be less than 1 1/4" or More Than 2". Guard Rail Height of 36" MIN & Less Than 4" Opening on Spindles and Stair Risers. Handrails Shall be at 34"-38" Above the nose of the tread and shall be continuous the full length of the stairs with each end returned to the wall. Interior stairways shall be provided with a light source at each landing. DN DW B 3 6 SB36 LCB36L B 2 4 R B 1 2 L S B 6 0 2 1 SB6021 B 1 5 D R B 3 6 SB36 LCB36L B 2 4 R B 1 2 L S B 6 0 2 1 SB6021 B 1 5 D R U182484L R E F . W A S H E R D R Y E R 6 0 " X 3 0 " T U B -S H O W E R U 1 8 2 1 8 4 R W 1 5 3 0 R W 3 9 1 2 W2430R W 3 0 1 2 DCW2430LW1230R W 1 2 3 0 R W 1 2 3 0 R 6068 2630SH 5040RS 5040RS 6 0 4 0 R S 2868 8070 16070 3068 4246FX 2468 2 6 6 8 2 4 6 84-0 2668 2668 4 -0 4 -0 2 6 6 8 2468 42" Half Wall Wood Cap 34X48 FBGLS SHOWER @ 2 4 " O .C . R O O F T R U S S E S 22x30 Attic Access S1 S-1 S1 S-1 S1 S-1 S1 S-1 S2 S-1 S2 S-1 S2 S-1 S2 S-1 2'-4" 6'-0" 5 '-0 " 4 '-0 " 24" 1 1 '-9 3 /4 " 1 8 '-8 1 /2 " 1 1 '-1 1 1 /2 " 50'-0" 6'-0"11'-4"2'-6"10'-8"19'-6" 5'-4"5'-4"4'-8"9'-7"5'-3" 5'-6"5'-10" 5 2 '-0 " 6 '-6 " 9 '-6 1 /2 " 1 8 '-0 " 5 2 '-0 " 3 0 '-8 " 3 '-4 " 12'-0"8'-0" 50'-0" 20'-0"10'-0" 10'-0"10'-0"5'-0"5'-0" 2 '-0 " 2 1 '-0 " 1 6 '-0 1 /2 " 1 2 '-1 1 1 /2 " 6 '-6 " 9 '-6 1 /2 " 13'-7 1/2"10'-10 1/2"9'-7 1/2"15'-10 1/2" 6 '-1 1 " 6 '-9 " 3 '-6 1 /4 " 5 '-0 "13'-7 1/2"16'-0 1/2" 2 '-1 1 1 /4 " 1 1 '-2 1 /2 " 2'-0"7'-6"2'-6" 6 " 3'-6" 15'-2" X 19'-0" 7'-6" X 11'-4" 29'-0" X 22'-6" 12'-11" X 15'-11" 5'-4" X 12'-3" 7'-11" X 3'-0" 11'-0" X 11'-1"10'-4" X 11'-1" 2 ' - 2 " X 5 ' - 7 " 4'-11" X 7'-7" 9'-6" X 11'-2" 9'-4" X 11'-2" 19'-0" X 3'-2" 2 '-2 " X 5 '-2 " GARAGE VINYL GREAT RM ENTRY BATH BEDROOM #3BEDROOM #2 C L O S E T VINYL KITCHEN DINING 1/2" TYPE X GYPBD. @ HOUSE /GARAGE COMMON WALLS (TYP) @ 24" O.C. GARAGE SLAB 4" CONCRETE SLAB 3500 PSI BASE ROOF TRUSSES CARPET VINYL VINYL VINYL CARPET CARPETCARPET 3 4 1 /2 " H a l f w a l l 1 0 " C o u n t e r t o p O v e r h a n g F r a m e w a l l a t 5 '2 " OPTIONAL VAULTED CEILING LINE MASTER BDRM HALL NOTE: FOUNDATION IS UNDERSIZED TO ACCOMMODATE 2 3/8" INSULATION (HANG PLATES OVER 1/2" + 1/2" SHEATHING MAKES 1" OH) NOTE: WINDOW RO'S ARE GIVEN IN FEET, INCHES (WIDTH X HEIGHT) @ 2 4 " O .C . R O O F T R U S S E S CARPET 2 2 x 3 0 A t t i c A c c e s s WIC C L O S E T CONCRETE PORCH T h e s e p l a n s a r e p r o p e r t y o f L o o m i s H o m e s L L C a n d m a y n o t b e r e p r o d u c e d o r u s e d w i t h o u t w r i t t e n c o n s e n t . CONSTRUCTION NOTES: 2x6 EXTERIOR FRAMING SPACED AT 16" O.C. 2x6 GARAGE FRAMING SPACED AT 16" O.C. 2x4 INTERIOR FRAMING SPACED AT 24" O.C. EXTERIOR WALL SHEATHING 1/2" OSB SHEATHING SUBFLOOR: 3/4" OSB EXTERIOR GRADE. ROOF SHEATHING: 15/32" OSB EXTERIOR GRADE. EXTERIOR MOISTURE PROTECTIVE BARRIER: STANDARD BUILDING WRAP MAINTENANCE FREE VINYL SIDING .040 THICKNESS. INSULATION NOTES: INSULATE ALL ACCESS DOORS/HATCHES TO ATTIC INSULATION SPECIFICATION: ATTIC R-49 FIBERGLASS BLOW-IN WALLS R-21 FIBERGLASS BATT'S FOUNDATION INSULATE ON EXTERIOR 2 3/8" ENEGY BOARD VENTILATION NOTES: ATTIC VENTILATION: AREA 1217 SQ FT. ATTIC VENTILATION EQUAL TO 1 SQ. FOOT PER 150 SQ. FEET OF ATTIC SPACE. VENTILATION SHALL BE PROTECTED FROM SNOW AND RAIN. PROVIDE 1" MIN. AIR GAP AT EAVES WITH INSULATION BAFFLES TYPE AT ALL TRUSS BAYS. PROVIDE ROOF VENTS ON BACKSIDE OF ROOFLINE ABOVE CONDITIONED AREA BLOW IN INSULATION R-49 INSULATE ALL ACCESS DOORS/HATCHES TO ATTIC ASPHALT ROOF WITH #15 TAR PAPER UNDERLAYMENT SHEET: DATE: A-3 1/4"=1' 1ST Floor 1 8 9 2 5 I d e n W a y L a k e v i l l e , M N L o t 7 B l o c k 7 C h o k e C h e r r y H i l l s 2 n d 3/7/2019 VAULTED (2) 11 7/8" LSL (2) 2x12 (2) 2x8 (3) 2x8 (2) 2x6 (3) 2x8 (2 ) 2 x 6 (3) 2x8 (2) 2x6 (2) 2x10 (2) 2x10 Smoke SmokeSmoke 60" CS-WSP 78" CS-WSP 60" CS-WSP 84" CS-WSP 78" CS-WSP 72" CS-WSP PFH PFH 1'-0"3'-8" VAULTED CEILING OPTION 4 MIL POLY VAPOR BARRIER APPLIED ON WARM IN WINTER SIDE OF THERMAL INSULATION AT ABOVE GRADE FRAMED WALLS FLOORS AND CEILINGS. 9 1/2" AFLS 16" OC. SEAL BEHIND POLY 1/2" GYPSUM SAG RESISTANT W/ VAPOR BARRIER 1/2" SHEATHING 1/2" GYPSUM 2x6 STUDS AT 16" OC #15 TAR PAPER ASPHALT SHINGLES SOFFIT FASCIA INSULATION CHUTE FINISH SIDING 15/32" SHEATHING R21 INSULATION MANUFACTURED TRUSSES 24" OC. INSTALLED PER MFG SPEC'S R49 INSULATION VENT 1/300TH OF ROOF AREA 50% TO 80% NEAR RIDGE REMAINDER IN SOFFIT PER IRC R806 POLYSTYRENE VENTILATION CHUTES PASSIVE SUB-SLAB DEPRESSURIZATION SYSTEM REQUIRED PER MINNESOTA RESIDENTIAL ENERGY CODE 1322.2100 TERMINATE 12" ABOVE ROOF NOTE: PROVIDE RECEPTACLE FOR FUTURE RADON FAN, VENT PIPE SHALL BE INSTALLED WITH A MINIMUM 24" CLEARANCE AND 36" VERTICAL CLEARANCE TO ALLOW FOR FUTURE INSTALLATION OF RADON FAN (ACTIVE SYSTEM) RIGID WINDWASH BARRIER MUST BE INSTALLED EXTENDING TO WITHIN 1" FROM BOTTOM OF ROOF SHEATHING BETWEEN ALL TRUSS SPACES MIN 6" ENERGY HEEL ROOF ASSEMBLY MAY REQUIRE RAFTER/TRUSS TIE DOWNS ICE AND WATER REQ. FROM THE EAVES TO A LINE 24" INSIDE THE EXTERIOR WALL LINE INTERIOR INSULATION UNLESS BLOWER DOOR TEST @ 2.6 AIR CHANGES P A S S I V E R A D O N V E N T WATCH DOG H3 WATER PROOF 3/4" SUBFLOOR 3" MIN POLYURETHANE FOAM AT RIM JOIST 2 3/8" ENERGY BOARD 3 1/2" CONC. SEAL ALL JOINTS @ SUMP AND OPENINGS 6 MIL POLY VAPOR BARRIER LAPPED SEAMS 12" BETWEEN 4" CLEAN AGGREGATE CAST-IN-PLACE ANCHOR BOLT 8" POURED CONC.WALL 20 X 8 CONCRETE FOOTING 5,000 PSI CONTINUOUS DRAIN TILE INTO SUMP PUMP. TREATED SILL PLATE W/ SILL SEAL SEAL BEHIND POLY 10' SECTION OF PERFORATED PIPE CONNECTED TO EACH SIDE OF A "T" FITTING IN AGGREGATE P A S S I V E R A D O N V E N T PASSIVE SUB-SLAB DEPRESSURIZATION SYSTEM REQUIRED PER MINNESOTA RESIDENTIAL ENERGY CODE 1322.2100 TERMINATE 12" ABOVE ROOF PASSIVE RADON VENT LABEL ON EACH FLR "RADON REDUCTION SYSTEM" ABOVE GRADE PROTECTION OF ENERGY BOARD EXTENDING 6" BELOW GRADE SEAL JOINT BETWEEN FOUNDATION WALL AND SLAB WITH APPROVED SEALANT 4 MIL POLY VAPOR BARRIER APPLIED ON WARM IN WINTER SIDE OF THERMAL INSULATION AT ABOVE GRADE FRAMED WALLS FLOORS AND CEILINGS. ROOF TRUSS CANT. ENTRYKITCHEN 9 1 /2 " GREAT ROOM 15 RISERS @ 7 1/8" 9 1/2" AFLS 16" OC. RAILINGS 36" MIN HGT. BAL. MAX 4" BTWN. MIN. 6'-8" HEADROOM AUNDRY DN 6 : 1 2 8 : 12 6 : 1 2 8 : 12 8 : 12 8 : 12 6 : 1 2 6 : 1 2 8 : 1 2 5 1/2 : 12 T h e s e p l a n s a r e p r o p e r t y o f L o o m i s H o m e s L L C a n d m a y n o t b e r e p r o d u c e d o r u s e d w i t h o u t w r i t t e n c o n s e n t . SHEET: ROOF PLAN 3/8"=1'-0" 3/8"=1'-0" DATE: S2 S-1 S1 1/4"=1'-0" 1 8 9 2 5 I d e n W a y L a k e v i l l e , M N L o t 7 B l o c k 7 C h o k e C h e r r y H i l l s 2 n d 3/7/2019 R-4 on pipe in attic ELECTRICAL NOTES: 1.ELECTRICAL RECEPTACLES IN BATHROOMS, KITCHENS AND GARAGES SHALL BE G.F.I. AS PER NATIONAL ELECTRICAL CODE REQUIREMENTS. 2.PROVIDE ONE SMOKE DETECTOR IN EACH ROOM AND ONE IN EACH CORRIDOR ACCESSING BEDROOMS. CONNECT SMOKE DETECTORS TO HOUSE POWER AND INTER-CONNECT SMOKE DETECTORS SO THAT, WHEN ANY ONE IS TRIPPED, THEY ALL WILL SOUND. PROVIDE BATTERY BACKUP FOR ALL UNITS. 3.CO2 DETECTOR IS REQUIRED PER STATE STATUTE 299F.50 4.LIGHT BULBS MUST BE AT LEAST 75% CFL THROUGH OUT THE HOUSE. DN DW R E F . 34X48 FBGLS SHOWER 3 DC 3 R CO/SD CO/SD CO/SD CO/SD RR R R RR R R GFCI 3 GFCI 3 3 3 16" 1'-9" GARAGE GREAT RM ENTRY BATH BEDROOM #3BEDROOM #2 C L O S E T KITCHEN DINING MASTER BDRM HALL WIC C L O S E T CONCRETE PORCH S S SS W H UP SUMP CO/SD CO/SD GARAGE UTILITY FUTURE BEDROOM #4 FUTURE BATH STORAGE FUTURE FAMILY ROOM T h e s e p l a n s a r e p r o p e r t y o f L o o m i s H o m e s L L C a n d m a y n o t b e r e p r o d u c e d o r u s e d w i t h o u t w r i t t e n c o n s e n t . SHEET: DATE: 1ST Floor ElectricalLower Level Electrical 1 8 9 2 5 I d e n W a y L a k e v i l l e , M N L o t 7 B l o c k 7 C h o k e C h e r r y H i l l s 2 n d 3/7/2019   6 33$4233 44<   $42$6 6 33$42332. $332  4 2 $#   $422 . . $.# 6 76 33$42.33 #$2 .23 3$242 .$#$4.#4.3 . 1 2$64#03. 2 1. 224. 1 3 3$.# 6 6 33$423302 2.1   4. 1# .$2 #4 4. 1. 2 $.# 6 ,6 334##  4. 1"#6 !#024 1 9" 7 8  54 %2 .)6 9+:;1<3&=#:>1,2! %:;?..2 =#: 1 )(:;*! %&6:1,2>.)#:? ;&#:&+:   %4 ! !%! %84! 8;, 8 8 !44 ;   <   <   0 <   <   <    <     <     <     <   <   0 <   <   <    <     <     <           42 6       >      =     <                     8            0                                              7    7         =                                  "     =          (  =     <            E       6 0 6            7 -      &  & &                                               8                                                  8                 8  7                          8                                                                                                               8            7                8  7                         8                   7                                       7                    =   8     7     =        8     =              =              =        7      =             =              =        =7      = 7   7  8    =        8     =        8      =             =         !  >      > <  <      ?  <      ?  0  !  >  0           >   =  > <  6  E             0          : > ;      E       6 0 6       <   0   0      <       <             0  !  > !  > !  > 0  0  0  7     "     =      - "        ( # /   )      %           , *  "      !      0          <                      @       00                      :         !        A                        ;                 !         B   0     :     =     ;       E       6 0 6          0    F      + + / 4   4 4 # $ $ 0 0    0  0    0  "#$#%&'($')#%)*%#)+,*- **./$*.#$ 0'(1.',(*+2#)#%)*134#1*)3$#1 5/+"*3+5)/++#(4*($#(+6    !2>$24.#4 4. 1 2 $ !"#6 6 !1412 4. 1 2 $ !"#6 6 . $24.#4 4. 1 2 $"#6 6 2>$24.#4332$. 1 "#2$. 1 3##47"#2>$24.#414 26 4## 2$. 1 ,7"#2>$24.#414 262>$24.#4#.$424#$2 $.0244.24$ 4 .3 . 14. $2  2 4220. <3. . 16--$. ? 26    . 3$233 2 ##4$ 2$#$$. . 3$.# 2 . . $.# $$. 4@A .24133#@. 334@  .2413$$* # $.# . 3$2# 2>$24.#479"2 21<#4     $$. 02 $.3$.# 42  BC $6 $$. 02 $.3$.# 2C3$# C6 ##$24 ,-C6 22$# $$.  2602 $.3$.# 3324#$2 $2  4# # 4. 6 4#0. 2 ". 6.41$202.$. 3$.#  32$<2$33$4<6 4#0. 24## 02 $#  ?. 2# 4## 3. 2#02 # .$.# 2 4 23#. . 3$.# 4@A . 3$233 2 ##4$ 2$#$$. 3$4## .$D ,$424 243<2 $     " E *    & * * ) +"(,-./ 012. 3' 4/35 /5(78 VA U L T E D NO D O O R FR A M E 2 - 8 SR O CS - W S P BR A C E D WA L L ME T H O D 13 ' 6 " RE Q U I R E D CS - W S P BR A C E D WA L L ME T H O D 12 ' 6 RE Q U I R E D CS - W S P BR A C E D WA L L 10 ' RE Q U I R E D PF H PO R T A L FR A M I N G PE R 60 2 . 1 0 . 6 . 2 ST H - 1 4 HO L D DO W N X 2 6' 6 c s - w s p 6' c s - w s p 5' c s -w s p5' c s - w s p 7' cs - w s p 6'6 cs - w s p LP LSL Label Qty Description Length BLK 1-3/4x9-1/2 LP-LSL 1.55E 8’-0" J1 3 1-3/4x9-1/2 LP-LSL 1.55E 34’-0" J2 8 1-3/4x9-1/2 LP-LSL 1.55E 32’-0" J3 15 1-3/4x9-1/2 LP-LSL 1.55E 30’-0" J4 8 1-3/4x9-1/2 LP-LSL 1.55E 16’-0" J5 3 1-3/4x9-1/2 LP-LSL 1.55E 12’-0" J6 3 1-3/4x9-1/2 LP-LSL 1.55E 8’-0" MF1 1 1-3/4x9-1/2 LP-LSL 1.55E 8’-0" LP LVL Label Qty Description Length MD1 2 1-3/4x11-7/8 LP-LVL 2900Fb-2.0E 14’-0" LP OSB Rim Label Qty Description Length RB 17 1-1/8x9-1/2 LP-OSB Rim 12’-0" Lo o m i s H o m e s 98 6 03 / 2 8 / 2 0 1 9 Ju s t i n S p r e i t z e r 1. FLOOR JOISTS TO BE 9-1/2" LP-1.55E LSL @ 19.2" O.C. TYP. UNLESS OTHERWISE NOTED. 2. ALL BLOCKING PER STRUCTURAL PLAN 3. LOADING TO BE 40 PSF LL - 10 PSF DL UNLESS OTHERWISE NOTED. Justin Spreitzer 2631 Territorial Road St. Paul, MN, 55114 612-282-0976 Re v i s e d : Dr a w n B y : Pr o j e c t # Da t e QUESTIONS? PLEASE CONTACT ME, 1. ALWAYS READ PRODUCT BROCHURE BEFORE INSTALLATION OF EWP PRODUCTS. 2. REFER TO HOLE CHARTS PRIOR TO DRILLING PRODUCT. 3. THIS DOCUMENT IS INTENDED SOLELY AS A PLACEMENT PLAN. IT IS TO BE REVIEWED BY THE ENGINEER OF RECORD AND MUST MEET HIS/HER APPROVAL PRIOR TO INSTALLATION OF OUR PRODUCT. 4. THIS DOCUMENT IS NOT TO BE USED AS A REPLACEMENT FOR YOUR ORIGINAL STRUCTURAL PLANS. 5. LAYOUT, QUANTITY AND LENGTH TO BE VERIFIED BY CONTRACTOR. Additional Notes General Notes Ma s t e r L a y o u t - P o p l a r I I - E l e v - A - C u s t o m Sawn Lumber Label Qty Description Length MD2 3 2x10 SPF_No.2 6’-0" MD3 2 2x8 SPF_No.2 6’-0" MD4 2 2x6 SPF_No.2 5’-0" MD5 4 2x6 SPF_No.2 4’-0" MF2 3 2x8 SPF_No.2 7’-0" MF3 4 2x8 SPF_No.2 6’-0" MF4 6 2x10 SPF_No.2 6’-0" MF5 2 2x6 SPF_No.2 5’-0" Use two 8d nails or two 10d box nails (one on each side) B4 JOIST NAILING AT INTERIOR SUPPORTA7SOLID RIM AS STARTER JOIST Provide blocking for lateral support as required. Use LP I-Joist, LP LVL, LP LSL, or LP Rim Board as blocking Fasten rim board to each floor I-Joist using one 8d nail or 10d box nail per flange 10d box nails at 6"o.c. toe-nailed from outside of building. RIM BOARDA1 Same depth as I-joist Fasten rim board to each floor I-Joist using one 8d nail or 10d box nail per flangeC1 APA-rated 23/32" OSB (or equal) closure, or as required by code AsDesi g n e d CANTILEVER REINFORCEMENT No reinforcement required LPI Blocking* * LPI SolidStart Rim Board, LVL or LSL may be substituted for the LP Blocking LOOKOUT OPTION WALKOUT OPTION 2 Trimmers 2 Trimmers A1 2 Trimmers A1 2 Trimmers J4 B4 J2 A1 A1 B4 A7 A7 A1 B4 2 Trimmers SINGLE LSL UNDER TRIMMERS ABOVE 2 Trimmers 2 Trimmers 2 Trimmers 2 Trimmers 2 Trimmers2 Trimmers 2 Trimmers B4 B4 J4 Start Framing Here 19.2" O.C. 4.5" Min Bearing 1’-2 7/16" 1’-0 3/16" 4" Min Bearing 11 13/16" A7 B4 J1 J2 J2 J2 J2 J2 J2 J2 J1 J1 J4 J5 J4 J5 J4 J5 J4 J6 J4 J6 J4 J6 J3 J3 J3 J3 J3 J3 J3 J3 J3 J3 J3 J3 J3 J3 J3 RB7 RB12 RB11 3 PLY 3 PLY 3 PLY 3 PLY 2 PLY 2 PLY 2 PLY 2 PLY 2 PLY 2 PLY 2 PLY RB8 RB5 RB5 RB1 RB3 RB6 RB10 RB9 RB4 RB2 B6 B4B2 B1 B1 B3 B5 B4 MD2MD3 (2)MD1 MD5MD5 MD4 MF3 MF4 MF3 MF4 MF5 MF1 MF2 C1 ***NOTE*** All Headers Up to 4'-11"=1 Trimmer All Headers Over 5'-0"=2 Trimmers Unless Noted Otherwise. Sawn Lumber Label Qty Description Length MF2 2 2x12 SPF_No.2 11’-0" MF3 2 2x6 SPF_No.2 9’-0" MF4 3 2x8 SPF_No.2 7’-0" MF5 2 2x6 SPF_No.2 7’-0" MF6 4 2x10 SPF_No.2 6’-0" MF7 6 2x8 SPF_No.2 5’-0" MF8 4 2x8 SPF_No.2 4’-0" MF9 2 2x6 SPF_No.2 3’-0" LP LSL Label Qty Description Length MF1 2 1-3/4x11-7/8 LP-LSL 1.55E 20’-0" Ma s t e r L a y o u t - P o p l a r I I - E l e v - A - C u s t o m Lo o m i s H o m e s 98 6 03 / 2 8 / 2 0 1 9 Ju s t i n S p r e i t z e r 1. FLOOR JOISTS TO BE 11-7/8" LPI20 PLUS @ 16" O.C. TYP. UNLESS OTHERWISE NOTED. 2. ALL BLOCKING PER STRUCTURAL PLAN 3. LOADING TO BE 40 PSF LL - 15 PSF DL UNLESS OTHERWISE NOTED. Justin Spreitzer 2631 Territorial Road St. Paul, MN, 55114 612-282-0976 Re v i s e d Dr a w n B y : Pr o j e c t # Da t e QUESTIONS? PLEASE CONTACT ME, 1. ALWAYS READ PRODUCT BROCHURE BEFORE INSTALLATION OF EWP PRODUCTS. 2. REFER TO HOLE CHARTS PRIOR TO DRILLING PRODUCT. 3. THIS DOCUMENT IS INTENDED SOLELY AS A PLACEMENT PLAN. IT IS TO BE REVIEWED BY THE ENGINEER OF RECORD AND MUST MEET HIS/HER APPROVAL PRIOR TO INSTALLATION OF OUR PRODUCT. 4. THIS DOCUMENT IS NOT TO BE USED AS A REPLACEMENT FOR YOUR ORIGINAL STRUCTURAL PLANS. 5. LAYOUT, QUANTITY AND LENGTH TO BE VERIFIED BY CONTRACTOR. Additional Notes General Notes 3 PLY 3 PLY 3 PLY 2 PLY 2 PLY 2 PLY 2 PLY 2 PLY 2 PLY 2 PLY 2 PLY MF7 MF9 MF8 MF8 MF7 MF6MF6 MF5 MF4 MF3 MF2 (2)MF1 ***NOTE*** All Headers Up to 4'-11"=1 Trimmer All Headers Over 5'-0"=2 Trimmers Unless Noted Otherwise. 6'6" 6'6" 1 SPF End Grain 2 SPF End Grain 4 1/2" 7 1/4 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #1 S-P-F #2 2.000" X 8.000" 3-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:3 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: Yes Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 958 1972 0 0 2 0 958 1972 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 4227 ft-lb 3'3"4562 ft-lb 0.927 (93%)D+S L 4227 ft-lb 3'3"4562 ft-lb 0.927 (93%)D+S L Shear 2216 lb 5'8 1/2"3377 lb 0.656 (66%)D+S L LL Defl inch 0.096 (L/765)3'3"0.306 (L/240)0.310 (31%)S L TL Defl inch 0.143 (L/515)3'3"0.408 (L/180)0.350 (35%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"51%958 / 1972 2929 L D+S 2 -SPF End Grain 3.000"51%958 / 1972 2929 L D+S Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 17-4-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 1 of 34 1 1 / 2 " 6'6" 6'6" 1 SPF End Grain 2 SPF End Grain 4 1/2" 7 1/4 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #1 S-P-F #2 2.000" X 8.000" 3-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Nail from both sides. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 2 of 34 2'9" 2'9" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #2 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 432 890 0 0 2 0 432 890 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 829 ft-lb 1'4 1/2"1649 ft-lb 0.503 (50%)D+S L 829 ft-lb 1'4 1/2"1649 ft-lb 0.503 (50%)D+S L Shear 822 lb 6 1/4"1708 lb 0.481 (48%)D+S L LL Defl inch 0.012 (L/2652)1'4 1/2"0.131 (L/240)0.090 (9%)S L TL Defl inch 0.018 (L/1785)1'4 1/2"0.175 (L/180)0.100 (10%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 1.500"69%432 / 890 1323 L D+S 2 -SPF End Grain 1.500"69%432 / 890 1323 L D+S Design Notes 1 Fasten all plies using 1 row of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 18-6-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 3 of 34 1 1 / 2 " 2'9" 2'9" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #2 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 1 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 78.7 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 4 of 34 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 3" 9 1/4" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #3 S-P-F #2 2.000" X 10.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 748 1540 0 0 2 0 748 1540 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 2732 ft-lb 2'9"3946 ft-lb 0.692 (69%)D+S L 2732 ft-lb 2'9"3946 ft-lb 0.692 (69%)D+S L Shear 1491 lb 11 1/2"2872 lb 0.519 (52%)D+S L LL Defl inch 0.031 (L/1960)2'9"0.256 (L/240)0.120 (12%)S L TL Defl inch 0.047 (L/1319)2'9"0.342 (L/180)0.140 (14%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"60%748 / 1540 2288 L D+S 2 -SPF End Grain 3.000"60%748 / 1540 2288 L D+S Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 16-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 5 of 34 1 1 / 2 " 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 3" 9 1/4" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #3 S-P-F #2 2.000" X 10.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 6 of 34 6'6" 6'6" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" 1 2 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #4 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 458 341 0 0 2 0 458 341 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 1154 ft-lb 3'3"1649 ft-lb 0.700 (70%)D+S L 1154 ft-lb 3'3"1649 ft-lb 0.700 (70%)D+S L Shear 641 lb 7 3/4"1708 lb 0.375 (38%)D+S L LL Defl inch 0.057 (L/1287)3'3"0.306 (L/240)0.190 (19%)S L TL Defl inch 0.134 (L/549)3'3"0.408 (L/180)0.330 (33%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"21%458 / 341 800 L D+S 2 -SPF End Grain 3.000"21%458 / 341 800 L D+S Design Notes 1 Fasten all plies using 1 row of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 3-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF 2 Uniform Top 90 PLF 0 PLF 0 PLF 0 PLF 0 PLF This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 7 of 34 1 1 / 2 " 6'6" 6'6" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #4 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 1 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 78.7 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 8 of 34 8'6" 8'6" 1 SPF End Grain 2 SPF End Grain 3" 11 1/4" 1 2 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #5 S-P-F #2 2.000" X 12.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 982 446 0 0 2 0 982 446 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 2773 ft-lb 4'3"5306 ft-lb 0.523 (52%)D+S L 2773 ft-lb 4'3"5306 ft-lb 0.523 (52%)D+S L Shear 1050 lb 1'1 1/2"3493 lb 0.301 (30%)D+S L LL Defl inch 0.021 (L/4719)4'3 1/16"0.271 (L/360)0.080 (8%)S L TL Defl inch 0.066 (L/1475)4'3 1/16"0.406 (L/240)0.160 (16%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"37%982 / 446 1428 L D+S 2 -SPF End Grain 3.000"37%982 / 446 1428 L D+S Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 3-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF 2 Uniform Top 180 PLF 0 PLF 0 PLF 0 PLF 0 PLF This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 9 of 34 1 1 / 2 " 8'6" 8'6" 1 SPF End Grain 2 SPF End Grain 3" 11 1/4" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #5 S-P-F #2 2.000" X 12.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 10 of 34 16'6" 16'6" 1 SPF End Grain 2 SPF End Grain 3 1/2" 11 7/8" 1 2 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #6 LP-LSL 1.55E 1.750" X 11.875" 2-Ply -PASSED LP SolidStart Design Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 2015 866 0 0 2 0 2015 866 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 11352 ft-lb 8'3"18628 ft-lb 0.609 (61%)D+S L Shear 2470 lb 1'2 1/8"13064 lb 0.189 (19%)D+S L LL Defl inch 0.223 (L/867)8'3 1/16"0.538 (L/360)0.420 (42%)S L TL Defl inch 0.742 (L/261)8'3 1/16"0.806 (L/240)0.920 (92%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"31%2015 / 866 2882 L D+S 2 -SPF End Grain 3.000"31%2015 / 866 2882 L D+S Design Notes 1 Provide restraint at supports to ensure lateral stability. 2 Dead Load Deflection: Instant = 0.519", Long Term = 0.779" 3 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 4 Refer to last page of calculations for fasteners required for specified loads. 5 Girders are designed to be supported on the bottom edge only. 6 Top loads must be supported equally by all plies. 7 Top must be continuously braced. 8 Bottom braced at bearings. 9 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 3-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF 2 Uniform Top 180 PLF 0 PLF 0 PLF 0 PLF 0 PLF Self Weight 13 PLF This design is valid until10/31/2020 Louisiana-Pacific Corp 414 Union Street, Suite 2000 Nashville, TN 37219 (888) 820-0325www.lpcorp.comAPA: PR-L280, ICC-ES: ESR-2403, LADBS: RR-25783, Florida: FL15228 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Notes This component analysis is based on the loads, geometry and other conditions as entered by the user and listed in this report. The user is responsible to ensure the accuracy of the input and the applicability to the actual conditions of the structure for which this component is intended. This analysis is valid only for the product listed. Copyright 2016 All rights reserved by Louisiana Pacific Corp. 414 Union St Suite 2000, Nashville, TN 37219 Page 11 of 34 1 1 / 2 " 16'6" 16'6" 1 SPF End Grain 2 SPF End Grain 3 1/2" 11 7/8" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #6 LP-LSL 1.55E 1.750" X 11.875" 2-Ply -PASSED LP SolidStart Design Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 197.8 PLF Yield Limit per Fastener 98.9 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until10/31/2020 Louisiana-Pacific Corp 414 Union Street, Suite 2000 Nashville, TN 37219 (888) 820-0325www.lpcorp.comAPA: PR-L280, ICC-ES: ESR-2403, LADBS: RR-25783, Florida: FL15228 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Notes This component analysis is based on the loads, geometry and other conditions as entered by the user and listed in this report. The user is responsible to ensure the accuracy of the input and the applicability to the actual conditions of the structure for which this component is intended. This analysis is valid only for the product listed. Copyright 2016 All rights reserved by Louisiana Pacific Corp. 414 Union St Suite 2000, Nashville, TN 37219 Page 12 of 34 3'3" 3'3" 1 SPF End Grain 2 SPF End Grain 3" 7 1/4" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #7 S-P-F #2 2.000" X 8.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 470 967 0 0 2 0 470 967 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 1079 ft-lb 1'7 1/2"2645 ft-lb 0.408 (41%)D+S L 1079 ft-lb 1'7 1/2"2645 ft-lb 0.408 (41%)D+S L Shear 847 lb 8"2251 lb 0.376 (38%)D+S L LL Defl inch 0.010 (L/3918)1'7 1/2"0.156 (L/240)0.060 (6%)S L TL Defl inch 0.014 (L/2637)1'7 1/2"0.208 (L/180)0.070 (7%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 1.500"75%470 / 967 1437 L D+S 2 -SPF End Grain 1.500"75%470 / 967 1437 L D+S Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 17-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 13 of 34 1 1 / 2 " 3'3" 3'3" 1 SPF End Grain 2 SPF End Grain 3" 7 1/4" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #7 S-P-F #2 2.000" X 8.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 14 of 34 4'3" 4'3" 1 SPF End Grain 2 SPF End Grain 4 1/2" 7 1/4 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #7A S-P-F #2 2.000" X 8.000" 3-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:3 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: Yes Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 668 1376 0 0 2 0 668 1376 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 2046 ft-lb 2'1 1/2"4562 ft-lb 0.449 (45%)D+S L 2046 ft-lb 2'1 1/2"4562 ft-lb 0.449 (45%)D+S L Shear 1403 lb 8"3377 lb 0.415 (42%)D+S L LL Defl inch 0.021 (L/2348)2'1 9/16"0.206 (L/240)0.100 (10%)S L TL Defl inch 0.031 (L/1580)2'1 9/16"0.275 (L/180)0.110 (11%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 1.500"71%668 / 1376 2044 L D+S 2 -SPF End Grain 1.500"71%668 / 1376 2044 L D+S Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 18-6-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 15 of 34 1 1 / 2 " 4'3" 4'3" 1 SPF End Grain 2 SPF End Grain 4 1/2" 7 1/4 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #7A S-P-F #2 2.000" X 8.000" 3-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Nail from both sides. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 16 of 34 8'3" 8'3" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #8 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 281 578 0 0 2 0 281 578 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 1612 ft-lb 4'1 1/2"1649 ft-lb 0.978 (98%)D+S L 1612 ft-lb 4'1 1/2"1631 ft-lb 0.989 (99%)D+S L Shear 724 lb 7 3/4"1708 lb 0.424 (42%)D+S L LL Defl inch 0.208 (L/454)4'1 9/16"0.394 (L/240)0.530 (53%)S L TL Defl inch 0.309 (L/306)4'1 9/16"0.525 (L/180)0.590 (59%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"22%281 / 578 858 L D+S 2 -SPF End Grain 3.000"22%281 / 578 858 L D+S Design Notes 1 Fasten all plies using 1 row of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be laterally braced at a maximum of 2' o.c. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 4-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 17 of 34 1 1 / 2 " 8'3" 8'3" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #8 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 1 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 78.7 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 18 of 34 7'6" 7'6" 1 SPF End Grain 2 SPF End Grain 4 1/2" 9 1/4" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #9 S-P-F #2 2.000" X 10.000" 3-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:3 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: Yes Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 1084 2231 0 0 2 0 1084 2231 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 5610 ft-lb 3'9"6807 ft-lb 0.824 (82%)D+S L 5610 ft-lb 3'9"6807 ft-lb 0.824 (82%)D+S L Shear 2468 lb 11 1/2"4308 lb 0.573 (57%)D+S L LL Defl inch 0.083 (L/1030)3'9 1/16"0.356 (L/240)0.230 (23%)S L TL Defl inch 0.123 (L/693)3'9 1/16"0.475 (L/180)0.260 (26%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"58%1084 / 2231 3315 L D+S 2 -SPF End Grain 3.000"58%1084 / 2231 3315 L D+S Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 17-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 19 of 34 1 1 / 2 " 7'6" 7'6" 1 SPF End Grain 2 SPF End Grain 4 1/2" 9 1/4" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: Main LevelBeam #9 S-P-F #2 2.000" X 10.000" 3-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Nail from both sides. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 20 of 34 5' 5' 1 SPF End Grain 2 SPF End Grain 4 1/2" 9 1/4" 1 2 43 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: BasementBeam #10 S-P-F #2 2.000" X 10.000" 3-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:3 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: Yes Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 1520 944 324 0 0 2 1520 1309 1076 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 4252 ft-lb 2'6"5919 ft-lb 0.718 (72%)D+L L 4252 ft-lb 2'6"5919 ft-lb 0.718 (72%)D+L L Shear 2123 lb 4' 1/2"3746 lb 0.567 (57%)D+L L LL Defl inch 0.021 (L/2683)2'6 9/16"0.154 (L/360)0.130 (13%)0.75(L+S)L TL Defl inch 0.035 (L/1606)2'6 9/16"0.231 (L/240)0.150 (15%)D+0.75(L+S)L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"43%944 / 1520 2464 L D+L 2 -SPF End Grain 3.000"57%1309 / 1947 3256 L D+0.75(L+S) Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 7-6-0 Top 10 PSF 40 PSF 0 PSF 0 PSF 0 PSF 2 Uniform Top 90 PLF 0 PLF 0 PLF 0 PLF 0 PLF 3 Point 2-6-0 Top 748 lb 1540 lb 0 lb 0 lb 0 lb 4 Part. Uniform 2-6-0 to 5-0-0 16-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 21 of 34 1 1 / 2 " 5' 5' 1 SPF End Grain 2 SPF End Grain 4 1/2" 9 1/4" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: BasementBeam #10 S-P-F #2 2.000" X 10.000" 3-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Nail from both sides. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 22 of 34 5' 5' 1 SPF End Grain 2 SPF End Grain 3" 7 1/4" 1 2 3 4 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: BasementBeam #11 S-P-F #2 2.000" X 8.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 2290 1161 0 0 0 2 2290 1161 0 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 1243 ft-lb 2'6"2300 ft-lb 0.541 (54%)D+L L 1243 ft-lb 2'6"2300 ft-lb 0.541 (54%)D+L L Shear 794 lb 9 1/2"1958 lb 0.406 (41%)D+L L LL Defl inch 0.023 (L/2397)2'6"0.154 (L/360)0.150 (15%)L L TL Defl inch 0.036 (L/1546)2'6"0.231 (L/240)0.160 (16%)D+L L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"90%1161 / 2290 3451 L D+L 2 -SPF End Grain 3.000"90%1161 / 2290 3451 L D+L Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 7-6-0 Top 10 PSF 40 PSF 0 PSF 0 PSF 0 PSF 2 Uniform Top 90 PLF 0 PLF 0 PLF 0 PLF 0 PLF 3 Point 0-0-0 Top 748 lb 1540 lb 0 lb 0 lb 0 lb 4 Point 5-0-0 Top 748 lb 1540 lb 0 lb 0 lb 0 lb This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 23 of 34 1 1 / 2 " 5' 5' 1 SPF End Grain 2 SPF End Grain 3" 7 1/4" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: BasementBeam #11 S-P-F #2 2.000" X 8.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 24 of 34 5' 5' 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" 1 2 3 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: BasementBeam #12 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 100 615 263 0 0 2 100 615 263 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 1054 ft-lb 2'6"1649 ft-lb 0.639 (64%)D+0.75(L+S)L 1054 ft-lb 2'6"1649 ft-lb 0.639 (64%)D+0.75(L+S)L Shear 702 lb 6 1/4"1708 lb 0.411 (41%)D+0.75(L+S)L LL Defl inch 0.024 (L/2465)2'6"0.162 (L/360)0.150 (15%)0.75(L+S)L TL Defl inch 0.077 (L/756)2'6"0.244 (L/240)0.320 (32%)D+0.75(L+S)L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 1.500"46%615 / 272 887 L D+0.75(L+S) 2 -SPF End Grain 1.500"46%615 / 272 887 L D+0.75(L+S) Design Notes 1 Fasten all plies using 1 row of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 1-0-0 Top 15 PSF 40 PSF 0 PSF 0 PSF 0 PSF 2 Uniform Top 180 PLF 0 PLF 0 PLF 0 PLF 0 PLF 3 Uniform 3-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 25 of 34 1 1 / 2 " 5' 5' 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: BasementBeam #12 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 1 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 78.7 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 26 of 34 12'5 1/2" 12'5 1/2" 1 SPF End Grain 2 SPF End Grain 3 1/2" 11 7/8" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: BasementBeam #13 LP-LVL 2900Fb-2.0E 1.750" X 11.875" 2-Ply -PASSED LP SolidStart Design Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 4395 1173 0 0 0 2 4395 1173 0 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 16315 ft-lb 6'2 3/4"19902 ft-lb 0.820 (82%)D+L L Shear 4516 lb 1'2 1/8"7897 lb 0.572 (57%)D+L L LL Defl inch 0.382 (L/379)6'2 3/4"0.403 (L/360)0.950 (95%)L L TL Defl inch 0.484 (L/299)6'2 3/4"0.604 (L/240)0.800 (80%)D+L L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"71%1173 / 4395 5568 L D+L 2 -SPF End Grain 3.000"71%1173 / 4395 5568 L D+L Design Notes 1 Provide restraint at supports to ensure lateral stability. 2 Dead Load Deflection: Instant = 0.102", Long Term = 0.153" 3 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 4 Refer to last page of calculations for fasteners required for specified loads. 5 Girders are designed to be supported on the bottom edge only. 6 Top loads must be supported equally by all plies. 7 Top must be laterally braced at a maximum of 2' o.c. 8 Bottom braced at bearings. 9 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 17-7-11 Top 10 PSF 40 PSF 0 PSF 0 PSF 0 PSF Self Weight 12 PLF This design is valid until10/31/2020 Louisiana-Pacific Corp 414 Union Street, Suite 2000 Nashville, TN 37219 (888) 820-0325www.lpcorp.comAPA: PR-L280, ICC-ES: ESR-2403, LADBS: RR-25783, Florida: FL15228 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Notes This component analysis is based on the loads, geometry and other conditions as entered by the user and listed in this report. The user is responsible to ensure the accuracy of the input and the applicability to the actual conditions of the structure for which this component is intended. This analysis is valid only for the product listed. Copyright 2016 All rights reserved by Louisiana Pacific Corp. 414 Union St Suite 2000, Nashville, TN 37219 Page 27 of 34 1 1 / 2 " 12'5 1/2" 12'5 1/2" 1 SPF End Grain 2 SPF End Grain 3 1/2" 11 7/8" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: BasementBeam #13 LP-LVL 2900Fb-2.0E 1.750" X 11.875" 2-Ply -PASSED LP SolidStart Design Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 181.1 PLF Yield Limit per Fastener 90.5 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until10/31/2020 Louisiana-Pacific Corp 414 Union Street, Suite 2000 Nashville, TN 37219 (888) 820-0325www.lpcorp.comAPA: PR-L280, ICC-ES: ESR-2403, LADBS: RR-25783, Florida: FL15228 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Notes This component analysis is based on the loads, geometry and other conditions as entered by the user and listed in this report. The user is responsible to ensure the accuracy of the input and the applicability to the actual conditions of the structure for which this component is intended. This analysis is valid only for the product listed. Copyright 2016 All rights reserved by Louisiana Pacific Corp. 414 Union St Suite 2000, Nashville, TN 37219 Page 28 of 34 3' 3' 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: BasementBeam #14 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 1058 265 0 0 0 2 1058 265 0 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 911 ft-lb 1'6"1434 ft-lb 0.636 (64%)D+L L 911 ft-lb 1'6"1434 ft-lb 0.636 (64%)D+L L Shear 864 lb 2'5 3/4"1485 lb 0.582 (58%)D+L L LL Defl inch 0.019 (L/1852)1'6"0.096 (L/360)0.190 (19%)L L TL Defl inch 0.023 (L/1482)1'6"0.144 (L/240)0.160 (16%)D+L L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 1.500"69%265 / 1058 1323 L D+L 2 -SPF End Grain 1.500"69%265 / 1058 1323 L D+L Design Notes 1 Fasten all plies using 1 row of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 17-7-11 Top 10 PSF 40 PSF 0 PSF 0 PSF 0 PSF This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 29 of 34 1 1 / 2 " 3' 3' 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: BasementBeam #14 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 1 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 78.7 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 30 of 34 4'9" 4'9" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" 1 2 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: BasementBeam #15 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 713 392 0 0 0 2 713 392 0 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 1243 ft-lb 2'4 1/2"1434 ft-lb 0.867 (87%)D+L L 1243 ft-lb 2'4 1/2"1434 ft-lb 0.867 (87%)D+L L Shear 862 lb 4'2 3/4"1485 lb 0.581 (58%)D+L L LL Defl inch 0.053 (L/1046)2'4 1/2"0.154 (L/360)0.340 (34%)L L TL Defl inch 0.082 (L/675)2'4 1/2"0.231 (L/240)0.360 (36%)D+L L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 1.500"58%392 / 713 1104 L D+L 2 -SPF End Grain 1.500"58%392 / 713 1104 L D+L Design Notes 1 Fasten all plies using 1 row of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 7-6-0 Top 10 PSF 40 PSF 0 PSF 0 PSF 0 PSF 2 Uniform Top 90 PLF 0 PLF 0 PLF 0 PLF 0 PLF This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 31 of 34 1 1 / 2 " 4'9" 4'9" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: BasementBeam #15 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 1 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 78.7 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 32 of 34 6'6" 6'6" 1 SPF End Grain 2 SPF End Grain 4 1/2" 7 1/4 1 2 3 4 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: BasementBeam #16 S-P-F #2 2.000" X 8.000" 3-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Member Information Type:Girder Plies:3 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: Yes Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 2909 1475 0 0 0 2 2909 1475 0 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 2181 ft-lb 3'3"3967 ft-lb 0.550 (55%)D+L L 2181 ft-lb 3'3"3967 ft-lb 0.550 (55%)D+L L Shear 1143 lb 9 1/2"2936 lb 0.389 (39%)D+L L LL Defl inch 0.047 (L/1548)3'3"0.204 (L/360)0.230 (23%)L L TL Defl inch 0.074 (L/999)3'3"0.306 (L/240)0.240 (24%)D+L L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"76%1475 / 2909 4384 L D+L 2 -SPF End Grain 3.000"76%1475 / 2909 4384 L D+L Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 7-6-0 Top 10 PSF 40 PSF 0 PSF 0 PSF 0 PSF 2 Uniform Top 90 PLF 0 PLF 0 PLF 0 PLF 0 PLF 3 Point 0-0-0 Top 939 lb 1934 lb 0 lb 0 lb 0 lb 4 Point 6-6-0 Top 939 lb 1934 lb 0 lb 0 lb 0 lb This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 33 of 34 1 1 / 2 " 6'6" 6'6" 1 SPF End Grain 2 SPF End Grain 4 1/2" 7 1/4 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address: Date:7/25/2018 Designer:Justin Spreitzer Job Name:The Poplar II-Elevation A Project #:Master Beam Pack Level: BasementBeam #16 S-P-F #2 2.000" X 8.000" 3-Ply -PASSED Version 3.1.04 (Build 18.11.115) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Nail from both sides. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until 10/30/2020 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 34 of 34 18925 Iden Way Loomis Homes (952)200-8838 2695 404.25 404.25 72 207 207 (197.25) =(.02 x 2965) + 60 = 119.30 119.30 59.65 Builders Associaton of Minnesota version 101014 New Construction Energy Code Compliance Certificate Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Date Certificate Posted Mailing Address of the Dwelling or Dwelling Unit City 18925 Iden Way Lakeville Name of Residential Contractor MN License Number Loomis Homes LLC BC653240 THERMAL ENVELOPE RADON CONTROL SYSTEM Insulation Location To t a l R - V a l u e o f a l l T y p e s o f In s u l a t i o n Type: Check All That Apply X Passive (No Fan) No n o r N o t A p p l i c a b l e Fi b e r g l a s s , B l o w n Fi b e r g l a s s , B a t t s Fo a m , C l o s e d C e l l Fo a m O p e n C e l l Min e r a l F i b e r b o a r d Rig i d , E x t r u d e d P o l y s t y r e n e Rig i d , I s o c y n u r a t e Active (With fan and monometer or other system monitoring device) Location (or future location) of Fan: Other Please Describe Here Below Entire Slab Foundation Wall R10 X 2" Foam Board Perimeter of Slab on Grade Rim Joist (1st Floor) Rim Joist (2nd Floor+)R20 X Spray Urethane Wall R20 X Ceiling, flat R49 X Ceiling, vaulted R49 X X Bay Windows or cantilevered areas Floors over unconditioned area Describe other insulated areas Building envelope air tightness:Duct system air tightness: Windows & Doors Heating or Cooling Ducts Outside Conditioned Spaces Average U-Factor (excludes skylights and one door) U: 0.28 X Not applicable, all ducts located in conditioned space Solar Heat Gain Coefficient (SHGC):0.22 R-value MECHANICAL SYSTEMS Make-up Air Select a Type Appliances Heating System Domestic WaterHeater Cooling System X Not required per mech. code Fuel Type Natural Gas Electric Passive Manufacturer Payne Bradford Payne Powered Model PG9MABO06036 RE35056 PA013NRO24 Interlocked with exhaust device.Describe: Rating or Size Input in BTUS:60,000 Capacity inGallons:50 Output in Tons:2 Other, describe: Efficiency AFUE orHSPF%95.5 SEER /EER 13 Location of duct or system: Residential Load Calculation Heating Loss Heating Gain Cooling Load Cfm's " round duct OR MECHANICAL VENTILATION SYSTEM " metal duct Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): Combustion Air Select a TypeXNot required per mech. code Select Type Passive Heat Recover Ventilator (HRV) Capacity in cfms:Low: High:Other, describe: X Energy Recover Ventilator (ERV) Capacity in cfms:Low: 120 High:120 Location of duct or system: Balanced Ventilation capacity in cfms: Location of fan(s), describe: Cfm's Capacity continuous ventilation rate in cfms: " round duct OR Total ventilation (intermittent + continuous) rate in cfms: " metal duct 03/20/19 X KP