HomeMy WebLinkAbout19532 Hibbing Way-SURVEY (1)EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONThe curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.
*Maintain 6" between siding & sod
*No structures in easements
ENGINEERING REVIEWED
Date: 03/28/2019___rmcdonald
Zoning = RS-3
FY - 30'SY - 10' Interior, 20' CornerRY - 30'
SY Buffer - 30'RY Buffer - 50'