HomeMy WebLinkAboutLA167602 7863 205th St Permit Pack3/20/2019
SH
12,610.94
RESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT DECK FOOTING
CONDO FIREPLACE
ACESSORY BUILDING FOOTING
REROOF FOUNDATION
RESIDE FRAMING
PORCH FRAMING
GARAGES
INSULATION
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES LATH
LOWER LEVEL FINISH LOWER LEVEL FINAL
ADDITION OTHER
FOUNDATION ONLY PORCH FOOTING
MISCELLANEOUS POURED WALL
DEMO SEPTIC TANK REMOVAL
MOVED SITE
MECHANICAL
CITY BUILDING VALUATION: $AIR TEST
FINAL
BUILDING PERMIT FEES ROUGH-IN
$PERMIT FEE PLUMBING
$PLAN CHECK FINAL
$SURCHARGE ROUGH-IN
$METRO SAC METER SIZE
$CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE
$CITY SEWER HOOKUP UNIT SEWER/WATER
$LANDSCAPE ESCROW SEWER/WATER
$TREE ESCROW FINAL
$MISC ESCROW STREET DRAINTILE
$PLUMBING BUILDING INFORMATION
$MECHANICAL TYPE OF CONSTRUCTION
$SEWER WATER ZONING
$OTHER CODE EDITION
$TOTAL FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
3/28/19 X
KP
COVER SHEET2015 MN Residential Code2015 MN Plumbing Code
2015 MN Fire Code2014 National Electrical Code2015 MN Energy Code2015 MN Fuel Gas Code2015 MN Mechanical Code
7863 205th STreet W
Concept Approval
ONLY
Subject to Field Inspection
Inspector Date
2015
MN Bldg
Code
04/01/2019shutchins
NOTES - SCHEDULES AND LEGENDS
GENERAL NOTES
FOUNDATION - BASEMENTBASEMENT FOUNDATION PLAN
1ST FLOOR PLAN1ST FLOOR PLAN
2ND FLOOR PLAN2ND FLOOR PLAN
BUILDING SECTION
BUILDING SECTION
FRONT ELEVATION
LEFT ELEVATION
RIGHT ELEVATION
REAR ELEVATIONSecure door closed until deck is
constructed with a separate permit.
ROOF PLANROOF PLAN
copyright : MULHERN & KULPStructural Engineering, Inc.c02-12-14
JGF
JE
125-13026
Newberry ModelCentral Zone - MN
STRUCTURAL PLAN - 1ST FLOOR (MN CODE)
STRUCTURAL PLAN - 2ND FLOOR (MN CODE)
STRUCTURAL PLAN - FOUNDATION BASEMENT (MN CODE)(2)7-1/4 LVL(2) Jack StudsEach End
copyright : MULHERN & KULPStructural Engineering, Inc.c02-12-14
JGF
JE
125-13026
Newberry ModelCentral Zone - MN
copyright : MULHERN & KULPStructural Engineering, Inc.c02-12-14
JGF
JE
125-13026
Newberry ModelCentral Zone - MN
P:\Client Files\125 - Pulte Central Zone\Master Client admin\Master Details\Central Zone Master Fnd Detail Files\MN Central Zone - Master Foundation Details - I-Jst.dwg, 4/28/2017 8:35:21 AM, Andrew Moore,Mulhern & Kulp, DWF6 ePlot.pc3
AD
42SB.1WS-01 SC. 1-1/2" = 1'-0"
SIDING AND TRIM PER ELEVATION
TYPICAL 2 STORY WALL SECTION w/ BASEMENT WS-02 SC. 1-1/2" = 1'-0"
BRICK VENEER AND TRIM PER ELEVATION
TYPICAL 2 STORY WALL SECTION w/ BASEMENT
DS-01 SC. 1-1/2" = 1'-0" - VINYL SIDING - IN-GRADE BASEMENT
FOUNDATION INSULATION DETAIL DS-01a SC. 1-1/2" = 1'-0" - ENG. SIDING - IN-GRADE BASEMENT
FOUNDATION INSULATION DETAIL
DS-02 SC. 1-1/2" = 1'-0" - VINYL SIDING - DAYLIGHT/WALKOUT
FOUNDATION INSULATION DETAIL DS-02a SC. 1-1/2" = 1'-0" - ENG. SIDING - DAYLIGHT/WALKOUT
FOUNDATION INSULATION DETAIL
AD
41SB.1WS-01 SC. 1-1/2" = 1'-0"
SIDING AND TRIM PER ELEVATION
TYPICAL 1 STORY WALL SECTION w/ BASEMENT WS-02 SC. 1-1/2" = 1'-0"
BRICK VENEER AND TRIM PER ELEVATION
TYPICAL 1 STORY WALL SECTION w/ BASEMENT
DS-01 SC. 1-1/2" = 1'-0" - VINYL SIDING - IN-GRADE BASEMENT
FOUNDATION INSULATION DETAIL DS-01a SC. 1-1/2" = 1'-0" - ENG. SIDING - IN-GRADE BASEMENT
FOUNDATION INSULATION DETAIL
DS-02 SC. 1-1/2" = 1'-0" - VINYL SIDING - DAYLIGHT/WALKOUT
FOUNDATION INSULATION DETAIL DS-02a SC. 1-1/2" = 1'-0" - ENG. SIDING - DAYLIGHT/WALKOUT
FOUNDATION INSULATION DETAIL