Loading...
HomeMy WebLinkAbout16214 Dutch Barn Dr Survey1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 7/23/18.7.Plan No. SBF19.12.03-THE 2500-ELEVATION ANOTESLot= 11,918 sq. ft.House/Garage= 1,880 sq. ft.Porch= 140 sq. ft.Driveway= 771 sq. ft.Total Impervious= 2,791 sq. ft. or 23.4 % of lotHARD COVER CALCULATIONSProposedGarage Floor @ Front= 939.8Garage Top of Block= 940.5House Top of Block= 940.5Lowest Floor= 932.5Lot 12, Block 3, SPIRIT OF BRANDTJEN FARM 19TH ADDITION, Dakota County,MinnesotaPROPERTY DESCRIPTION16214 Dutch Barn Drive, Lakeville, MinnesotaPROPERTY ADDRESSI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 25th day of March, 2019Marcus F. Hampton, MN L.S. No. 47481SURVEYOR'S CERTIFICATEFLOOR ELEVATIONSTop nut of hydrant located at Lot 12, Block 3 = 941.27BENCHMARKDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationJames R. Hill, Inc. 2500 WEST C.R. 42, SUITE 120, BURNSVILLE, MN 55337 PHONE: 952.890.6044 www.jrhinc.com PLANNERS / ENGINEERS / SURVEYORS CERTIFICATE OF SURVEY FOR ROBERT THOMAS HOMESDRAWN BYDATEREVISIONS3/25/2019CAD FILEPROJECT NO.SHEET 1 OF 1390261.dwg390261Lot 12, Block 3, SPIRIT OF BRANDTJEN FARM 19TH ADDITION, Dakota County, MinnesotaJCBThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONENGINEERING REVIEWEDDate:__________________03/29/2019ibradshaw*Maintain 6" between bottom of siding and sod.*No structures in easements.Planning DepartmentApprovedDate:__________________04/05/2019dmorey