HomeMy WebLinkAbout18184 Greyhaven Path SurveyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________03/29/2019ibradshaw*Maintain 6" between bottom of siding and sod.*No structures in easements.Planning DepartmentApprovedDate:__________________04/05/2019dmorey