Loading...
HomeMy WebLinkAbout18130 Goldfinch Way SurveyEROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. *Maintain 6" between siding & sod *No structures in easements ENGINEERING REVIEWED Date: 03/14/2019___rmcdonald Planning DepartmentApprovedDate:__________________03/19/2019 dmorey