HomeMy WebLinkAbout18130 Goldfinch Way SurveyEROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.
*Maintain 6" between siding & sod
*No structures in easements
ENGINEERING REVIEWED
Date: 03/14/2019___rmcdonald
Planning DepartmentApprovedDate:__________________03/19/2019 dmorey