Loading...
HomeMy WebLinkAbout7798 182nd St W SurveyEROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted before As-built escrow monies will be released. All structures must be flush with the sod. This will be scheduled with the landscape inspection. *Maintain 6" between siding & sod *No structures in easements ENGINEERING REVIEWED Date: 04/01/2019___rmcdonald Planning DepartmentApprovedDate:__________________04/05/2019 dmorey