Loading...
HomeMy WebLinkAbout19900 Henley Lane SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. ENGINEERING REVIEWED Date:__________________04/30/2019 corlowsky EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION