Loading...
HomeMy WebLinkAbout19885 Henley Lane SurveyZoning = RS-3 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Draintile connection required. *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________04/26/2019 corlowsky