HomeMy WebLinkAbout19885 Henley Lane SurveyZoning = RS-3
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
*Draintile connection required.
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
ENGINEERING REVIEWED
Date:__________________04/26/2019 corlowsky