HomeMy WebLinkAboutLA168480 - 20044 Heath Ave Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: MAIN FLOOR 1037.3 UPPER PLATE 1056.2 T.O. FOUNDATION 1035.6 MAIN PLATE 1046.4 MA I N P L A T E 10 4 6 . 4 UPPER FLOOR 1048.1 MAIN FLOOR PLATE HEIGHT 9' - 1 1/8" UPPER FLOOR PLATE HEIGHT 8' - 1 1/8" 12 8 G A R A G E P L A T E H E I G H T 1 2 ' - 2 3 / 1 6 " VI N Y L B O A R D & B A T T E N T Y P . VI N Y L S H A K E S T Y P . 6" S M A R T S I D E FR I E Z E B O A R D TY P . @ F R O N T VI N Y L L A P SI D I N G T Y P . 3 ' - 6 " CU L T U R E D S T O N E W/ C O N C R E T E C A P AL U M I N U M S O F F I T & F A S C I A T Y P . 6" S M A R T S I D E TR I M @ F R O N T TY P . SE E D E T A I L 7: 1 2 7: 1 2 7: 1 2 T. O . G A R A G E FO U N D A T I O N 10 3 4 . 2 RA I L I N G PE R C O D E AD D R E S S S T O N E 8x 8 x 3 6 " CO R B E L S ( 2 ) T H E I D E A S , D E S I G N S , D R A W I N G S A N D S P E C I F I C A T I O N S R E P R E S E N T E D H E R E I N A R E A N D S H A L L R E M A I N T H E E X C L U S I V E C O P Y R I G H T P R O P E R T Y O F O N E T E N T E N H O M E S . N O P A R T T H E R E O F S H A L L B E U S E D , C O P I E D , O R D I S C L O S E D I N C O N N E C T I O N W I T H A N Y W O R K O R P R O J E C T O T H E R T H A N T H E S P E C I F I E D P R O J E C T F O R W H I C H T H E Y H A V E B E E N P R E P A R E D W I T H O U T T H E W R I T T E N C O N S E N T O F O N E T E N T E N H O M E S . T H E P L A N S F U R N I S H E D H E R E I N W E R E P R E P A R E D U P O N R E Q U E S T B Y D R A F T S P E R S O N S W H O A R E N O T R E G I S T E R E D A R C H I T E C T S O R E N G I N E E R S . O N E T E N T E N H O M E S A S S U M E S N O R E S P O N S I B I L I T Y F O R S T R U C T U R A L O R D I M E N S I O N A L E R R O R S O R O M I S S I O N S . T H E C O N T R A C T O R A N D / O R O W N E R M U S T V E R I F Y A N D C H E C K A L L N O T E S D E T A I L S , E L E V A T I O N S , S E C T I O N S A N D F L O O R P L A N S A N D N O T I F Y O N E T E N T E N H O M E S O F A N Y E R R O R S O R O M I S S I O N S P R I O R T O T H E S T A R T O F C O N S T R U C T I O N . N O W A R R A N T I E S A R E E X P R E S S E D O R I M P L I E D I N C L U D I N G C O M P L I A N C E O F T H I S P L A N W I T H A P P L I C A B L E B U I L D I N G C O D E R E Q U I R E M E N T S . T H E S E L E C T I O N A N D A P P L I C A T I O N O F C O R R E C T S T R U C T U R A L M A T E R I A L S I S T H E R E S P O N S I B I L I T Y O F T H E B U I L D E R , T H E O W N E R O R T H E U S E R O F T H E S E P L A N S . DATE SQUARE FEET PROJECT SHEET OF UPPER: MAIN: BONUS: TOTAL: LOWER: RELEASED REV. 1 REV. 2 REV. 3 REV. 4 REV. 5 PLATE HEIGHTS UPPER: MAIN: POUR: P.O. BOX 391 5411 LAKERS LANE, SUITE 204 NISSWA, MN 56468 PH (612) 327-7582 NORTHHOUSE-RD.COM BRAINERD LAKES TWIN CITIES 3000 COUNTY ROAD 42 WEST, SUITE 202 BURNSVILLE, MN 55337 PH (952)-953-4000 ONETENTENHOMES.COM UN S P E C I F I E D H E A D E R S T O B E 2 -2x 1 0 W / 2 T R I M M E R S 10 " M I N . S T A I R T R E A D D E P T H & 7 3 / 4 " M A X S T A I R R I S E R H E I G H T AL L A N G L E S A R E 4 5 D E G R E E S U N L E S S N O T E D O T H E R W I S E AL L E X T E R I O R D I M E N S I O N S A R E T O O U T S I D E O F S H E A T H I N G , CONCRETE OR FOUNDATION INSULATION 4/19/2019 12:55:27 PM SPEC HOME L33, B2 - BERRES RIDGE 1st ADD'N 20044 HEATH AVENUE - LAKEVILLE, MN 55044 1OTT023 84.2.19 ES 1699 1277 852 3828 4.18.19 ES 4.19.19 CB 3.22.19 CB 8'- 1 /18" 9'- 1 /18" 8'-4" THE MAVERICK 1/ 4 " = 1 ' -0" 11 FR O N T E L E V A T I O N Concept Approval ONLY Subject to Field Inspection In s p e c t o r Date2015MN Bldg Code 05/02/2019 dmathews 24 " R E T U R N S T Y P . 7:12 8:12 8: 1 2 8: 1 2 12 7 8: 1 2 8: 1 2 12 7 12 7 24 " R E T U R N S T Y P . AL U M I N U M S O F F I T & F A S C I A T Y P . VI N Y L S I D I N G & CO R N E R S @ SI D E S & R E A R 4" S M A R T S I D E T R I M @ S I D E S & R E A R 12 8 7: 1 2 12 8 T H E I D E A S , D E S I G N S , D R A W I N G S A N D S P E C I F I C A T I O N S R E P R E S E N T E D H E R E I N A R E A N D S H A L L R E M A I N T H E E X C L U S I V E C O P Y R I G H T P R O P E R T Y O F O N E T E N T E N H O M E S . N O P A R T T H E R E O F S H A L L B E U S E D , C O P I E D , O R D I S C L O S E D I N C O N N E C T I O N W I T H A N Y W O R K O R P R O J E C T O T H E R T H A N T H E S P E C I F I E D P R O J E C T F O R W H I C H T H E Y H A V E B E E N P R E P A R E D W I T H O U T T H E W R I T T E N C O N S E N T O F O N E T E N T E N H O M E S . T H E P L A N S F U R N I S H E D H E R E I N W E R E P R E P A R E D U P O N R E Q U E S T B Y D R A F T S P E R S O N S W H O A R E N O T R E G I S T E R E D A R C H I T E C T S O R E N G I N E E R S . O N E T E N T E N H O M E S A S S U M E S N O R E S P O N S I B I L I T Y F O R S T R U C T U R A L O R D I M E N S I O N A L E R R O R S O R O M I S S I O N S . T H E C O N T R A C T O R A N D / O R O W N E R M U S T V E R I F Y A N D C H E C K A L L N O T E S D E T A I L S , E L E V A T I O N S , S E C T I O N S A N D F L O O R P L A N S A N D N O T I F Y O N E T E N T E N H O M E S O F A N Y E R R O R S O R O M I S S I O N S P R I O R T O T H E S T A R T O F C O N S T R U C T I O N . N O W A R R A N T I E S A R E E X P R E S S E D O R I M P L I E D I N C L U D I N G C O M P L I A N C E O F T H I S P L A N W I T H A P P L I C A B L E B U I L D I N G C O D E R E Q U I R E M E N T S . T H E S E L E C T I O N A N D A P P L I C A T I O N O F C O R R E C T S T R U C T U R A L M A T E R I A L S I S T H E R E S P O N S I B I L I T Y O F T H E B U I L D E R , T H E O W N E R O R T H E U S E R O F T H E S E P L A N S . DATE SQUARE FEET PROJECT SHEET OF UPPER: MAIN: BONUS: TOTAL: LOWER: RELEASED REV. 1 REV. 2 REV. 3 REV. 4 REV. 5 PLATE HEIGHTS UPPER: MAIN: POUR: P.O. BOX 391 5411 LAKERS LANE, SUITE 204 NISSWA, MN 56468 PH (612) 327-7582 NORTHHOUSE-RD.COM BRAINERD LAKES TWIN CITIES 3000 COUNTY ROAD 42 WEST, SUITE 202 BURNSVILLE, MN 55337 PH (952)-953-4000 ONETENTENHOMES.COM UN S P E C I F I E D H E A D E R S T O B E 2 -2x 1 0 W / 2 T R I M M E R S 10 " M I N . S T A I R T R E A D D E P T H & 7 3 / 4 " M A X S T A I R R I S E R H E I G H T AL L A N G L E S A R E 4 5 D E G R E E S U N L E S S N O T E D O T H E R W I S E AL L E X T E R I O R D I M E N S I O N S A R E T O O U T S I D E O F S H E A T H I N G , CONCRETE OR FOUNDATION INSULATION 4/19/2019 12:55:28 PM SPEC HOME L33, B2 - BERRES RIDGE 1st ADD'N 20044 HEATH AVENUE - LAKEVILLE, MN 55044 2OTT023 84.2.19 ES 1699 1277 852 3828 4.18.19 ES 4.19.19 CB 3.22.19 CB 8'- 1 /18" 9'- 1 /18" 8'-4" THE MAVERICK 1/ 8 " = 1 ' -0" 21 RI G H T E L E V A T I O N 1/ 8 " = 1 ' -0" 22 LE F T E L E V A T I O N 1/ 8 " = 1 ' -0" 23 RE A R E L E V A T I O N Se c u r e d o o r c l o s e d u n t i l d e c k i s co n s t r u c t e d w i t h a s e p a r a t e p e r m i t . 1 1 ' - 1 0 " 2 ' - 0 " 0' - 2 " 18 ' - 1 0 " 31 ' - 2 " 50 ' - 0 " 1' - 4 1 / 2 " 8' - 3 " M . O . 1' - 0 1 / 2 " 2' - 1 1 / 2 " 16 ' - 3 " M . O . 2' - 1 1 / 2 " 10 ' - 0 " 15 ' - 0 " 17 ' - 0 " 3'-6" ( H ) x 8 " ( W ) P O U R E D CO N C R E T E F O U N D . W A L L W / 2" x 8 " I N T E R I O R L E D G E O N 16 " x 8 " C O N C R E T E F T G ' S . RE B A R P E R C O D E . 2'-10 " ( H ) x 8 " ( W ) P O U R E D CO N C R E T E F O U N D . W A L L O N 16 " x 8 " C O N C R E T E F T G ' S . RE B A R P E R C O D E . 8' -4" ( H ) x 8 " ( W ) P O U R E D CO N C R E T E F O U N D . W A L L O N 20 " x 8 " C O N C R E T E F T G ' S . RE B A R P E R C O D E . 2x 6 S T U D S @ 1 6 " O . C . O N HA L F -HI G H 6 " B L O C K O N 16 " x 8 " C O N C R E T E F T G ' S . RE B A R P E R C O D E . 0' - 4 " 0 ' - 4 " 2" F O A M I N S U L A T I O N BE T W E E N W A L L & S L A B 11 ' - 8 " 8' - 0 " 2 ' - 0 " 2 7 ' - 0 " 1 5 ' - 0 " 6 ' - 0 " 5 0 ' - 0 " 42' - 2" 7' - 10" 2' - 0" 5' - 10" 36' - 2" 6' - 0" 19 ' - 8 " 20 ' - 6 " 10 ' - 8 " 1 5 ' - 9 1 / 4 " 4 ' - 2 3 / 4 " 4 ' - 2 3 / 4 " 1 1 ' - 1 1 1 / 4 " 4' - 5 " 7' - 4 " 0' - 9 1 / 2 " 6' - 7 " 22 ' - 1 0 1 / 2 " 22 ' - 4 " 8'-4" ( H ) x 8 " ( W ) P O U R E D CO N C R E T E F O U N D . W A L L O N 20 " x 8 " C O N C R E T E F T G ' S . RE B A R P E R C O D E . AL L D I M E N S I O N S A R E TO E X T E R I O R O F CO N C R E T E , N O T I N S U L A T I O N AN C H O R B O L T S ON E A C H S I D E OF B E A R I N G P O I N T AN C H O R B O L T S ON E A C H S I D E OF B E A R I N G P O I N T 2 9 ' - 0 " 2 1 ' - 0 " 50' - 0" 3 ' - 9 " 6 ' - 1 " :L O O K O U T W A L L : 2x 6 S T U D S @ 1 6 " O . C . O N 3' -6" ( H ) x 8 " ( W ) P O U R E D CO N C R E T E F O U N D . W A L L O N 20 " x 8 " C O N C R E T E F T G . RE B A R P E R C O D E 1 4 ' - 4 " 8 ' - 0 " 2 2 ' - 4 " 9 ' - 1 0 " 8' -4" ( H ) x 8 " ( W ) P O U R E D CO N C R E T E F O U N D . W A L L O N 20 " x 8 " C O N C R E T E F T G ' S . RE B A R P E R C O D E . AN C H O R B O L T S ON E A C H S I D E OF B E A R I N G P O I N T 8'-4" ( H ) x 8 " ( W ) P O U R E D CO N C R E T E F O U N D . W A L L O N 20 " x 8 " C O N C R E T E F T G ' S . RE B A R P E R C O D E . 8' - 0 " 42 ' - 0 " 4' - 0 " EG R E S S WE L L 50 ' - 0 " GA R A G E F O U N D A T I O N TO B E D R O P P E D 1 7 " FR O M H O U S E F O U N D A T I O N 8'-4" ( H ) x 1 0 " ( W ) P O U R E D CO N C R E T E F O U N D . W A L L W / 4" x 2 5 " E X T E R I O R L E D G E O N 20 " x 8 " C O N C R E T E F T G ' S . RE B A R P E R C O D E . 36 " x 3 6 " x 1 2 " C O N C R E T E F T G . W/ ( 3 ) # 5 R E B A R E A C H W A Y , B O T H S I D E S . 36 " x 3 6 " x 1 2 " C O N C R E T E F T G . W/ ( 3 ) # 5 R E B A R E A C H W A Y . 48 " x 4 8 " x 1 2 " C O N C R E T E F T G . W/ ( 4 ) # 5 R E B A R E A C H W A Y 36 " x 3 6 " x 1 2 " C O N C R E T E F T G . W/ ( 3 ) # 5 R E B A R E A C H W A Y . T H E I D E A S , D E S I G N S , D R A W I N G S A N D S P E C I F I C A T I O N S R E P R E S E N T E D H E R E I N A R E A N D S H A L L R E M A I N T H E E X C L U S I V E C O P Y R I G H T P R O P E R T Y O F O N E T E N T E N H O M E S . N O P A R T T H E R E O F S H A L L B E U S E D , C O P I E D , O R D I S C L O S E D I N C O N N E C T I O N W I T H A N Y W O R K O R P R O J E C T O T H E R T H A N T H E S P E C I F I E D P R O J E C T F O R W H I C H T H E Y H A V E B E E N P R E P A R E D W I T H O U T T H E W R I T T E N C O N S E N T O F O N E T E N T E N H O M E S . T H E P L A N S F U R N I S H E D H E R E I N W E R E P R E P A R E D U P O N R E Q U E S T B Y D R A F T S P E R S O N S W H O A R E N O T R E G I S T E R E D A R C H I T E C T S O R E N G I N E E R S . O N E T E N T E N H O M E S A S S U M E S N O R E S P O N S I B I L I T Y F O R S T R U C T U R A L O R D I M E N S I O N A L E R R O R S O R O M I S S I O N S . T H E C O N T R A C T O R A N D / O R O W N E R M U S T V E R I F Y A N D C H E C K A L L N O T E S D E T A I L S , E L E V A T I O N S , S E C T I O N S A N D F L O O R P L A N S A N D N O T I F Y O N E T E N T E N H O M E S O F A N Y E R R O R S O R O M I S S I O N S P R I O R T O T H E S T A R T O F C O N S T R U C T I O N . N O W A R R A N T I E S A R E E X P R E S S E D O R I M P L I E D I N C L U D I N G C O M P L I A N C E O F T H I S P L A N W I T H A P P L I C A B L E B U I L D I N G C O D E R E Q U I R E M E N T S . T H E S E L E C T I O N A N D A P P L I C A T I O N O F C O R R E C T S T R U C T U R A L M A T E R I A L S I S T H E R E S P O N S I B I L I T Y O F T H E B U I L D E R , T H E O W N E R O R T H E U S E R O F T H E S E P L A N S . DATE SQUARE FEET PROJECT SHEET OF UPPER: MAIN: BONUS: TOTAL: LOWER: RELEASED REV. 1 REV. 2 REV. 3 REV. 4 REV. 5 PLATE HEIGHTS UPPER: MAIN: POUR: P.O. BOX 391 5411 LAKERS LANE, SUITE 204 NISSWA, MN 56468 PH (612) 327-7582 NORTHHOUSE-RD.COM BRAINERD LAKES TWIN CITIES 3000 COUNTY ROAD 42 WEST, SUITE 202 BURNSVILLE, MN 55337 PH (952)-953-4000 ONETENTENHOMES.COM UN S P E C I F I E D H E A D E R S T O B E 2 -2x 1 0 W / 2 T R I M M E R S 10 " M I N . S T A I R T R E A D D E P T H & 7 3 / 4 " M A X S T A I R R I S E R H E I G H T AL L A N G L E S A R E 4 5 D E G R E E S U N L E S S N O T E D O T H E R W I S E AL L E X T E R I O R D I M E N S I O N S A R E T O O U T S I D E O F S H E A T H I N G , CONCRETE OR FOUNDATION INSULATION 4/19/2019 12:55:29 PM SPEC HOME L33, B2 - BERRES RIDGE 1st ADD'N 20044 HEATH AVENUE - LAKEVILLE, MN 55044 3OTT023 84.2.19 ES 1699 1277 852 3828 4.18.19 ES 4.19.19 CB 3.22.19 CB 8'- 1 /18" 9'- 1 /18" 8'-4" THE MAVERICK 1/ 4 " = 1 ' -0" 31 FO U N D A T I O N P L A N UP 1 6 R UN E X C A V A T E D FU R N A C E SU M P W. H . F. D . BA T H VI N Y L . ME C H A N I C A L / ST O R A G E ME C H A N I C A L S M Y V A R Y . 1 1 ' - 1 0 " 2 ' - 0 " 20 ' - 6 " 10 ' - 8 " 0' - 2 " 18 ' - 1 0 " 31 ' - 2 " 50 ' - 0 " 42' - 2" 7' - 10" 1 8 " F L O O R T R U S S E S P E R M F G . S P A C I N G 1' - 4 1 / 2 " 8' - 3 " M . O . 1' - 0 1 / 2 " 2' - 1 1 / 2 " 16 ' - 3 " M . O . 2' - 1 1 / 2 " 3' x 4 ' F . G . S H W R W/ S U R R O U N D 1 8 " F L O O R T R U S S E S P E R M F G . S P A C I N G 8' - 0 " 42 ' - 0 " 50 ' - 0 " 2' - 0" 5' - 10" 36' - 2" 6' - 0" 1 2 ' - 2 " 4 ' - 0 " 4 ' - 0 " 1 6 ' - 0 " UN E X C A V A T E D 10 ' - 0 " 15 ' - 0 " 17 ' - 0 " 2 2 ' - 4 " 2 9 ' - 0 " 2 1 ' - 0 " 6 ' - 0 " 1 5 ' - 0 " 2 7 ' - 0 " 2 ' - 0 " 2/ 4 x 6 / 8 21 L I N E N 2/ 8 x 6 / 8 SE T O N 3 X S I L L 20' - 0" 16' - 2" 6 ' - 7 " 2 ' - 6 " 1 ' - 6 " 8 ' - 9 " 3 ' - 0 " 2x 6 S T U D S @ 1 6 " O . C . O N HA L F -HI G H 6 " B L O C K O N 16 " x 8 " C O N C R E T E F T G ' S . RE B A R P E R C O D E . 5' - 0 " 5' - 1 0 " 8' - 1 0 " 3 -14 " F L U S H L V L 24 " C A N T . A B O V E 0' - 4 " 0 ' - 4 " * A L L D I M E N S I O N S A R E TO EXTERIOR OF CO N C R E T E , N O T I N S U L A T I O N 2" F O A M I N S U L A T I O N BE T W E E N W A L L & S L A B BE D R O O M # 5 CA R P E T . 18 ' - 1 0 3 / 4 " 10 ' - 1 1 / 4 " 4' - 0 " 9' - 0 " 4' V A N I T Y 2x 6 2/ 6 x 6 / 8 5/ 0 x 6 / 8 R & S H . @ 6 5 " CO D E T . SM O K E DE T . SM O K E DE T . CO D E T . FA M I L Y R O O M CA R P E T . 6' - 8 " 4' - 2 " KN E E W A L L W/ P A I N T E D SP I N D E L S FL O O R GI R D E R 2 -2x 1 0 2 -2x 1 0 22 ' - 4 " 11 ' - 8 " 8' - 0 " 19 ' - 8 " 9 50' - 0" 5 0 ' - 0 " AN C H O R B O L T S ON E A C H S I D E OF B E A R I N G P O I N T AN C H O R B O L T S ON E A C H S I D E OF B E A R I N G P O I N T 3 -2x 1 0 AN C H O R B O L T S ON E A C H S I D E O F BE A R I N G P O I N T 9 ' - 1 0 " AI R E X . 2x 1 0 F L U S H 2 EG R E S S WE L L 3' - 1 0 " 8 ' - 0 " 1 4 ' - 4 " 3 -2x 1 0 W / 2 T R I M M E R S GA R A G E F O U N D A T I O N TO B E D R O P P E D 1 7 " FR O M H O U S E F O U N D A T I O N 1/ 4 " = 1 ' -0" 41 LO W E R F L O O R P L A N T H E I D E A S , D E S I G N S , D R A W I N G S A N D S P E C I F I C A T I O N S R E P R E S E N T E D H E R E I N A R E A N D S H A L L R E M A I N T H E E X C L U S I V E C O P Y R I G H T P R O P E R T Y O F O N E T E N T E N H O M E S . N O P A R T T H E R E O F S H A L L B E U S E D , C O P I E D , O R D I S C L O S E D I N C O N N E C T I O N W I T H A N Y W O R K O R P R O J E C T O T H E R T H A N T H E S P E C I F I E D P R O J E C T F O R W H I C H T H E Y H A V E B E E N P R E P A R E D W I T H O U T T H E W R I T T E N C O N S E N T O F O N E T E N T E N H O M E S . T H E P L A N S F U R N I S H E D H E R E I N W E R E P R E P A R E D U P O N R E Q U E S T B Y D R A F T S P E R S O N S W H O A R E N O T R E G I S T E R E D A R C H I T E C T S O R E N G I N E E R S . O N E T E N T E N H O M E S A S S U M E S N O R E S P O N S I B I L I T Y F O R S T R U C T U R A L O R D I M E N S I O N A L E R R O R S O R O M I S S I O N S . T H E C O N T R A C T O R A N D / O R O W N E R M U S T V E R I F Y A N D C H E C K A L L N O T E S D E T A I L S , E L E V A T I O N S , S E C T I O N S A N D F L O O R P L A N S A N D N O T I F Y O N E T E N T E N H O M E S O F A N Y E R R O R S O R O M I S S I O N S P R I O R T O T H E S T A R T O F C O N S T R U C T I O N . N O W A R R A N T I E S A R E E X P R E S S E D O R I M P L I E D I N C L U D I N G C O M P L I A N C E O F T H I S P L A N W I T H A P P L I C A B L E B U I L D I N G C O D E R E Q U I R E M E N T S . T H E S E L E C T I O N A N D A P P L I C A T I O N O F C O R R E C T S T R U C T U R A L M A T E R I A L S I S T H E R E S P O N S I B I L I T Y O F T H E B U I L D E R , T H E O W N E R O R T H E U S E R O F T H E S E P L A N S . DATE SQUARE FEET PROJECT SHEET OF UPPER: MAIN: BONUS: TOTAL: LOWER: RELEASED REV. 1 REV. 2 REV. 3 REV. 4 REV. 5 PLATE HEIGHTS UPPER: MAIN: POUR: P.O. BOX 391 5411 LAKERS LANE, SUITE 204 NISSWA, MN 56468 PH (612) 327-7582 NORTHHOUSE-RD.COM BRAINERD LAKES TWIN CITIES 3000 COUNTY ROAD 42 WEST, SUITE 202 BURNSVILLE, MN 55337 PH (952)-953-4000 ONETENTENHOMES.COM UN S P E C I F I E D H E A D E R S T O B E 2 -2x 1 0 W / 2 T R I M M E R S 10 " M I N . S T A I R T R E A D D E P T H & 7 3 / 4 " M A X S T A I R R I S E R H E I G H T AL L A N G L E S A R E 4 5 D E G R E E S U N L E S S N O T E D O T H E R W I S E AL L E X T E R I O R D I M E N S I O N S A R E T O O U T S I D E O F S H E A T H I N G , CONCRETE OR FOUNDATION INSULATION 4/19/2019 12:55:29 PM SPEC HOME L33, B2 - BERRES RIDGE 1st ADD'N 20044 HEATH AVENUE - LAKEVILLE, MN 55044 4OTT023 84.2.19 ES 1699 1277 852 3828 4.18.19 ES 4.19.19 CB 3.22.19 CB 8'- 1 /18" 9'- 1 /18" 8'-4" THE MAVERICK UF E R G r o u n d -P r o v i d e 2 0 ' R e b a r i n f o o t i n g a n d s t u b up n e a r e l e c t r i c a l s e r v i c e p a n e l . UP 1 7 R DN 1 6 R DN 5 R DN 5 R 42' - 0" 8' - 0" 42 ' - 0 " 8' - 0 " 36 " R E F KI T C H E N LA M I N A T E . DI N I N G RO O M LA M I N A T E . GR E A T R O O M LA M I N A T E . FO Y E R LA M I N A T E . OF F I C E CA R P E T . MU D RO O M VI N Y L . SI N K DW PO R C H CO N C R E T E . 6' - 0" 36' - 0" 6' - 0" 2' - 0" 4/ 0 x 6 / 8 18 ' - 1 0 " 31 ' - 2 " 11 ' - 6 " 7' - 4 " 20 ' - 6 " 10 ' - 8 " 50 ' - 0 " 2' - 3 " 16 ' - 0 " 2' - 3 " 1' - 2 " 8' - 0 " 1' - 6 " 1' - 2" 4' - 10" 1' - 2 " 9' - 2 " 1' - 2 " 4" R E I N F O R C E D C O N C R E T E S L A B , SL O P E T O W A R D S D O O R S 5/ 8 " T Y P E X G Y P . B D . A L L C O M M O N WA L L S & C E I L I N G GA R A G E P L A T E H E I G H T T O MA T C H M A I N F L O O R P L A T E 16 ' x 8 ' O . H . GA R A G E DO O R 2 0 " F L O O R T R U S S E S P E R M F G . S P A C I N G 2 0 " F L O O R T R U S S E S P E R M F G . S P A C I N G TY P . 0' - 4 1 / 2 " PO W D E R VI N Y L . 16 " S H . PA N T R Y LA M I N A T E . 3/ 0 x 6 / 8 W / 12 " D . S . SL ' S 4 ' - 0 " 8 ' - 0 " 2 ' - 0 " 1 4 ' - 0 " 50 ' - 0 " 5' - 9 " 5' - 9 " 3' - 7 " 4' - 3 " 8' x 8 ' O . H . GA R A G E DO O R 50' - 0" 5 0 ' - 0 " 6 ' - 0 " 1 5 ' - 0 " 2 7 ' - 0 " 2 ' - 0 " 17 ' - 0 " 15 ' - 0 " 10 ' - 0 " 2 2 ' - 0 " 3' V A N I T Y 2/ 4 x 6 / 8 PK T BE N C H W / BE A D B D . & H O O K S 3/ 0 x 6 / 8 OP G . GA R A G E 2' - 0 " 20 ' - 8 " 2/ 4 x 6 / 8 R & S H . @ 6 5 " 4' - 0 " 4' - 6 " 2/ 4 x 6 / 8 PK T KN E E W A L L W / PA I N T E D S P I N D L E S RE C Y C L E @ 6 ' - 10" H.H. AB O V E L A N D I N G 16' - 0" 6' - 9" 10' - 6" 2' - 9" DO U B L E F R A M E D WA L L F O R RE F R E C E S S U. C . L I G H T 9' - 0 " 8' - 0 " 7' - 6 " 7' - 6 " 2' - 3 " 7' - 9 " 4 ' - 9 " 4 ' - 5 1 / 2 " 4 ' - 3 1 / 2 " 5 ' - 3 " 3 ' - 3 " R -38 M I N . I N S U L A T I O N IN F L O O R A B O V E 1 2 ' - 0 " 4 ' - 0 " 4 ' - 0 " 1 6 ' - 0 " 5' - 0 " 6' - 8 " 7' - 8 " 0' - 1 0 " 2 ' - 7 " 4 ' - 2 " 5 ' - 0 " 3 ' - 6 " 6 ' - 9 " G I R D E R T R U S S GI R D E R T R U S S FL O O R GI R D E R 2' - 7" 3' - 5" SE E D E T A I L 2 0 " F L O O R T R U S S E S P E R M F G . S P A C I N G 2 -2x 1 0 2 -2x 1 0 3 -14 " L V L F L U S H 2 -11 7 / 8 " LS L F L U S H 2 -11 7 / 8 " L S L 2 -2x 1 0 2 -9 1 / 2 " L S L D R O P P E D 2 -2x 1 0 2 -2x 1 0 W / 2 T R I M M E R S 3 -2x 6 ST A G G E R E D UP P E R S 7' - 1 0 " PO R T A L F R A M E W / H O L D -DO W N S PO R T A L F R A M E W/ H O L D -DO W N S 3 -20 " L V L 2 ' - 7 " 3 ' - 5 " EN D P A N E L OV E N / MI C R O DE S K 9 ' - 6 " 4 ' - 0 3 / 4 " 3' - 6 " 5' - 6 " 3/ 0 x 6 / 8 FU L L V I E W E Q E Q B . W . P . 6 ' - 0 " 50 " L I N E A R EL E C T R I C F . P . 18 " A . F . F NO M A N T E L OF F S U R R O U N D 2 ' - 0 " 9" H E A T DU C T 2 -2x 1 0 2 -2x 1 0 3 -2x 1 0 3 -2x 1 0 2 -2x 1 0 24 " C A N ' T A B O V E 3 12 66 11 11 11 8 11 11 11 8 4 4 4 AT T I C AC C E S S B. W . P . 4' - 0 " B. W . P . 3' - 3 " B. W . P . 1' - 1 0 1 / 2 " B. W . P . 1' - 1 0 1 / 2 " B . W . P . 4 ' - 0 " B . W . P . 5 ' - 0 " B. W . P . 2' - 9 " B. W . P . 2' - 9 " B . W . P . 4 ' - 0 " 5x 7 P S L 4 -2x 6 B . W . P . 4 ' - 0 " B . W . P . 4 ' - 0 " B. W . P . 4' - 0 " B . W . P . 2 ' - 0 " B. W . P . 4' - 0 " B. W . P . 3' - 0 " B. W . P . 5' - 0 " B . W . P . 4 ' - 0 " B . W . P . 4 ' - 0 " WA L L A B O V E BE A R I N G O N FL O O R T R U S S E S 2 -2x 1 0 W / 2 T R I M M E R S 3 -2x 6 2 -2x 1 0 2 -2x 1 0 3 -2x 1 0 3 -2x 1 0 SH I P L A P FL O O R T O C E I L I N G ON F I R E P L A C E BU M P O U T 1' - 0 " 5x 5 P S L 2' - 6 " 4' - 2 " 2' - 4 " 36 " G A S S CO O K T O P W / WO O D H O O D AB O V E 12 " S H . 2 -2x 1 0 FL U S H M F G . R O O F T R U S S E S @ 2 4 " O . C . B . W . P . 3 ' - 0 " 2 9 ' - 0 " 2 1 ' - 0 " FL O O R GI R D E R 1 0 ' - 0 " RA I L I N G PE R C O D E B . W . P . 2 ' - 0 " B . W . P . 2 ' - 0 " 2/ 8 x 6 / 8 FI R E R A T E D R & S H . @ 6 5 " 5/ 0 x 6 / 8 3 ' - 4 " 3 ' - 8 " 4' - 0 " 2 -2x 1 0 GA R A G E F O U N D A T I O N TO B E D R O P P E D 1 7 " FR O M H O U S E F O U N D A T I O N 1/ 4 " = 1 ' -0" 51 MA I N F L O O R P L A N T H E I D E A S , D E S I G N S , D R A W I N G S A N D S P E C I F I C A T I O N S R E P R E S E N T E D H E R E I N A R E A N D S H A L L R E M A I N T H E E X C L U S I V E C O P Y R I G H T P R O P E R T Y O F O N E T E N T E N H O M E S . N O P A R T T H E R E O F S H A L L B E U S E D , C O P I E D , O R D I S C L O S E D I N C O N N E C T I O N W I T H A N Y W O R K O R P R O J E C T O T H E R T H A N T H E S P E C I F I E D P R O J E C T F O R W H I C H T H E Y H A V E B E E N P R E P A R E D W I T H O U T T H E W R I T T E N C O N S E N T O F O N E T E N T E N H O M E S . T H E P L A N S F U R N I S H E D H E R E I N W E R E P R E P A R E D U P O N R E Q U E S T B Y D R A F T S P E R S O N S W H O A R E N O T R E G I S T E R E D A R C H I T E C T S O R E N G I N E E R S . O N E T E N T E N H O M E S A S S U M E S N O R E S P O N S I B I L I T Y F O R S T R U C T U R A L O R D I M E N S I O N A L E R R O R S O R O M I S S I O N S . T H E C O N T R A C T O R A N D / O R O W N E R M U S T V E R I F Y A N D C H E C K A L L N O T E S D E T A I L S , E L E V A T I O N S , S E C T I O N S A N D F L O O R P L A N S A N D N O T I F Y O N E T E N T E N H O M E S O F A N Y E R R O R S O R O M I S S I O N S P R I O R T O T H E S T A R T O F C O N S T R U C T I O N . N O W A R R A N T I E S A R E E X P R E S S E D O R I M P L I E D I N C L U D I N G C O M P L I A N C E O F T H I S P L A N W I T H A P P L I C A B L E B U I L D I N G C O D E R E Q U I R E M E N T S . T H E S E L E C T I O N A N D A P P L I C A T I O N O F C O R R E C T S T R U C T U R A L M A T E R I A L S I S T H E R E S P O N S I B I L I T Y O F T H E B U I L D E R , T H E O W N E R O R T H E U S E R O F T H E S E P L A N S . DATE SQUARE FEET PROJECT SHEET OF UPPER: MAIN: BONUS: TOTAL: LOWER: RELEASED REV. 1 REV. 2 REV. 3 REV. 4 REV. 5 PLATE HEIGHTS UPPER: MAIN: POUR: P.O. BOX 391 5411 LAKERS LANE, SUITE 204 NISSWA, MN 56468 PH (612) 327-7582 NORTHHOUSE-RD.COM BRAINERD LAKES TWIN CITIES 3000 COUNTY ROAD 42 WEST, SUITE 202 BURNSVILLE, MN 55337 PH (952)-953-4000 ONETENTENHOMES.COM UN S P E C I F I E D H E A D E R S T O B E 2 -2x 1 0 W / 2 T R I M M E R S 10 " M I N . S T A I R T R E A D D E P T H & 7 3 / 4 " M A X S T A I R R I S E R H E I G H T AL L A N G L E S A R E 4 5 D E G R E E S U N L E S S N O T E D O T H E R W I S E AL L E X T E R I O R D I M E N S I O N S A R E T O O U T S I D E O F S H E A T H I N G , CONCRETE OR FOUNDATION INSULATION 4/19/2019 12:55:29 PM SPEC HOME L33, B2 - BERRES RIDGE 1st ADD'N 20044 HEATH AVENUE - LAKEVILLE, MN 55044 5OTT023 84.2.19 ES 1699 1277 852 3828 4.18.19 ES 4.19.19 CB 3.22.19 CB 8'- 1 /18" 9'- 1 /18" 8'-4" THE MAVERICK TEMPER glass if within 36" of landing. Ve r i f y l o a d s w i t h g i r d e r tr u s s s p e c s , m a y r e q u i r e re m o v a l o f t o p p l a t e s a t be a r i n g d u e t o c r u s h i n g . DN 1 7 R BE D R O O M # 4 CA R P E T . BA T H VI N Y L . BE D R O O M # 3 CA R P E T . OW N E R ' S SU I T E CA R P E T 12 " B O X V A U L T HA L L CA R P E T . EN SU I T E TI L E . 7'- 6" V A N I T Y CL O S E T CA R P E T . R & S H . @ 6 5 " BE D R O O M # 2 CA R P E T .11 ' - 0 " 13 ' - 6 " 17 ' - 6 " 6' - 0" 36' - 0" 2' - 0" 2' - 0" 17 ' - 0 " 15 ' - 0 " 10 ' - 0 " 42 ' - 0 " 42 ' - 0 " 5 ' T U B / S H W R 2/ 4 x 6 / 8 CL O S E T CA R P E T . 2/ 4 x 6 / 8 PK T 2/ 4 x 6 / 8 2/ 4 x 6 / 8 2/ 6 x 6 / 8 2' L I N E N 3' V A N I T Y 3' V A N I T Y 2/ 6 x 6 / 8 2/ 4 x 6 / 8 L. T . 2/ 8 x 6 / 8 LA U N D R Y VI N Y L . CL O S E T CA R P E T . CL O S E T CA R P E T . 3' x 5 ' T U B W / 4" T I L E D E C K 2/ 6 x 6 / 8 MA K E -UP LI N E N 2/ 6 x 6 / 8 PK T TI L E SH O W E R SH E L F HA L F W A L L W / GL A S S P A N E L 5' - 9 " 5' - 3 " 4' - 7 " 4' - 7 " 4' - 4 " 8' - 9 " 8' - 9 " 2 0 ' - 0 " 1 6 ' - 0 " 2/ 6 x 6 / 8 PK T CO N T R O L S 5' - 7 7 / 8 " 11 ' - 4 1 / 8 " 7' - 6 " 7' - 6 " 4 0 ' - 0 " 6 ' - 0 " 1 1 ' - 0 " 2 9 ' - 0 " 4 6 ' - 0 " 1 6 ' - 0 " 4 ' - 0 " 4 ' - 0 " 1 2 ' - 0 " 5' - 0 " 5' - 0 " 1' - 8 " 30 ' - 4 " 11 ' - 0 " 6' - 4 1 / 4 " 3' - 1 1 3 / 4 " 4' - 3 " 5' - 5 " 3' - 6 " 7' - 6 " 2x 6 14 ' - 8 " 3' - 7 " 6' - 7 1 / 4 " 4' - 7 3 / 4 " 7' - 2 " 5' - 4 " 1 4 ' - 1 " 2 ' - 0 " 3 ' - 6 " 6 ' - 5 " 5 ' - 4 " 2 ' - 8 " 1 1 ' - 1 1 1 / 2 " 6 ' - 4 " 4 ' - 4 1 / 2 " 5 ' - 9 1 / 4 " R & S H . @ 6 5 " CO D E T . SM O K E DE T . SM O K E DE T . SM O K E DE T . SM O K E DE T . MF G . R O O F T R U S S E S @ 2 4 " O . C . MF G . R O O F T R U S S E S @ 2 4 " O . C . AT T I C AC C E S S 2 -2x 1 0 2 -9 1 / 2 " L S L W/ 2 T R I M M E R S 2 - 2 x 6 E A . S I D E KN E E W A L L W / PA I N T E D S P I N D L E S R & S H . @ 4 8 " 2/ 4 x 6 / 8 OP G . 2/ 6 x 6 / 8 PK T 4' V A N I T Y 48 " F . G . S H W R 2/ 6 x 6 / 8 2x 6 BA T H VI N Y L . TY P . 2' - 0 " 2 -2x 1 0 2 -2x 1 0 2 -2x 1 0 2 -2x 1 0 2 -2x 1 0 5 4 4 1 10 1 5 7 2/ 8 x 6 / 8 WA S H E R DR Y E R R & S H . @ 6 5 " 2/ 0 S H W R DR . SM O K E DE T . B . W . P . 3 ' - 0 " B. W . P . 2' - 3 " B. W . P . 2' - 3 " B. W . P . 3' - 0 " B. W . P . 3' - 0 " B . W . P . 3 ' - 0 " B . W . P . 3 ' - 0 " B . W . P . 3 ' - 0 " B. W . P . 3' - 0 " B. W . P . 3' - 0 " B. W . P . 3' - 0 " B. W . P . 3' - 0 " B . W . P . 3 ' - 0 " B . W . P . 3 ' - 0 " 46' - 0" 8 ' - 1 " 6 ' - 0 1 / 2 " 3 -2x 1 0 2 ' - 0 " T H E I D E A S , D E S I G N S , D R A W I N G S A N D S P E C I F I C A T I O N S R E P R E S E N T E D H E R E I N A R E A N D S H A L L R E M A I N T H E E X C L U S I V E C O P Y R I G H T P R O P E R T Y O F O N E T E N T E N H O M E S . N O P A R T T H E R E O F S H A L L B E U S E D , C O P I E D , O R D I S C L O S E D I N C O N N E C T I O N W I T H A N Y W O R K O R P R O J E C T O T H E R T H A N T H E S P E C I F I E D P R O J E C T F O R W H I C H T H E Y H A V E B E E N P R E P A R E D W I T H O U T T H E W R I T T E N C O N S E N T O F O N E T E N T E N H O M E S . T H E P L A N S F U R N I S H E D H E R E I N W E R E P R E P A R E D U P O N R E Q U E S T B Y D R A F T S P E R S O N S W H O A R E N O T R E G I S T E R E D A R C H I T E C T S O R E N G I N E E R S . O N E T E N T E N H O M E S A S S U M E S N O R E S P O N S I B I L I T Y F O R S T R U C T U R A L O R D I M E N S I O N A L E R R O R S O R O M I S S I O N S . T H E C O N T R A C T O R A N D / O R O W N E R M U S T V E R I F Y A N D C H E C K A L L N O T E S D E T A I L S , E L E V A T I O N S , S E C T I O N S A N D F L O O R P L A N S A N D N O T I F Y O N E T E N T E N H O M E S O F A N Y E R R O R S O R O M I S S I O N S P R I O R T O T H E S T A R T O F C O N S T R U C T I O N . N O W A R R A N T I E S A R E E X P R E S S E D O R I M P L I E D I N C L U D I N G C O M P L I A N C E O F T H I S P L A N W I T H A P P L I C A B L E B U I L D I N G C O D E R E Q U I R E M E N T S . T H E S E L E C T I O N A N D A P P L I C A T I O N O F C O R R E C T S T R U C T U R A L M A T E R I A L S I S T H E R E S P O N S I B I L I T Y O F T H E B U I L D E R , T H E O W N E R O R T H E U S E R O F T H E S E P L A N S . DATE SQUARE FEET PROJECT SHEET OF UPPER: MAIN: BONUS: TOTAL: LOWER: RELEASED REV. 1 REV. 2 REV. 3 REV. 4 REV. 5 PLATE HEIGHTS UPPER: MAIN: POUR: P.O. BOX 391 5411 LAKERS LANE, SUITE 204 NISSWA, MN 56468 PH (612) 327-7582 NORTHHOUSE-RD.COM BRAINERD LAKES TWIN CITIES 3000 COUNTY ROAD 42 WEST, SUITE 202 BURNSVILLE, MN 55337 PH (952)-953-4000 ONETENTENHOMES.COM UN S P E C I F I E D H E A D E R S T O B E 2 -2x 1 0 W / 2 T R I M M E R S 10 " M I N . S T A I R T R E A D D E P T H & 7 3 / 4 " M A X S T A I R R I S E R H E I G H T AL L A N G L E S A R E 4 5 D E G R E E S U N L E S S N O T E D O T H E R W I S E AL L E X T E R I O R D I M E N S I O N S A R E T O O U T S I D E O F S H E A T H I N G , CONCRETE OR FOUNDATION INSULATION 4/19/2019 12:55:30 PM SPEC HOME L33, B2 - BERRES RIDGE 1st ADD'N 20044 HEATH AVENUE - LAKEVILLE, MN 55044 6OTT023 84.2.19 ES 1699 1277 852 3828 4.18.19 ES 4.19.19 CB 3.22.19 CB 8'- 1 /18" 9'- 1 /18" 8'-4" THE MAVERICK 1/ 4 " = 1 ' -0" 61 UP P E R F L O O R P L A N TE M P E R i f g l a s s wi t h i n 6 0 " o f t u b f l o o r TE M P E R i f g l a s s wi t h i n 6 0 " o f f l o o r FA N FA N FA N FA N -M i n . 1 5 " c l e a r a n c e t o a n y ob s t r u c t i o n f r o m c e n t e r o f W. C . , 2 4 " i n f r o n t ( t y p ) . 7: 1 2 7: 1 2 7: 1 2 8: 1 2 8: 1 2 8: 1 2 8: 1 2 18 " O V E R H A N G S & 1 2 " R A K E S T Y P . ST A N D A R D E N E R G Y H E E L S @ 7 : 1 2 & 8 : 1 2 T Y P . 7: 1 2 WATCH DOG WATER PROOF COATING FROM FOOTING TO SILL SEALER 6 M I L P O L Y V . B . , O V E R L A P ED G E S M I N . 1 2 " & T A P E . SE A L A L L O P E N I N G S 4" M I N . L A Y E R 3/ 4 " R I V E R R O C K 3 1 / 2 " C O N C R E T E S L A B ANCHOR BOLT PER CODE TRT'D 2x8 SILL PLATE W/ CLOSED CELL ROLL SILL SEALER GRADE GRANULAR FILL 4" DRAIN TILE W/ SILT SOCK 1" F O A M B O A R D ( R -5) I N S U L A T I O N W/ A C O U S T I C A L S E A L A N T @ T O P & B O T T O M E D G E S , B E T W E E N I N S U L . & S L A B & A T A L L V E R T I C A L E D G E S PO L Y U R E T H A N E C A U L K OR E L A S T O M E R I C SE A L A N T @ A L L J O I N T S MIN. 0' - 6" VE R I F Y F L O O R S Y S T E M WI T H F L O O R P L A N S 3/ 4 " T & G SU B F L O O R L O W E R F L O O R P L A T E H E I G H T 8 ' - 2 " M A I N F L O O R P L A T E H E I G H T 9 ' - 1 1 / 8 " 6 M I L . V . B . 1/ 2 " G Y P . B D . VE R I F Y F L O O R S Y S T E M WI T H F L O O R P L A N S U P P E R F L O O R P L A T E H E I G H T 8 ' - 1 1 / 8 " 6 M I L . V . B . 1/ 2 " G Y P . B D . 3/ 4 " T & G SU B F L O O R 6 M I L . V . B . 2x6 STUDS @ 16" O.C. W/ R -21 F.G. INSULATION 2x6 STUDS @ 16" O.C. W/ R -21 F.G. INSULATION 8'-4"(H) x 8"(W) POURED CONCRETE FOUND. WALL ON 20" x 8" CONCRETE FTG'S. REBAR PER CODE. 25/32" BILDRITE SHEATHING TYVEK (OR EQUAL) ROLL HOUSE WRAP SIDING, VERIFY W/ ELEVATIONS 5/ 8 " G Y P . B D . 5/ 8 " G Y P . B D . VENTED ALUMINUM SOFFIT PANELS ICE & WATER GUARD FROM EAVE TO 2'-0" MIN. OVER STRUCTURE VENT CHUTES & WIND WASH @ EACH TRUSS SPACE ASPHALT SHINGLES W/ 15# ROLL FELT UNDER 1/2" OSB ROOF SHEATHING MF G . R O O F TR U S S E S @ 2 4 " O . C . AT T I C V E N T I N G AS P E R C O D E R -49 M I N . B L O W N AT T I C I N S U L A T I O N ALUMINUM FASCIA W/ 2x6 SUB FASCIA ALUMINUM DRIP EDGE RIM JOIST RIM JOIST R -20 M I N . S P R A Y FO A M I N S U L A T I O N , CO V E R F O U N D A T I O N W A L L GMX THERMAL DRAINAGE BOARD (R -10) INSULATION DRYVIT INSULATION PROTECTION FROM SIDING TO 6" BELOW GRADE 5000 PSI CONCRETE @ ALL FOOTINGS *OUTSIDE OF FOUNDATION TO ALIGN WITH OUTSIDE OF SHEATING R -20 M I N . S P R A Y FO A M I N S U L A T I O N AL L D U C T W O R K & P L U M B I N G TO R E M A I N A B O V E I N S U L A T I O N TY V E K O R E Q U A L HO U S E W R A P 5/ 8 " T Y P E ' X ' GY P . B D . , T A P E & MU D A L L S E A M S 1" R I G I D IN S U L A T I O N 3/ 4 " T & G S U B F L O O R R -30 M I N . BL O W N I N S U L A T I O N FL O O R T R U S S 2x 4 T Y P . TA P E R E D S M A R T S I D E CO L U M N 2x 4 @ T O P FR O N T TO P V I E W 4x 4 P O S T FR A M I N G 1 ' - 6 " 1' - 6 " 0' - 1 0 " 1' - 4 " 18 " S Q U A R E FR A M E D B A S E W/ C U L T U R E D S T O N E 1/ 8 " = 1 ' -0" 71 RO O F P L A N T H E I D E A S , D E S I G N S , D R A W I N G S A N D S P E C I F I C A T I O N S R E P R E S E N T E D H E R E I N A R E A N D S H A L L R E M A I N T H E E X C L U S I V E C O P Y R I G H T P R O P E R T Y O F O N E T E N T E N H O M E S . N O P A R T T H E R E O F S H A L L B E U S E D , C O P I E D , O R D I S C L O S E D I N C O N N E C T I O N W I T H A N Y W O R K O R P R O J E C T O T H E R T H A N T H E S P E C I F I E D P R O J E C T F O R W H I C H T H E Y H A V E B E E N P R E P A R E D W I T H O U T T H E W R I T T E N C O N S E N T O F O N E T E N T E N H O M E S . T H E P L A N S F U R N I S H E D H E R E I N W E R E P R E P A R E D U P O N R E Q U E S T B Y D R A F T S P E R S O N S W H O A R E N O T R E G I S T E R E D A R C H I T E C T S O R E N G I N E E R S . O N E T E N T E N H O M E S A S S U M E S N O R E S P O N S I B I L I T Y F O R S T R U C T U R A L O R D I M E N S I O N A L E R R O R S O R O M I S S I O N S . T H E C O N T R A C T O R A N D / O R O W N E R M U S T V E R I F Y A N D C H E C K A L L N O T E S D E T A I L S , E L E V A T I O N S , S E C T I O N S A N D F L O O R P L A N S A N D N O T I F Y O N E T E N T E N H O M E S O F A N Y E R R O R S O R O M I S S I O N S P R I O R T O T H E S T A R T O F C O N S T R U C T I O N . N O W A R R A N T I E S A R E E X P R E S S E D O R I M P L I E D I N C L U D I N G C O M P L I A N C E O F T H I S P L A N W I T H A P P L I C A B L E B U I L D I N G C O D E R E Q U I R E M E N T S . T H E S E L E C T I O N A N D A P P L I C A T I O N O F C O R R E C T S T R U C T U R A L M A T E R I A L S I S T H E R E S P O N S I B I L I T Y O F T H E B U I L D E R , T H E O W N E R O R T H E U S E R O F T H E S E P L A N S . DATE SQUARE FEET PROJECT SHEET OF UPPER: MAIN: BONUS: TOTAL: LOWER: RELEASED REV. 1 REV. 2 REV. 3 REV. 4 REV. 5 PLATE HEIGHTS UPPER: MAIN: POUR: P.O. BOX 391 5411 LAKERS LANE, SUITE 204 NISSWA, MN 56468 PH (612) 327-7582 NORTHHOUSE-RD.COM BRAINERD LAKES TWIN CITIES 3000 COUNTY ROAD 42 WEST, SUITE 202 BURNSVILLE, MN 55337 PH (952)-953-4000 ONETENTENHOMES.COM UN S P E C I F I E D H E A D E R S T O B E 2 -2x 1 0 W / 2 T R I M M E R S 10 " M I N . S T A I R T R E A D D E P T H & 7 3 / 4 " M A X S T A I R R I S E R H E I G H T AL L A N G L E S A R E 4 5 D E G R E E S U N L E S S N O T E D O T H E R W I S E AL L E X T E R I O R D I M E N S I O N S A R E T O O U T S I D E O F S H E A T H I N G , CONCRETE OR FOUNDATION INSULATION 4/19/2019 12:55:31 PM SPEC HOME L33, B2 - BERRES RIDGE 1st ADD'N 20044 HEATH AVENUE - LAKEVILLE, MN 55044 7OTT023 84.2.19 ES 1699 1277 852 3828 4.18.19 ES 4.19.19 CB 3.22.19 CB 8'- 1 /18" 9'- 1 /18" 8'-4" THE MAVERICK WI N D O W S C H E D U L E TY P E M A R K M A N U F A C T U R E R M O D E L C O U N T U N I T R O U G H W I D T H R O U G H H E I G H T H E A D H E I G H T 1 W I N D S O R N E X T D I M E N S I O N 2 6 0 4 8 S L 5 ' - 0 " 4 ' - 0 " 6 ' - 1 0 " 2 W I N D S O R N E X T D I M E N S I O N 1 6 0 4 2 S L 5 ' - 0 " 3 ' - 6 " 6 ' - 1 0 " 3 W I N D S O R N E X T D I M E N S I O N 1 7 2 6 0 S L 6 ' - 0 " 5 ' - 0 " 6 ' - 1 0 " 4 W I N D S O R N E X T D I M E N S I O N 5 2 4 2 4 A W N 2 ' - 0 " 2 ' - 0 " 6 ' - 1 0" 5 W I N D S O R N E X T D I M E N S I O N 2 2 4 - 4 8 - 2 4 6 0 S L 8 ' - 0 " 5 ' - 0 " 6 ' - 1 0 " 6 W I N D S O R N E X T D I M E N S I O N 2 3 6 1 8 P I C 3 ' - 0 " 1 ' - 6 " 8 ' - 0 " 7 W I N D S O R N E X T D I M E N S I O N 1 4 8 2 4 A W N F I X E D T E M P . 4 ' - 0 " 2 ' - 0 " 6 ' - 1 0 " 8 W I N D S O R N E X T D I M E N S I O N 2 4 8 6 0 S L 4 ' - 0 " 5 ' - 0 " 6 ' - 1 0 " 9 W I N D S O R N E X T D I M E N S I O N 1 4 8 3 6 P I C 4 ' - 0 " 3 ' - 0 " 1 ' - 8 1 / 4 " 10 W I N D S O R N E X T D I M E N S I O N 1 2 4 2 4 - 3 A W N F I X E D 6 ' - 2 " 2 ' - 0 " 6 ' - 1 0 " 11 W I N D S O R N E X T D I M E N S I O N 6 P 4 2 6 0 / A R 2 4 T 4 ' - 0 " 7 ' - 0 " 8 ' - 0 " 12 W I N D S O R N E X T D I M E N S I O N 1 4 8 4 8 P I C T E M P 4 ' - 0 " 4 ' - 0 " 11 ' - 1 0 " 3/ 8 " = 1 ' -0" 72 TY P . P O U R E D W A L L S E C T I O N 1/ 2 " = 1 ' -0" 73 GA R A G E C E I L I N G 1/ 2 " = 1 ' -0" 74 CO L U M N T A P E R E D 3" M I N . A B S O R P V C G A S T I G H T PI P E F R O M S U B S L A B T O MI N . 1 2 " A B O V E R O O F , M U S T BE R U N T H R U C O N D I T I O N E D S P A C E . PI P E C A N B E C O N N E C T E D T O SU M P S Y S T E M O R H A V E "T " F I T T I N G ( M I N . 1 0 ' -0" E A . W A Y ) IN G R A V E L U N D E R S L A B . EN D O F P I P E M U S T B E M I N . 1 0 ' -0" AW A Y F R O M A N Y W I N D O W O R OT H E R O P E N I N G T H A T I S L E S S TH A N 2 ' -0" B E L O W E N D O F P I P E . EN D O F P I P E M U S T A L S O B E MI N . 1 0 ' -0" A W A Y F R O M A N Y WI N D O W O R O T H E R O P E N I N G I N AD J O I N I N G O R A D J A C E N T BU I L D I N G S . SU F F I C I E N T S P A C E M U S T B E LE F T A R O U N D P I P E I N A T T I C S P A C E TO A D D F A N . S P A C E M U S T B E MI N . ∅24 " C E N T E R E D O N A X I S O F PI P E W / M I N . 3 ' -0" V E R T I C A L S P A C E . A S I N G L E P I P E C A N B E U S E D I F A L L SO I L G A S E S I N D W E L L I N G C A N FL O W F R E E L Y B E T W E E N A L L L E V E L S OF F O U N D A T I O N . T H I S I N C L U D E S IN T E R I O R F O O T I N G S & O T H E R BA R R I E R S I F A I R F L O W H A S BE E N E S T A B L I S H E D . LA B E L T H E V E N T P I P E A T L E A S T ON C E P E R F L O O R A N D I N AC C E S S I B L E A T T I C S W I T H "R A D O N R E D U C T I O N S Y S T E M " . ON E E L E C T R I C A L R E C E P T A C L E I S RE Q U I R E D I N T H E A T T I C N E A R TH E V E N T P I P E F O R O P T . F A N . :PA S S I V E R A D O N S Y S T E M : R- 4 o n p i p e i n a t t i c 6 M I L P O L Y V . B . , O V E R L A P ED G E S M I N . 1 2 " & T A P E . SE A L A L L O P E N I N G S 4" M I N . L A Y E R 3/ 4 " R I V E R R O C K 3 1 / 2 " C O N C R E T E S L A B AN C H O R B O L T PE R C O D E TY P I C A L 2 x 6 EX T E R I O R W A L L TR T ' D 2 x 6 S I L L P L A T E W/ R O L L S I L L S E A L E R GR A D E GR A N U L A R F I L L :W A L K O U T W A L L : 2x 6 S T U D S @ 1 6 " O . C . O N 3' -6" ( H ) x 8 " ( W ) P O U R E D CO N C R E T E F O U N D . W A L L W/ 2 " x 4 " I N T . L E D G E O N 20 " x 8 " C O N C R E T E F T G ' S . RE B A R P E R C O D E . PO L Y U R E T H A N E C A U L K OR E L A S T O M E R I C SE A L A N T @ A L L J O I N T S M I N . 0 ' - 6 " 50 0 0 P S I C O N C R E T E @ A L L F O O T I N G S 2" F O A M B O A R D (R -10 ) I N S U L A T I O N 4" D R A I N T I L E W/ S I L T S O C K WA T E R P R O O F C O A T I N G FR O M F O O T I N G T O SI L L S E A L E R WATER PROOF COATING FROM FOOTING TO INSIDE OF WALL 6 M I L P O L Y V . B . , O V E R L A P ED G E S M I N . 1 2 " & T A P E . SE A L A L L O P E N I N G S 4" M I N . L A Y E R 3/ 4 " R I V E R R O C K 3 1 / 2 " C O N C R E T E S L A B ANCHOR BOLT PER CODE TYPICAL 2x6 EXTERIOR WALL TRT'D 2x8 SILL PLATE W/ ROLL SILL SEALER GRADE MIN. 0' - 6" GRANULAR FILL 4" DRAIN TILE W/ SILT SOCK :LOOKOUT WALL: 2x6 STUDS @ 16" O.C. ON 3'-6"(H) x 8"(W) POURED CONCRETE FOUND. WALL ON 20" x 8" CONCRETE FTG. REBAR PER CODE PO L Y U R E T H A N E C A U L K OR E L A S T O M E R I C SE A L A N T @ A L L J O I N T S 1" F O A M B O A R D ( R -5) I N S U L A T I O N W/ A C O U S T I C A L S E A L A N T @ T O P & B O T T O M E D G E S , B E T W E E N I N S U L . & S L A B & A T A L L V E R T I C A L E D G E S IN S U L A T I O N & S E A L A N T T O BE C O N T . O V E R W A L L 2" FOAMBOARD (R -10) INSULATION INSULATION PROTECTION FROM SIDING TO 6" BELOW GRADE 50 0 0 P S I C O N C R E T E @ A L L F O O T I N G S *O U T S I D E O F F O U N D A T I O N T O A L I G N W I T H OU T S I D E O F S H E A T H I N G AN C H O R B O L T PE R C O D E TR T ' D 2 x 6 S I L L P L A T E W/ R O L L S I L L S E A L E R 1" F O A M B O A R D ( R -5) I N S U L A T I O N W/ A C O U S T I C A L S E A L A N T @ T O P & B O T T O M E D G E S , B E T W E E N I N S U L . & S L A B & A T A L L V E R T I C A L E D G E S 18 " T O P C H O R D BE A R I N G F L O O R T R U S S E S , SP A C I N G P E R M F G . 3/ 4 " T & G SU B F L O O R 6 M I L . V . B . 1/ 2 " G Y P . B D . 2x 6 S T U D S @ 1 6 " O . C . W/ R -20 F . G . I N S U L A T I O N 5/ 8 " T Y P E ' X ' G Y P B O A R D , TA P E & M U D A L L S E A M S RI M J O I S T R -20 M I N . S P R A Y FO A M I N S U L A T I O N GM X T H E R M A L D R A I N A G E B O A R D (R -10 ) I N S U L A T I O N 5/ 8 " G Y P . B D . , T A P E & M U D A L L S E A M S SL O P E D C O N C R E T E SL A B , F L A S H A S R E Q ' D AT H O U S E W A L L 0' - 4 " PO U R E D FN D . W A L L WA T C H D O G W A T E R P R O O F CO A T I N G F R O M F O O T I N G T O SI L L S E A L E R 2 ' - 1 " FASTEN TOP PLATE TO HEADER W/ (2) ROWS OF 16d SINKER NAILS @ 3" O.C. TYP. MIN. 3/8" WOOD STRUCTURAL PANEL SHEATHING SECTION TE N S I O N S T R A P P E R TA B L E R 6 0 2 . 1 0 . 6 . 4 (O N O P P O S I T E S I D E OF S H E A T H I N G ) IF N E E D E D , P A N E L SP L I C E E D G E S S H A L L OC C U R O V E R A N D B E NA I L E D T O C O M M O N BL O C K I N G W I T H I N MI D D L E 2 4 " O F W A L L MI D -HE I G H T . O N E RO W O F 3 " O . C . NA I L I N G I S R E Q U I R E D IN E A C H P A N E L E D G E . TY P I C A L P O R T A L FR A M E C O N S T R U C T I O N . MI N . D O U B L E 2 x 4 P O S T (K I N G A N D J A C K S T U D ) . NU M B E R O F J A C K S T U D S PE R T A B L E S R 5 0 2 . 5 ( 1 ) & ( 2 ) . MI N . 1 0 0 0 L B H O L D -DO W N DE V I C E ( E M B E D D E D I N T O CO N C R E T E & N A I L E D IN T O F R A M I N G ) FR O N T E L E V A T I O N MI N . F O O T I N G S I Z E U N D E R O P E N I N G I S 12 " X 1 2 " . A T U R N E D D O W N S L A B S H A L L BE P E R M I T T E D A T D O O R O P E N I N G S . MI N . ( 1 ) 5 / 8 " D I A . A N C H O R B O L D IN S T A L L E D P E R R 4 0 3 . 1 . 6 W / 2" X 2 " X 3 / 1 6 " P L A T E W A S H E R . MI N . R E I N F O R C I N G O F F O U N D A T I O N , ON E # 4 B A R T O P & B O T T O M O F FO O T I N G . L A P B A R S 1 5 " M I N I M U M . MI N . ( 2 ) 4 2 0 0 L B S T R A P -TY P E H O L D - DO W N S ( E M B E D D E D I N T O C O N C R E T E AN D N A I L E D I N T O F R A M I N G ) MI N . L E N G T H O F P A N E L PE R T A B L E R 6 0 2 . 1 0 . 5 MI N . D O U B L E 2 x 4 F R A M I N G C O V E R E D WI T H M I N . 3 / 8 " T H I C K W O O D S T R U C T U R A L PA N E L S H E A T H I N G W / 8 d C O M M O N O R GA L V A N I Z E D B O X N A I L S A T 3 " O . C . I N AL L F R A M I N G ( S T U D S , B L O C K I N G A N D S I L L S ) T Y P . HE A D E R T O J A C K S T U D S T R A P P E R TA B L E R 6 0 2 . 1 0 . 6 . 4 O N B O T H S I D E S O F OP E N I N G O P P O S I T E S I D E O F S H E A T H I N G FA S T E N S H E A T H I N G T O H E A D E R W I T H 8d C O M M O N O R G A L V A N I Z E D B O X NA I L S I N 3 " G R I D P A T T E R N A S S H O W N MI N . 3 " X 1 1 1 / 4 " N E T H E A D E R , ST E E L H E A D E R P R O H I B I T E D 1 0 ' - 0 " M A X . H E I G H T H E I G H T P O N Y W A L L 1 2 ' - 0 " M A X T O T A L W A L L H E I G H T EX T E N T O F H E A D E R W I T H S I N G L E P O R T A L FR A M E ( O N E B R A C E D W A L L P A N E L ) 2' - 0 " T O 1 8 ' - 0 " F I N I S H E D W I D T H O F OP E N I N G F O R S I N G L E O R D O U B L E P O R T A L 3/4" SUBFLOOR 2x8 SILL PLATE, ANCHOR BOLTS PER CODE 8" POURED FOUNDATION WALL 2x 6 E X T E R I O R W A L L WI T H 1 / 2 " S H E A T H I N G 2" F O A M IN S U L A T I O N 2x 4 R I B B O N A T T A C H E D T O TO P & B O T T O M C H O R D S U S I N G 0. 1 3 5 " x 3 . 5 0 " B O X N A I L S @ 6 " O. C . T H R O U G H O U T & 1 N A I L IN T O E A C H W E B 3/ 4 " S U B F L O O R 2x 8 S I L L P L A T E , A N C H O R BO L T S P E R C O D E 8" P O U R E D FO U N D A T I O N W A L L 4x 2 G A B L E T R U S S 2x 6 S T U D S @ 1 6 " O . C . O N HA L F -HI G H 6 " B L O C K O N 16 " x 8 " C O N C R E T E F T G ' S . RE B A R P E R C O D E . TR T ' D S I L L P L A T E PO L Y U R E T H A N E C A U L K OR E L A S T O M E R I C SE A L A N T @ A L L J O I N T S SL E E V E E V E R Y 10 ' -0" M I N . 6 M I L P O L Y V . B . , O V E R L A P ED G E S M I N . 1 2 " & T A P E . SE A L A L L O P E N I N G S 4" M I N . L A Y E R 3/ 4 " R I V E R R O C K 3 1 / 2 " C O N C R E T E S L A B AN C H O R B O L T PE R C O D E 50 0 0 P S I C O N C R E T E @ A L L F O O T I N G S AN C H O R B O L T PE R C O D E TR T ' D 2 x 6 S I L L P L A T E W/ R O L L S I L L S E A L E R 1" F O A M B O A R D ( R -5) I N S U L A T I O N W/ A C O U S T I C A L S E A L A N T @ T O P & B O T T O M E D G E S , B E T W E E N I N S U L . & S L A B & A T A L L V E R T I C A L E D G E S VE R I F Y F L O O R S Y S T E M WI T H F L O O R P L A N S 3/ 4 " T & G SU B F L O O R 6 M I L . V . B . 1/ 2 " G Y P . B D . 2x 6 S T U D S @ 1 6 " O . C . W/ R -20 F . G . I N S U L A T I O N 7/ 1 6 " O S B SH E A T H I N G RI M J O I S T R -20 M I N . S P R A Y FO A M I N S U L A T I O N GM X T H E R M A L D R A I N A G E B O A R D (R -10 ) I N S U L A T I O N 5/ 8 " G Y P . B D . , T A P E & M U D A L L S E A M S SL O P E D C O N C R E T E ST O O P , F L A S H A S R E Q ' D AT H O U S E W A L L PO U R E D FN D . W A L L WA T C H D O G W A T E R P R O O F CO A T I N G F R O M F O O T I N G T O SI L L S E A L E R SI D I N G , V E R I F Y W/ E L E V A T I O N S TY V E K ( O R E Q U A L ) RO L L H O U S E W R A P 0' - 2 " FR O M S H E A T H I N G T O OU T S I D E O F F O U N D A T I O N T H E I D E A S , D E S I G N S , D R A W I N G S A N D S P E C I F I C A T I O N S R E P R E S E N T E D H E R E I N A R E A N D S H A L L R E M A I N T H E E X C L U S I V E C O P Y R I G H T P R O P E R T Y O F O N E T E N T E N H O M E S . N O P A R T T H E R E O F S H A L L B E U S E D , C O P I E D , O R D I S C L O S E D I N C O N N E C T I O N W I T H A N Y W O R K O R P R O J E C T O T H E R T H A N T H E S P E C I F I E D P R O J E C T F O R W H I C H T H E Y H A V E B E E N P R E P A R E D W I T H O U T T H E W R I T T E N C O N S E N T O F O N E T E N T E N H O M E S . T H E P L A N S F U R N I S H E D H E R E I N W E R E P R E P A R E D U P O N R E Q U E S T B Y D R A F T S P E R S O N S W H O A R E N O T R E G I S T E R E D A R C H I T E C T S O R E N G I N E E R S . O N E T E N T E N H O M E S A S S U M E S N O R E S P O N S I B I L I T Y F O R S T R U C T U R A L O R D I M E N S I O N A L E R R O R S O R O M I S S I O N S . T H E C O N T R A C T O R A N D / O R O W N E R M U S T V E R I F Y A N D C H E C K A L L N O T E S D E T A I L S , E L E V A T I O N S , S E C T I O N S A N D F L O O R P L A N S A N D N O T I F Y O N E T E N T E N H O M E S O F A N Y E R R O R S O R O M I S S I O N S P R I O R T O T H E S T A R T O F C O N S T R U C T I O N . N O W A R R A N T I E S A R E E X P R E S S E D O R I M P L I E D I N C L U D I N G C O M P L I A N C E O F T H I S P L A N W I T H A P P L I C A B L E B U I L D I N G C O D E R E Q U I R E M E N T S . T H E S E L E C T I O N A N D A P P L I C A T I O N O F C O R R E C T S T R U C T U R A L M A T E R I A L S I S T H E R E S P O N S I B I L I T Y O F T H E B U I L D E R , T H E O W N E R O R T H E U S E R O F T H E S E P L A N S . DATE SQUARE FEET PROJECT SHEET OF UPPER: MAIN: BONUS: TOTAL: LOWER: RELEASED REV. 1 REV. 2 REV. 3 REV. 4 REV. 5 PLATE HEIGHTS UPPER: MAIN: POUR: P.O. BOX 391 5411 LAKERS LANE, SUITE 204 NISSWA, MN 56468 PH (612) 327-7582 NORTHHOUSE-RD.COM BRAINERD LAKES TWIN CITIES 3000 COUNTY ROAD 42 WEST, SUITE 202 BURNSVILLE, MN 55337 PH (952)-953-4000 ONETENTENHOMES.COM UN S P E C I F I E D H E A D E R S T O B E 2 -2x 1 0 W / 2 T R I M M E R S 10 " M I N . S T A I R T R E A D D E P T H & 7 3 / 4 " M A X S T A I R R I S E R H E I G H T AL L A N G L E S A R E 4 5 D E G R E E S U N L E S S N O T E D O T H E R W I S E AL L E X T E R I O R D I M E N S I O N S A R E T O O U T S I D E O F S H E A T H I N G , CONCRETE OR FOUNDATION INSULATION 4/19/2019 12:55:31 PM SPEC HOME L33, B2 - BERRES RIDGE 1st ADD'N 20044 HEATH AVENUE - LAKEVILLE, MN 55044 8OTT023 84.2.19 ES 1699 1277 852 3828 4.18.19 ES 4.19.19 CB 3.22.19 CB 8'- 1 /18" 9'- 1 /18" 8'-4" THE MAVERICK 1/ 2 " = 1 ' -0" 81 TY P . P O U R E D W A L K O U T S E C T I O N 1/ 2 " = 1 ' -0" 82 TY P . P O U R E D L O O K O U T S E C T I O N 1/ 2 " = 1 ' -0" 83 TY P . H O U S E / G A R A G E W A L L 3/ 8 " = 1 ' -0" 84 ME T H O D P F H - PO R T A L F R A M E W I T H H O L D -DO W N S 1/ 2 " = 1 ' -0" 85 FL O O R T R U S S D E T A I L 1/ 2 " = 1 ' -0" 86 BE A R I N G W A L L S E C T I O N 1/ 2 " = 1 ' -0" 87 TY P . H O U S E / S T O O P W A L L 01: Upper Level Member Name Results Current Solution Comments Bedroom# 2 Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Owner's Suite Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Owner's Bathroom Window Passed 3 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bedroom #4 Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bedroom 3 & 4 Bath Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bedroom# 3 WIC Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bedroom #3 Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Stairs Window Passed 2 Piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL 02: Main Level Member Name Results Current Solution Comments Great Room Back Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Dining Room Side Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Dining Room Back Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bathroom Window Passed 3 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Mudroom Door Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Front Porch FLR Beam Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Garage 8' OHD Passed 3 Piece(s) 1 3/4" x 20" 2.0E Microllam® LVL Garage 16' OHD Passed 2 Piece(s) 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL Drop Beam Porch Passed 2 Piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL Front Door Hdr Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Office Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Flush Beam over Foyer (H)Passed 2 Piece(s) 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL Flush Beam Stairway down Passed 2 Piece(s) 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL Great Room Side Window Passed 3 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Dining Room Flush Beam Passed 3 Piece(s) 1 3/4" x 14" 2.0E Microllam® LVL Stair Landing Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Pantry Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Dining Room Hall Door Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Stairs Flush Beam Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Mudroom Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 03: Lower Level Member Name Results Current Solution Comments Family Room Flush Beam Passed 3 Piece(s) 1 3/4" x 14" 2.0E Microllam® LVL Bedroom# 5 Window Passed 3 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Door Hdr Mech/Storage Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 20044 Heath Ave, Lakeville, MN.4te JOB SUMMARY REPORT Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 1 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Snow Total Accessories 1 - Trimmer - SPF 3.00"3.00"1.50"459 289 748 None 2 - Trimmer - SPF 3.00"3.00"1.50"459 289 748 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)748 @ 1 1/2"3825 (3.00")Passed (20%)--1.0 D + 1.0 S (All Spans) Shear (lbs)470 @ 1' 1/4"2872 Passed (16%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)937 @ 2' 9"3946 Passed (24%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.006 @ 2' 9"0.175 Passed (L/999+)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.017 @ 2' 9"0.262 Passed (L/999+)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 5' 6" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 6" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Upper Level, Bedroom# 2 WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Snow Loads Location (Side)Width (0.90)(1.15)Comments 0 - Self Weight (PLF)0 to 5' 6"N/A 7.0 1 - Uniform (PSF)0 to 5' 6"3'20.0 35.0 Snow - Main 2 - Uniform (PSF)0 to 5' 6"1'100.0 -Wall - Gable Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 2 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Snow Total Accessories 1 - Trimmer - SPF 3.00"3.00"1.50"710 446 1156 None 2 - Trimmer - SPF 3.00"3.00"1.50"710 446 1156 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)1156 @ 1 1/2"3825 (3.00")Passed (30%)--1.0 D + 1.0 S (All Spans) Shear (lbs)878 @ 1' 1/4"2872 Passed (31%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)2314 @ 4' 3"3946 Passed (59%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.040 @ 4' 3"0.275 Passed (L/999+)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.102 @ 4' 3"0.412 Passed (L/967)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 8' 6" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 8' 6" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Upper Level, Owner's Suite WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Snow Loads Location (Side)Width (0.90)(1.15)Comments 0 - Self Weight (PLF)0 to 8' 6"N/A 7.0 1 - Uniform (PSF)0 to 8' 6"3'20.0 35.0 Snow - Main 2 - Uniform (PSF)0 to 8' 6"1'100.0 -Wall - Gable Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 3 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 3 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Snow Total Accessories 1 - Trimmer - SPF 1.50"1.50"1.50"1000 1711 2711 None 2 - Trimmer - SPF 1.50"1.50"1.50"1000 1711 2711 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)2711 @ 0 2869 (1.50")Passed (94%)--1.0 D + 1.0 S (All Spans) Shear (lbs)1568 @ 10 3/4"4308 Passed (36%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)2880 @ 2' 1 1/2"5919 Passed (49%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.014 @ 2' 1 1/2"0.142 Passed (L/999+)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.023 @ 2' 1 1/2"0.213 Passed (L/999+)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 4' 3" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 4' 3" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Upper Level, Owner's Bathroom WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Snow Loads Location (Side)Width (0.90)(1.15)Comments 0 - Self Weight (PLF)0 to 4' 3"N/A 10.6 1 - Uniform (PSF)0 to 4' 3"23'20.0 35.0 Snow - Main Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 4 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Snow Total Accessories 1 - Trimmer - SPF 3.00"3.00"1.50"710 446 1156 None 2 - Trimmer - SPF 3.00"3.00"1.50"710 446 1156 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)1156 @ 1 1/2"3825 (3.00")Passed (30%)--1.0 D + 1.0 S (All Spans) Shear (lbs)878 @ 1' 1/4"2872 Passed (31%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)2314 @ 4' 3"3946 Passed (59%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.040 @ 4' 3"0.275 Passed (L/999+)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.102 @ 4' 3"0.412 Passed (L/967)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 8' 6" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 8' 6" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Upper Level, Bedroom #4 WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Snow Loads Location (Side)Width (0.90)(1.15)Comments 0 - Self Weight (PLF)0 to 8' 6"N/A 7.0 1 - Uniform (PSF)0 to 8' 6"3'20.0 35.0 Snow - Main 2 - Uniform (PSF)0 to 8' 6"1'100.0 -Wall - Gable Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 5 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Snow Total Accessories 1 - Trimmer - SPF 1.50"1.50"1.50"122 3 125 None 2 - Trimmer - SPF 1.50"1.50"1.50"122 3 125 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)126 @ 0 1913 (1.50")Passed (7%)--1.0 D + 1.0 S (All Spans) Shear (lbs)25 @ 10 3/4"2248 Passed (1%)0.90 1.0 D (All Spans) Moment (Ft-lbs)69 @ 1' 1 1/2"3088 Passed (2%)0.90 1.0 D (All Spans) Live Load Defl. (in)0.000 @ 0 0.075 Passed (2L/999+)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.000 @ 1' 1 1/2"0.112 Passed (L/999+)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 2' 3" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 2' 3" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Upper Level, Bedroom 3 & 4 Bath WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Snow Loads Location (Side)Width (0.90)(1.15)Comments 0 - Self Weight (PLF)0 to 2' 3"N/A 7.0 1 - Uniform (PSF)0 to 2' 3"0 20.0 35.0 Snow - Main 2 - Uniform (PSF)0 to 2' 3"1'100.0 -Wall - Gable Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 6 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Snow Total Accessories 1 - Trimmer - SPF 1.50"1.50"1.50"188 118 306 None 2 - Trimmer - SPF 1.50"1.50"1.50"188 118 306 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)306 @ 0 1913 (1.50")Passed (16%)--1.0 D + 1.0 S (All Spans) Shear (lbs)62 @ 10 3/4"2872 Passed (2%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)172 @ 1' 1 1/2"3946 Passed (4%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.000 @ 1' 1 1/2"0.075 Passed (L/999+)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.001 @ 1' 1 1/2"0.112 Passed (L/999+)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 2' 3" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 2' 3" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Upper Level, Bedroom# 3 WICMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Snow Loads Location (Side)Width (0.90)(1.15)Comments 0 - Self Weight (PLF)0 to 2' 3"N/A 7.0 1 - Uniform (PSF)0 to 2' 3"3'20.0 35.0 Snow - Main 2 - Uniform (PSF)0 to 2' 3"1'100.0 -Wall - Gable Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 7 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Snow Total Accessories 1 - Trimmer - SPF 3.00"3.00"1.50"207 289 496 None 2 - Trimmer - SPF 3.00"3.00"1.50"207 289 496 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)496 @ 1 1/2"3825 (3.00")Passed (13%)--1.0 D + 1.0 S (All Spans) Shear (lbs)312 @ 1' 1/4"2872 Passed (11%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)621 @ 2' 9"3946 Passed (16%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.006 @ 2' 9"0.175 Passed (L/999+)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.011 @ 2' 9"0.262 Passed (L/999+)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 5' 6" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 6" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Upper Level, Bedroom #3 WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Snow Loads Location (Side)Width (0.90)(1.15)Comments 0 - Self Weight (PLF)0 to 5' 6"N/A 7.0 1 - Uniform (PSF)0 to 5' 6"3'20.0 35.0 Snow - Main 2 - Uniform (PSF)0 to 5' 6"0 100.0 -Wall - Gable Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 8 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL Bearing Loads to Supports (lbs) Supports Total Available Required Dead Snow Total Accessories 1 - Trimmer - SPF 3.00"3.00"1.68"1568 2683 4251 None 2 - Trimmer - SPF 3.00"3.00"1.68"1568 2683 4251 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)4251 @ 1 1/2"7613 (3.00")Passed (56%)--1.0 D + 1.0 S (All Spans) Shear (lbs)2923 @ 1' 1/2"7902 Passed (37%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)6564 @ 3' 4"11985 Passed (55%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.098 @ 3' 4"0.214 Passed (L/788)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.155 @ 3' 4"0.321 Passed (L/497)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 6' 8" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 6' 8" o/c unless detailed otherwise. Upper Level, Stairs WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Snow Loads Location (Side)Width (0.90)(1.15)Comments 0 - Self Weight (PLF)0 to 6' 8"N/A 10.4 1 - Uniform (PSF)0 to 6' 8"23'20.0 35.0 Snow - Main Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 9 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Snow Total Accessories 1 - Trimmer - SPF 1.50"1.50"1.50"603 748/-64 157 1508/-64 None 2 - Trimmer - SPF 4.50"4.50"2.86"1855 1792 560 4207 None 3 - Trimmer - SPF 4.50"4.50"2.20"1333 1474 321 3128 None 4 - Trimmer - SPF 1.50"1.50"1.50"728 557/-64 277 1562/-64 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)1354 @ 11' 6"1913 (1.50")Passed (71%)--1.0 D + 0.75 L + 0.75 S (Alt Spans) Shear (lbs)1165 @ 2' 10 1/4"2498 Passed (47%)1.00 1.0 D + 1.0 L (Adj Spans) Moment (Ft-lbs)-1362 @ 3' 9 3/4"3431 Passed (40%)1.00 1.0 D + 1.0 L (Adj Spans) Live Load Defl. (in)0.006 @ 1' 10 1/8"0.127 Passed (L/999+)--1.0 D + 1.0 L (Alt Spans) Total Load Defl. (in)0.009 @ 1' 9 1/2"0.191 Passed (L/999+)--1.0 D + 1.0 L (Alt Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 11' 6" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 11' 6" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Main Level, Great Room Back WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Snow Loads Location (Side)Width (0.90)(1.00)(1.15)Comments 0 - Self Weight (PLF)0 to 11' 6"N/A 7.0 1 - Uniform (PSF)4' to 11' 6"8'15.0 40.0 -floor 2 - Uniform (PSF)0 to 4'11'15.0 40.0 -floor 3 - Uniform (PLF)0 to 11' 6"N/A 80.0 --wall 4 - Uniform (PSF)0 to 6' 6"3'20.0 -35.0 Snow - Main 5 - Uniform (PSF)0 to 6' 6"1'100.0 --Wall - Gable 6 - Point (lb)6' 6"N/A 459 -289 Linked from: Bedroom# 2 Window, Support 1 7 - Point (lb)11' 6"N/A 459 -289 Linked from: Bedroom# 2 Window, Support 2 Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 10 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Snow Total Accessories 1 - Trimmer - SPF 1.50"1.50"1.50"621 85 707 1413 None 2 - Trimmer - SPF 1.50"1.50"1.50"621 85 707 1413 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)1327 @ 0 1913 (1.50")Passed (69%)--1.0 D + 1.0 S (All Spans) Shear (lbs)768 @ 10 3/4"2872 Passed (27%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)1410 @ 2' 1 1/2"3946 Passed (36%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.009 @ 2' 1 1/2"0.142 Passed (L/999+)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.017 @ 2' 1 1/2"0.213 Passed (L/999+)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 4' 3" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 4' 3" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Main Level, Dining Room Side WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Snow Loads Location (Side)Width (0.90)(1.00)(1.15)Comments 0 - Self Weight (PLF)0 to 4' 3"N/A 7.0 1 - Uniform (PSF)0 to 4' 3"9' 6"20.0 -35.0 roof 2 - Uniform (PSF)0 to 4' 3"1'15.0 40.0 -Floor - Upper Level 3 - Uniform (PSF)0 to 4' 3"1'80.0 --Wall - Upper Level Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 11 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Snow Total Accessories 1 - Trimmer - SPF 3.00"3.00"1.50"775 540 1315 None 2 - Trimmer - SPF 4.50"4.50"1.50"1011 789 1800 None 3 - Trimmer - SPF 4.50"4.50"1.50"1011 789 1800 None 4 - Trimmer - SPF 3.00"3.00"1.50"775 540 1315 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)1314 @ 1 1/2"3825 (3.00")Passed (34%)--1.0 D + 1.0 S (Alt Spans) Shear (lbs)1065 @ 2' 11 3/4"2872 Passed (37%)1.15 1.0 D + 1.0 S (Adj Spans) Moment (Ft-lbs)1421 @ 1' 10 1/2"3946 Passed (36%)1.15 1.0 D + 1.0 S (Alt Spans) Live Load Defl. (in)0.004 @ 1' 10 13/16"0.127 Passed (L/999+)--1.0 D + 1.0 S (Alt Spans) Total Load Defl. (in)0.010 @ 1' 10 11/16"0.191 Passed (L/999+)--1.0 D + 1.0 S (Alt Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 11' 9" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 11' 9" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Main Level, Dining Room Back WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Snow Loads Location (Side)Width (0.90)(1.15)Comments 0 - Self Weight (PLF)0 to 11' 9"N/A 7.0 1 - Uniform (PSF)0 to 11' 9"3'15.0 35.0 floor 2 - Uniform (PLF)0 to 11' 9"N/A 80.0 -wall 3 - Uniform (PSF)0 to 1' 10 1/2"3'20.0 35.0 Snow - Main 4 - Uniform (PSF)9' 10 1/2" to 11' 9"3'20.0 35.0 Snow - Main 5 - Uniform (PSF)0 to 1' 10 1/2"1'100.0 -Wall - Gable 6 - Uniform (PSF)9' 10 1/2" to 11' 9"1'100.0 -Wall - Gable 7 - Point (lb)1' 10 1/2"N/A 710 446 Linked from: Owner's Suite Window, Support 1 8 - Point (lb)9' 10 1/2"N/A 710 446 Linked from: Owner's Suite Window, Support 2 Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 12 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 3 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Snow Total Accessories 1 - Trimmer - SPF 1.50"1.50"1.50"993 45 1543 2581 None 2 - Trimmer - SPF 1.50"1.50"1.50"867 45 1375 2287 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)2536 @ 0 2869 (1.50")Passed (88%)--1.0 D + 1.0 S (All Spans) Shear (lbs)1751 @ 10 3/4"4308 Passed (41%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)1872 @ 9"5919 Passed (32%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.002 @ 1' 1 5/16"0.075 Passed (L/999+)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.004 @ 1' 1 5/16"0.112 Passed (L/999+)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 2' 3" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 2' 3" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Main Level, Bathroom WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Snow Loads Location (Side)Width (0.90)(1.00)(1.15)Comments 0 - Self Weight (PLF)0 to 2' 3"N/A 10.6 1 - Uniform (PSF)0 to 2' 3"1'15.0 40.0 -floor 2 - Uniform (PLF)0 to 2' 3"N/A 80.0 --wall 3 - Uniform (PSF)9" to 2' 3"23'18.0 -35.0 roof 4 - Point (lb)9"N/A 1000 -1711 Linked from: Wdw Hdr Owner's Bath, Support 2 Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 13 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Total Accessories 1 - Trimmer - SPF 3.00"3.00"1.81"637 1667 2304 None 2 - Trimmer - SPF 3.00"3.00"1.81"637 1667 2304 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)2303 @ 1 1/2"3825 (3.00")Passed (60%)--1.0 D + 1.0 L (All Spans) Shear (lbs)893 @ 1' 1/4"2498 Passed (36%)1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs)1642 @ 1' 8"3431 Passed (48%)1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in)0.007 @ 1' 8"0.103 Passed (L/999+)--1.0 D + 1.0 L (All Spans) Total Load Defl. (in)0.010 @ 1' 8"0.154 Passed (L/999+)--1.0 D + 1.0 L (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 3' 4" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 3' 4" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Main Level, Mudroom DoorMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Loads Location (Side)Width (0.90)(1.00)Comments 0 - Self Weight (PLF)0 to 3' 4"N/A 7.0 1 - Uniform (PSF)0 to 3' 4"25'15.0 40.0 floor Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 14 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 •Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Snow Total Accessories 1 - Stud wall - SPF 5.50"5.50"1.69"1328 495 610 2433 Blocking 2 - Stud wall - SPF 5.50"5.50"1.71"1335 495 630 2460 Blocking All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)2179 @ 7' 11"7013 (5.50")Passed (31%)--1.0 D + 0.75 L + 0.75 S (All Spans) Shear (lbs)1499 @ 7' 1/4"2872 Passed (52%)1.15 1.0 D + 0.75 L + 0.75 S (All Spans) Moment (Ft-lbs)3565 @ 4' 4 1/2"3946 Passed (90%)1.15 1.0 D + 0.75 L + 0.75 S (All Spans) Live Load Defl. (in)0.051 @ 4' 1 11/16"0.190 Passed (L/999+)--1.0 D + 0.75 L + 0.75 S (All Spans) Total Load Defl. (in)0.135 @ 4' 1 5/8"0.379 Passed (L/672)--1.0 D + 0.75 L + 0.75 S (All Spans) System : Floor Member Type : Flush Beam Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/480) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 7' 8" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 8' 3" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Main Level, Front Porch FLR BeamMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Snow Loads Location (Side)Width (0.90)(1.00)(1.15)Comments 0 - Self Weight (PLF)0 to 8' 3"N/A 7.0 1 - Uniform (PSF)0 to 8' 3" (Front)3'15.0 40.0 -Floor - Upper Level 2 - Uniform (PLF)0 to 8' 3" (Front)N/A 80.0 --Wall - Upper Level 3 - Uniform (PSF)0 to 8' 3" (Front)2'20.0 -35.0 Snow - Porch 4 - Uniform (PLF)0 to 2' 9" (Front)N/A 100.0 --Wall - Gable 5 - Uniform (PSF)0 to 2' 9" (Front)3'20.0 -35.0 Snow - Main 6 - Uniform (PLF)4' 9" to 8' 3" (Front)N/A 100.0 --Wall - Gable 7 - Uniform (PSF)4' 9" to 8' 3" (Front)3'20.0 -35.0 Snow - Main 8 - Point (lb)2' 9" (Front)N/A 122 -3 Linked from: Bedroom 3 & 4 Bath Window, Support 1 9 - Point (lb)4' 9" (Front)N/A 122 -3 Linked from: Bedroom 3 & 4 Bath Window, Support 2 Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 15 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 3 piece(s) 1 3/4" x 20" 2.0E Microllam® LVL Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Snow Total Accessories 1 - Trimmer - PSL 5.50"5.50"2.53"3713 794 6252 10759 None 2 - Trimmer - PSL 7.00"7.00"5.50"7967 2446 13688 24101 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)21655 @ 8' 10"27563 (7.00")Passed (79%)--1.0 D + 1.0 S (All Spans) Shear (lbs)21215 @ 7' 1/2"22943 Passed (92%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)44503 @ 6' 9"81355 Passed (55%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.067 @ 4' 11 9/16"0.283 Passed (L/999+)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.107 @ 4' 11 1/2"0.425 Passed (L/956)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 9' 1" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 9' 4" o/c unless detailed otherwise. Main Level, Garage 8' OHDMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Snow Loads Location (Side)Width (0.90)(1.00)(1.15)Comments 0 - Self Weight (PLF)0 to 9' 3 1/2"N/A 30.6 1 - Uniform (PSF)0 to 6' 9"15'20.0 -35.0 Snow - Garage 2 - Uniform (PSF)6' 9" to 9' 3 1/2"3'20.0 -35.0 Snow - Garage 3 - Point (lb)6' 9"N/A 9218 3240 16130 E2 Roof Girder Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 16 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL Bearing Loads to Supports (lbs) Supports Total Available Required Dead Snow Total Accessories 1 - Trimmer - SPF 3.00"3.00"1.50"779 1172 1951 None 2 - Trimmer - SPF 3.00"3.00"1.50"779 1172 1951 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)1951 @ 1 1/2"7613 (3.00")Passed (26%)--1.0 D + 1.0 S (All Spans) Shear (lbs)1662 @ 1' 2 7/8"9878 Passed (17%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)7929 @ 8' 4 1/2"18346 Passed (43%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.325 @ 8' 4 1/2"0.550 Passed (L/608)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.542 @ 8' 4 1/2"0.825 Passed (L/366)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 14' 7" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 16' 9" o/c unless detailed otherwise. Main Level, Garage 16' OHDMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Snow Loads Location (Side)Width (0.90)(1.15)Comments 0 - Self Weight (PLF)0 to 16' 9"N/A 13.0 1 - Uniform (PSF)0 to 16' 9"4'20.0 35.0 roof Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 17 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL •Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. Bearing Loads to Supports (lbs) Supports Total Available Required Dead Snow Total Accessories 1 - Column - SPF 3.00"3.00"1.50"346 613 959 Blocking 2 - Column - SPF 5.50"5.50"1.50"1251 1987 3238 Blocking 3 - Column - SPF 5.50"5.50"1.50"510 847 1357 Blocking All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)3238 @ 8' 7"13956 (5.50")Passed (23%)--1.0 D + 1.0 S (Adj Spans) Shear (lbs)1390 @ 9' 7 1/4"7902 Passed (18%)1.15 1.0 D + 1.0 S (Adj Spans) Moment (Ft-lbs)-2960 @ 8' 7"11985 Passed (25%)1.15 1.0 D + 1.0 S (Adj Spans) Live Load Defl. (in)0.060 @ 13' 10 3/16"0.323 Passed (L/999+)--1.0 D + 1.0 S (Alt Spans) Total Load Defl. (in)0.092 @ 13' 10 15/16"0.484 Passed (L/999+)--1.0 D + 1.0 S (Alt Spans) System : Floor Member Type : Drop Beam Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Overhang deflection criteria: LL (2L/360) and TL (2L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 19' 1" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 19' 1" o/c unless detailed otherwise. Main Level, Drop Beam PorchMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Snow Loads Location (Side)Width (0.90)(1.15)Comments 0 - Self Weight (PLF)0 to 19' 1"N/A 10.4 1 - Uniform (PSF)0 to 19' 1" (Front)5'20.0 35.0 roof Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 18 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Total Accessories 1 - Trimmer - SPF 3.00"3.00"1.50"411 1042 1453 None 2 - Trimmer - SPF 3.00"3.00"1.50"411 1042 1453 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)1453 @ 1 1/2"3825 (3.00")Passed (38%)--1.0 D + 1.0 L (All Spans) Shear (lbs)937 @ 1' 1/4"2498 Passed (38%)1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs)1911 @ 2' 10 1/2"3431 Passed (56%)1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in)0.027 @ 2' 10 1/2"0.183 Passed (L/999+)--1.0 D + 1.0 L (All Spans) Total Load Defl. (in)0.038 @ 2' 10 1/2"0.275 Passed (L/999+)--1.0 D + 1.0 L (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 5' 9" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 9" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Main Level, Front Door HdrMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Loads Location (Side)Width (0.90)(1.00)Comments 0 - Self Weight (PLF)0 to 5' 9"N/A 7.0 1 - Uniform (PSF)0 to 5' 9"9' 3/4"15.0 40.0 floor Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 19 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Snow Total Accessories 1 - Trimmer - SPF 3.00"3.00"1.74"1097 780 709 2586 None 2 - Trimmer - SPF 3.00"3.00"1.74"1097 780 709 2586 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)2214 @ 1 1/2"3825 (3.00")Passed (58%)--1.0 D + 0.75 L + 0.75 S (All Spans) Shear (lbs)1380 @ 1' 1/4"2872 Passed (48%)1.15 1.0 D + 0.75 L + 0.75 S (All Spans) Moment (Ft-lbs)2490 @ 3' 3"3431 Passed (73%)1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in)0.037 @ 3' 3"0.208 Passed (L/999+)--1.0 D + 0.75 L + 0.75 S (All Spans) Total Load Defl. (in)0.071 @ 3' 3"0.313 Passed (L/999+)--1.0 D + 0.75 L + 0.75 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 6' 6" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 6' 6" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Main Level, Office WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Snow Loads Location (Side)Width (0.90)(1.00)(1.15)Comments 0 - Self Weight (PLF)0 to 6' 6"N/A 7.0 1 - Uniform (PSF)0 to 6' 6"6'15.0 40.0 -floor 2 - Uniform (PLF)0 to 6' 6"N/A 80.0 --wall 3 - Uniform (PLF)0 to 9"N/A 100.0 --gable 4 - Uniform (PSF)0 to 9"3'20.0 -35.0 roof 5 - Uniform (PSF)5' 9" to 6' 6"3'20.0 -35.0 roof 6 - Uniform (PLF)5' 9" to 6' 6"N/A 100.0 --gable 7 - Uniform (PSF)0 to 6' 6"3'20.0 -35.0 Snow - Porch 8 - Point (lb)9"N/A 207 -289 Linked from: Wdw Hdr Bed #3, Support 1 9 - Point (lb)5' 9"N/A 207 -289 Linked from: Wdw Hdr Bed #3, Support 2 Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 20 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL •Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. •At hanger supports, the Total Bearing dimension is equal to the width of the material that is supporting the hanger •¹ See Connector grid below for additional information and/or requirements. Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Total Accessories 1 - Stud wall - SPF 5.50"5.50"3.16"1328 3380 4708 Blocking 2 - Hanger on 11 7/8" SPF beam 5.50"Hanger¹1.50"1280 3263 4543 See note ¹ All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)4115 @ 8' 11 1/2"4725 (1.50")Passed (87%)--1.0 D + 1.0 L (All Spans) Shear (lbs)3177 @ 7' 11 5/8"8590 Passed (37%)1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs)8930 @ 4' 7 7/16"15953 Passed (56%)1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in)0.136 @ 4' 7 5/8"0.216 Passed (L/758)--1.0 D + 1.0 L (All Spans) Total Load Defl. (in)0.190 @ 4' 7 5/8"0.431 Passed (L/544)--1.0 D + 1.0 L (All Spans) System : Floor Member Type : Flush Beam Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/480) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 9' o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 9' o/c unless detailed otherwise. Main Level, Flush Beam over Foyer (H)MEMBER REPORT PASSED Connector: Simpson Strong-Tie Connectors Support Model Seat Length Top Nails Face Nails Member Nails Accessories 2 - Face Mount Hanger Connector not found N/A N/A N/A N/A Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Loads Location (Side)Width (0.90)(1.00)Comments 0 - Self Weight (PLF)0 to 8' 11 1/2"N/A 13.0 1 - Uniform (PSF)0 to 2' (Front)20'15.0 40.0 Floor - Upper Level 2 - Uniform (PSF)2' to 9' 5" (Front)17'15.0 40.0 Floor - Upper Level Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 21 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL •Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Snow Total Accessories 1 - Stud wall - SPF 5.50"5.50"2.00"884 2097 82 3063 Blocking 2 - Stud wall - SPF 5.50"5.50"1.86"822 1939 82 2843 Blocking All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)2981 @ 4"8181 (5.50")Passed (36%)--1.0 D + 1.0 L (All Spans) Shear (lbs)2661 @ 1' 5 3/8"8590 Passed (31%)1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs)5167 @ 2' 3"15953 Passed (32%)1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in)0.025 @ 2' 3"0.101 Passed (L/999+)--1.0 D + 1.0 L (All Spans) Total Load Defl. (in)0.035 @ 2' 3"0.201 Passed (L/999+)--1.0 D + 1.0 L (All Spans) System : Floor Member Type : Flush Beam Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/480) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 4' 8" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 4' 8" o/c unless detailed otherwise. Main Level, Flush Beam Stairway downMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Snow Loads Location (Side)Width (0.90)(1.00)(1.15)Comments 0 - Self Weight (PLF)0 to 4' 8 1/4"N/A 13.0 1 - Uniform (PSF)0 to 4' 8 1/4" (Front)3' 6"15.0 40.0 -stairs 2 - Uniform (PSF)0 to 4' 8 1/4" (Front)1'15.0 -35.0 floor 3 - Point (lb)2' 3" (Front)N/A 1328 3380 - Linked from: Flush Beam Foyer, Support 1 Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 22 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 3 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Snow Total Accessories 1 - Trimmer - SPF 1.50"1.50"1.50"919 65 1308 2292 None 2 - Trimmer - SPF 1.50"1.50"1.50"919 65 1308 2292 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)2227 @ 0 2869 (1.50")Passed (78%)--1.0 D + 1.0 S (All Spans) Shear (lbs)999 @ 10 3/4"4308 Passed (23%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)1810 @ 1' 7 1/2"5919 Passed (31%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.005 @ 1' 7 1/2"0.108 Passed (L/999+)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.008 @ 1' 7 1/2"0.162 Passed (L/999+)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 3' 3" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 3' 3" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Main Level, Great Room Side WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Snow Loads Location (Side)Width (0.90)(1.00)(1.15)Comments 0 - Self Weight (PLF)0 to 3' 3"N/A 10.6 1 - Uniform (PSF)0 to 3' 3"1'15.0 40.0 -floor 2 - Uniform (PLF)0 to 3' 3"N/A 80.0 --wall 3 - Uniform (PSF)0 to 3' 3"23'20.0 -35.0 roof Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 23 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 3 piece(s) 1 3/4" x 14" 2.0E Microllam® LVL •Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Total Accessories 1 - Column - SPF 5.50"5.50"1.56"1736 4200 5936 Blocking 2 - Column - SPF 5.50"5.50"1.56"1736 4200 5936 Blocking All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)5936 @ 4"20934 (5.50")Passed (28%)--1.0 D + 1.0 L (All Spans) Shear (lbs)4650 @ 1' 7 1/2"13965 Passed (33%)1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs)20325 @ 7' 6"36387 Passed (56%)1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in)0.244 @ 7' 6"0.358 Passed (L/705)--1.0 D + 1.0 L (All Spans) Total Load Defl. (in)0.345 @ 7' 6"0.717 Passed (L/499)--1.0 D + 1.0 L (All Spans) System : Floor Member Type : Flush Beam Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/480) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 15' o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 15' o/c unless detailed otherwise. Main Level, Dining Room Flush BeamMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Loads Location (Side)Width (0.90)(1.00)Comments 0 - Self Weight (PLF)0 to 15'N/A 21.5 1 - Uniform (PSF)0 to 15' (Front)14'15.0 40.0 floor Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 24 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Total Accessories 1 - Trimmer - SPF 1.50"1.50"1.50"40 40 None 2 - Trimmer - SPF 1.50"1.50"1.50"40 40 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)40 @ 0 1913 (1.50")Passed (2%)--1.0 D (All Spans) Shear (lbs)23 @ 10 3/4"2248 Passed (1%)0.90 1.0 D (All Spans) Moment (Ft-lbs)43 @ 2' 1 1/2"3088 Passed (1%)0.90 1.0 D (All Spans) Live Load Defl. (in)0.000 @ 0 0.142 Passed (2L/999+)--1.0 D (All Spans) Total Load Defl. (in)0.001 @ 2' 1 1/2"0.213 Passed (L/999+)--1.0 D (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 4' 3" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 4' 3" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Main Level, Stair Landing WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Loads Location (Side)Width (0.90)Comments 0 - Self Weight (PLF)0 to 4' 3"N/A 7.0 1 - Uniform (PLF)0 to 4' 3"N/A 12.0 Wall - Upper Level Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 25 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Snow Total Accessories 1 - Trimmer - SPF 1.50"1.50"1.50"632 45 906 1583 None 2 - Trimmer - SPF 1.50"1.50"1.50"632 45 906 1583 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)1538 @ 0 1913 (1.50")Passed (80%)--1.0 D + 1.0 S (All Spans) Shear (lbs)313 @ 10 3/4"2872 Passed (11%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)865 @ 1' 1 1/2"3946 Passed (22%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.002 @ 1' 1 1/2"0.075 Passed (L/999+)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.003 @ 1' 1 1/2"0.112 Passed (L/999+)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 2' 3" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 2' 3" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Main Level, Pantry WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Snow Loads Location (Side)Width (0.90)(1.00)(1.15)Comments 0 - Self Weight (PLF)0 to 2' 3"N/A 7.0 1 - Uniform (PSF)0 to 2' 3"1'15.0 40.0 -floor 2 - Uniform (PLF)0 to 2' 3"N/A 80.0 --wall 3 - Uniform (PSF)0 to 2' 3"23'20.0 -35.0 roof Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 26 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Snow Total Accessories 1 - Trimmer - SPF 1.50"1.50"1.50"704 752 179 1635 None 2 - Trimmer - SPF 1.50"1.50"1.50"704 752 179 1635 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)1456 @ 0 1913 (1.50")Passed (76%)--1.0 D + 1.0 L (All Spans) Shear (lbs)692 @ 10 3/4"2498 Passed (28%)1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs)1243 @ 1' 8 1/2"3431 Passed (36%)1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in)0.005 @ 1' 8 1/2"0.114 Passed (L/999+)--1.0 D + 1.0 L (All Spans) Total Load Defl. (in)0.009 @ 1' 8 1/2"0.171 Passed (L/999+)--1.0 D + 1.0 L (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 3' 5" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 3' 5" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Main Level, Dining Room Hall DoorMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Snow Loads Location (Side)Width (0.90)(1.00)(1.15)Comments 0 - Self Weight (PLF)0 to 3' 5"N/A 7.0 1 - Uniform (PSF)0 to 3' 5"11'15.0 40.0 -Floor - Upper Level 2 - Uniform (PSF)0 to 3' 5"1'80.0 --Wall - Upper Level 3 - Uniform (PSF)0 to 3' 5"1'100.0 --Wall - Gable 4 - Uniform (PSF)0 to 3' 5"3'20.0 -35.0 Snow - Main Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 27 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 •Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. •At hanger supports, the Total Bearing dimension is equal to the width of the material that is supporting the hanger •¹ See Connector grid below for additional information and/or requirements. Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Total Accessories 1 - Hanger on 9 1/4" SPF beam 3.50"Hanger¹1.50"361 913 1274 See note ¹ 2 - Stud wall - SPF 3.50"3.50"1.50"347 873 1220 Blocking All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)1146 @ 3 1/2"1913 (1.50")Passed (60%)--1.0 D + 1.0 L (All Spans) Shear (lbs)801 @ 1' 3/4"2498 Passed (32%)1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs)1468 @ 2' 10 1/4"3431 Passed (43%)1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in)0.018 @ 2' 10 1/4"0.128 Passed (L/999+)--1.0 D + 1.0 L (All Spans) Total Load Defl. (in)0.025 @ 2' 10 1/4"0.256 Passed (L/999+)--1.0 D + 1.0 L (All Spans) System : Floor Member Type : Flush Beam Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/480) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 5' 4" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 4" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Main Level, Stairs Flush BeamMEMBER REPORT PASSED Connector: Simpson Strong-Tie Connectors Support Model Seat Length Top Nails Face Nails Member Nails Accessories 1 - Face Mount Hanger U210-2 2.00"N/A 14-10d 6-10d None Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Loads Location (Side)Width (0.90)(1.00)Comments 0 - Self Weight (PLF)3 1/2" to 5' 7"N/A 7.0 1 - Uniform (PSF)0 to 5' 7" (Front)8'15.0 40.0 Floor - Upper Level Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 28 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Snow Total Accessories 1 - Trimmer - SPF 3.00"3.00"2.22"1120 50 1714 2884 None 2 - Trimmer - SPF 3.00"3.00"1.50"595 50 802 1447 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)2834 @ 1 1/2"3825 (3.00")Passed (74%)--1.0 D + 1.0 S (All Spans) Shear (lbs)1392 @ 1' 1/4"2872 Passed (48%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)1807 @ 1'3946 Passed (46%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.003 @ 1' 2 9/16"0.075 Passed (L/999+)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.005 @ 1' 2 9/16"0.112 Passed (L/999+)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 2' 6" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 2' 6" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Main Level, Mudroom WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Snow Loads Location (Side)Width (0.90)(1.00)(1.15)Comments 0 - Self Weight (PLF)0 to 2' 6"N/A 7.0 1 - Uniform (PSF)0 to 2' 6"1'15.0 40.0 -Floor - Upper Level 2 - Uniform (PSF)0 to 2' 6"1'80.0 --Wall - Upper Level 3 - Uniform (PSF)0 to 1'23'20.0 -35.0 Snow - Main 4 - Point (lb)1'N/A 1000 -1711 Linked from: Owner's Bathroom Window, Support 1 Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 29 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 3 piece(s) 1 3/4" x 14" 2.0E Microllam® LVL •Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Total Accessories 1 - Stud wall - SPF 5.50"5.50"5.32"3472 8400 11872 Blocking 2 - Stud wall - SPF 5.50"5.50"5.32"3472 8400 11872 Blocking All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)11872 @ 4"12272 (5.50")Passed (97%)--1.0 D + 1.0 L (All Spans) Shear (lbs)4650 @ 1' 7 1/2"13965 Passed (33%)1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs)20325 @ 7' 6"36387 Passed (56%)1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in)0.244 @ 7' 6"0.358 Passed (L/705)--1.0 D + 1.0 L (All Spans) Total Load Defl. (in)0.345 @ 7' 6"0.717 Passed (L/499)--1.0 D + 1.0 L (All Spans) System : Floor Member Type : Flush Beam Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/480) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 15' o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 15' o/c unless detailed otherwise. Lower Level, Family Room Flush BeamMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Loads Location (Side)Width (0.90)(1.00)Comments 0 - Self Weight (PLF)0 to 15'N/A 21.5 1 - Uniform (PSF)0 to 15' (Front)14'15.0 40.0 floor 2 - Point (lb)0 (Front)N/A 1736 4200 Linked from: Flush Beam Dining, Support 1 3 - Point (lb)15' (Front)N/A 1736 4200 Linked from: Flush Beam Dining, Support 2 Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 30 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 3 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Snow Total Accessories 1 - Trimmer - SPF 3.00"3.00"2.18"1892 223 2276 4391 None 2 - Trimmer - SPF 3.00"3.00"2.25"1950 227 2353 4530 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)4304 @ 5' 4 1/2"5738 (3.00")Passed (75%)--1.0 D + 1.0 S (All Spans) Shear (lbs)2662 @ 1' 1/4"4308 Passed (62%)1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs)5373 @ 2' 9"5919 Passed (91%)1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in)0.033 @ 2' 8 5/16"0.175 Passed (L/999+)--1.0 D + 1.0 S (All Spans) Total Load Defl. (in)0.061 @ 2' 8 3/8"0.262 Passed (L/999+)--1.0 D + 1.0 S (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 5' 6" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 6" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Lower Level, Bedroom# 5 WindowMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Snow Loads Location (Side)Width (0.90)(1.00)(1.15)Comments 0 - Self Weight (PLF)0 to 5' 6"N/A 10.6 1 - Uniform (PSF)0 to 5' 6"1'15.0 40.0 -Floor - Main Level 2 - Uniform (PLF)0 to 5' 6"N/A 90.0 --Wall - Main Level 3 - Uniform (PSF)0 to 2' 9"1'15.0 40.0 -Floor - Upper Level 4 - Uniform (PSF)4' 9" to 5' 6"1'15.0 40.0 -Floor - Upper Level 5 - Uniform (PLF)0 to 2' 9"N/A 80.0 --Wall - Upper Level 6 - Uniform (PLF)4' 9" to 5' 6"N/A 80.0 --Wall - Upper Level 7 - Uniform (PSF)0 to 2' 9"23'20.0 -35.0 Snow - Main 8 - Uniform (PSF)4' 9" to 5' 6"23'20.0 -35.0 Snow - Main 9 - Point (lb)2' 9"N/A 632 45 906 Linked from: Pantry Window, Support 1 10 - Point (lb)4' 9"N/A 632 45 906 Linked from: Pantry Window, Support 2 Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 31 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2 Bearing Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Total Accessories 1 - Trimmer - SPF 1.50"1.50"1.50"502 1310 1812 None 2 - Trimmer - SPF 1.50"1.50"1.50"502 1310 1812 None All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)1813 @ 0 1913 (1.50")Passed (95%)--1.0 D + 1.0 L (All Spans) Shear (lbs)759 @ 10 3/4"2498 Passed (30%)1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs)1397 @ 1' 6 1/2"3431 Passed (41%)1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in)0.006 @ 1' 6 1/2"0.103 Passed (L/999+)--1.0 D + 1.0 L (All Spans) Total Load Defl. (in)0.009 @ 1' 6 1/2"0.154 Passed (L/999+)--1.0 D + 1.0 L (All Spans) System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2009 Design Methodology : ASD •Deflection criteria: LL (L/360) and TL (L/240). •Top Edge Bracing (Lu): Top compression edge must be braced at 3' 1" o/c unless detailed otherwise. •Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 3' 1" o/c unless detailed otherwise. •Applicable calculations are based on NDS. Lower Level, Door Hdr Mech/StorageMEMBER REPORT PASSED Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by NH; plan dated 4/2/2019. Weyerhaeuser Notes Tributary Dead Floor Live Loads Location (Side)Width (0.90)(1.00)Comments 0 - Self Weight (PLF)0 to 3' 1"N/A 7.0 1 - Uniform (PSF)0 to 3' 1"21' 3"15.0 40.0 floor Forte v5.4, Design Engine: V7.1.1.3 4/11/2019 4:25:25 PM Page 32 of 32 20044 Heath Ave, Lakeville, MN.4te Forte Software Operator Jeffrey Doty, Design Supervisor Lyman Lumber Company (952) 470-4866 jeff_doty@lymanlumber.com Job Notes Topaz - The Maverick 20044 Heath Ave, Lakeville, MN 4/11/2019; #23448 M u s t p r o v i d e n u m b e r f o l l o w i n g M P C A a s s i g n m e n t 0 5 / 0 3 / 1 9 X K P _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ O n e T e n T e n H o m e s