Loading...
HomeMy WebLinkAboutSurvey1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 7/28/17.7.Plan No. SBF18.10.01-THE STERLING- A ELEVATIONNOTESLot= 4,163 sq. ft.House/Garage= 2,210 sq. ft.Porch= 135 sq. ft.Driveway= 77 sq. ft.Total Impervious= 2,422 sq. ft. or 58.2 % of lotHARD COVER CALCULATIONSProposedGarage Floor @ Front= 932.0Garage Top of Block= 932.7House Top of Block= 932.7Lowest Floor= 924.7Top of Block at Egress Window= 927.9*Front wall is 9 ft.Lot 10, Block 1, SPIRIT OF BRANDTJEN FARM 18TH ADDITION, Dakota County,MinnesotaPROPERTY DESCRIPTION16291 Dutch Barn Drive, Lakeville, MinnesotaPROPERTY ADDRESSI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 15th day of April, 2019Marcus F. Hampton, MN L.S. No. 47481SURVEYOR'S CERTIFICATEFLOOR ELEVATIONSTop nut of hydrant located at Lot 1, Block 5 = 929.64BENCHMARKDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationJames R. Hill, Inc. 2500 WEST C.R. 42, SUITE 120, BURNSVILLE, MN 55337 PHONE: 952.890.6044 www.jrhinc.com PLANNERS / ENGINEERS / SURVEYORS CERTIFICATE OF SURVEY FOR ROBERT THOMAS HOMESDRAWN BYDATEREVISIONS4/15/2019CAD FILEPROJECT NO.SHEET 1 OF 1390358.dwg390358Lot 10, Block 1, SPIRIT OF BRANDTJEN FARM 18TH ADDITION, Dakota County, MinnesotaJCBPlanning DepartmentApprovedDate:__________________04/26/2019dmoreyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________05/07/2019corlowskyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.