HomeMy WebLinkAbout20172 Harvest Dr SurveyZoning = RS-4
ENGINEERING REVIEWED
Date:__________________05/07/2019 corlowsky
*Draintile connection required.
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush
with the sod. This will be scheduled with thelandscape inspection.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.