Loading...
HomeMy WebLinkAbout20172 Harvest Dr SurveyZoning = RS-4 ENGINEERING REVIEWED Date:__________________05/07/2019 corlowsky *Draintile connection required. The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements.